Verizon: 101 Molloy

Year Built: 1995
Floors: 3
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

A warehouse was redeveloped in 1995 into office space and network switch space for XO Communications (formerly NextLink). In 1997, additional space was redeveloped and leased to Intermedia Communications for a network switch facility. XO Communications was later acquired by Verizon.

Map and Nearby Locations:

105 Molloy St ( 2nd floor )
Verizon Enterprise Sites
Nearby Facilities

Sites within 15 miles of Verizon: 101 Molloy

Distance Site About
0.32 miles H5 Nashville
0.43 miles 365 Nashville (NA1)
3.98 miles Lumen Nashville 1
4.09 miles EdgeConneX Nashville
EdgeConnex has rights to adjacent space to accommodate expansion in Nashville.
4.38 miles RadiusDC: Nashville, TN
Located on a 12-acre plot in the Trinity Hills neighborhood, the completed data center will cover 102,500 square feet (9,500 square meters) by 2026.
5.24 miles Lumen Nashville 2
6.96 miles Nexus Group Nashville
9.40 miles Mapletree: 402 Franklin
In 2020, Carter Validus sold the facility to Mapletree
13.02 miles Flexential Brentwood
The Brentwood site was known as "Nashville 1" and "Nashville 4" when they were operated by Peak 10. Site Usable SqFt Power MW Nashville 1 12,500 .8 MW Nashville 4 6,600 .18 MW Total 19,100 .98 MW
14.75 miles Flexential Cool Springs
The Cool Springs data center was known as "Nashville 2" and "Nashville 3" when it was formerly operated by Peak 10.
16.68 miles Flexential Franklin TN
The site was known as "Nashville 5" when operated by Peak 10.
16.84 miles Compass Franklin I
16.84 miles Tierpoint Nashville NSH

Verizon: 101 Molloy Data Center Photos (See all)

Operating Company

Operated by:
66
Facilities
41
Markets
63MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?