Equinix acquired AT4 in Atlanta as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon ATL1.

Quick Facts:


  • Constructed in 1998
  • Construction Type: Slab on grade, concrete
  • Floor Loading: 250 lbs/sqft
  • Raised Floor Height: 24"
  • Power Density: 120 Watts/SqFt

Map and Nearby Locations:

450 Interstate Parkway North Atlanta
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix Atlanta AT4

Distance Site About
0.80 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
0.99 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
2.65 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
5.42 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
5.47 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
5.67 miles Edged Energy: Atlanta
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
5.83 miles Edged Energy: Atlanta01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
6.03 miles Edged Energy: Atlanta01-03
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
7.57 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
7.57 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
8.01 miles QTS: Atlanta DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
8.05 miles QTS: Atlanta DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
8.35 miles QTS Atlanta Metro
A massive 970,000 sqft data center is one of the largest in the world.
8.37 miles QTS Atlanta DC2
8.42 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
8.91 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
8.96 miles Grindcap: Marietta Campus
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation
9.11 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
9.85 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
9.86 miles Lumen Atlanta 1
9.92 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
9.92 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
9.98 miles Southern Telecom Atlanta
10.17 miles Lumen Atlanta 2
10.17 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
10.19 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
10.21 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
10.29 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
10.29 miles ATLDC 55 Marietta
10.29 miles CoreSite: Atlanta AT1
10.29 miles American Tower: 55 Marietta
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
10.29 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
10.30 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
10.32 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
10.32 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
10.32 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 are located in the 56 Marietta carrier hotel.
10.32 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
10.32 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
10.41 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
11.14 miles Lumen Atlanta 6
11.24 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
11.29 miles DataBank Atlanta ATL2
11.41 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
11.45 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
11.59 miles DataBank: Lithia Springs ATL6
This facility will be the second data center building at DataBank's Lithia Springs Campus.
11.61 miles DataBank: Lithia Springs ATL5
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
11.64 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
11.64 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
11.71 miles Lumen Atlanta 5
12.19 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
12.26 miles Switch: Atlanta 3
12.40 miles Switch Atlanta: The KEEP
12.48 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
12.49 miles Lumen Doraville 1
12.52 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
12.53 miles Hyperscale Data Center Request Dataset
Google completed the expansion of its Douglas County data center in 2016.
12.61 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
12.62 miles T5@Atlanta III Campus
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.63 miles Hyperscale Data Center Request Dataset
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
12.78 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
12.78 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
12.78 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.80 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.84 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.92 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
13.33 miles Equinix Atlanta AT5
Another site Equinix acquired from Verizon.
13.41 miles DataCanopy: Lithia Springs (Atlanta)
13.41 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
13.52 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
13.62 miles Hyperscale Data Center Request Dataset
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
14.30 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
14.49 miles DC BLOX: Atlanta West (ATL1)
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
14.53 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
14.56 miles Flexential: Douglasville 2
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
14.59 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
14.66 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
14.72 miles Hyperscale Data Center Request Dataset
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
14.80 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.85 miles Vantage: Georgia GA2
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
14.87 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.98 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
15.04 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
15.16 miles Flexential Atlanta-Norcross
The Norcross data center features a cloud node on-site.
15.21 miles GI Partners: Alpharetta
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.
15.51 miles Crypto Mining Data Center Request Dataset
An 87,000-square-foot data center in Norcross was purchased and transformed into CleanSpark’s second Bitcoin mining facility
15.54 miles 356 Alpharetta
15.91 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
16.10 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
16.24 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
16.47 miles T5@Atlanta I
T5 Data Centers established its first metro Atlanta facility in Alpharetta in 2011. Stack acquired the Alpharetta facility in 2019 from data center operator T5.
16.50 miles STACK Atlanta ATL01
The site was previously known as T5@Atlanta
16.61 miles Stack: ATL01 Future Expansion
STACK Infrastructure is constructing a new data center facility neighboring ATL01A, at Webb Bridge Rd, Alpharetta, GA, with a substantial footprint of 133000 square feet.
16.62 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
17.54 miles Flexential Atlanta-Alpharetta
Flexential's Alpharetta site is a former Peak 10 facility.
17.83 miles Lumen College Park 1
17.86 miles Hyperscale Data Center Request Dataset
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
18.57 miles Strategic Datasphere: Alpharetta, Georgia
Strategic Datasphere has completed the acquisition of a Tier IV equivalent data center located in Alpharetta, GA. The 165,000 square foot state-of-the-art facility has 5.4 MW of 2N critical capacity that can be expanded to 8.1 MW at N+1.
18.61 miles Mapletree: 1001 Windward
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
19.30 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
19.44 miles Crypto Mining Data Center Request Dataset
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
19.51 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
19.62 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
19.67 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
19.71 miles EdgeConneX: Atlanta ATL11-13
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
19.79 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.

Equinix Atlanta AT4 Data Center Photos (See all)

EQIX AT4 taken from Interstate North Parkway
Source: Baxtel
EQIX AT4 taken from North East Side of Building
Source: Baxtel
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

313
Facilities
45
Markets
2035MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?