Verizon: 4000 Highland

Latest Podcast 4000 Highland Parkway SE
Operational
Fully operational facility
Operated by:

Verizon: 4000 Highland

Floors: 2
░░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The site is a previous XO Communications facility

Map and Nearby Locations

4000 Highland Parkway SE ( 1st Floor )
Verizon Enterprise Sites
Nearby Facilities

Sites within 15 miles of Verizon: 4000 Highland

Distance Site About
1.40 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
2.77 miles Edged Energy: ATL01-01
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
2.92 miles Edged Energy: ATL01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
3.13 miles Edged Energy: ATL01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
4.53 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
4.72 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
5.42 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
5.65 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
5.74 miles QTS: Atlanta-1 DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
5.88 miles QTS: Atlanta-1 DC1
A massive 970,000 sqft data center is one of the largest in the world.
5.90 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
5.95 miles QTS: Atlanta-1 DC2
6.01 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
6.24 miles DataBank: Lithia Springs ATL5
ATL5 is the first of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 415,000 square feet and 160,200 square feet of raised floor. Construction began in 2024.
6.34 miles DataBank: Lithia Springs ATL6
ATL6 is the second and larger of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 460,000 square feet and 240,000 square feet of raised floor. Construction began in 2025.
6.78 miles Prime Group: Edge GA10, Marietta
The Edge GA10 is a proposed data center in Marietta, Georgia, developed through the adaptive reuse of an existing self-storage facility outside Atlanta. Most of the site would continue operating as self-storage alongside the converted digital infrastructure space.
6.82 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
6.94 miles Switch: Atlanta 4
Fourth building at Switch's The Keep campus, on its own parcel at 4 Switch Way in Lithia Springs. Under construction since 2024.
6.95 miles Switch: Atlanta 3
7.00 miles Switch: Atlanta 2
Second building at Switch's The Keep campus, on its own parcel at 2 Switch Way in Lithia Springs. Under construction since 2024.
7.05 miles Switch: Atlanta 1
First building at Switch's The Keep campus, on its own parcel at 1 Switch Way in Lithia Springs. A global logistics company signed as the campus anchor tenant in 2020.
7.17 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.21 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
7.22 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.23 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
7.28 miles STACK: ATL02A
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
7.38 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
7.38 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
7.40 miles T5@Atlanta III Bldg 1
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
7.53 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
7.58 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
7.58 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
7.60 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
7.68 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
7.88 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
7.93 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
7.93 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
7.93 miles DataBank Atlanta ATL2
8.05 miles DataCanopy: Lithia Springs (Atlanta)
8.05 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
8.08 miles Southern Telecom Atlanta
8.09 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
8.12 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
8.14 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
8.15 miles Lumen Atlanta 1
8.16 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
8.17 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
8.17 miles American Tower: 55 Marietta
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
8.17 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
8.17 miles ATLDC 55 Marietta
8.17 miles CoreSite: Atlanta AT1
8.18 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
8.18 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
8.18 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 were located in the 56 Marietta carrier hotel. Equinix closed both on July 31, 2024.
8.18 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
8.18 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
8.20 miles Lumen Atlanta 2
8.20 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
8.22 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
8.23 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
8.26 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.37 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
8.43 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
8.46 miles Lumen Atlanta 5
8.95 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
9.01 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
9.16 miles DC BLOX: ATL1-A
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
9.19 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
9.21 miles Flexential: Douglasville 2
Douglasville 2 is the second building on Flexential's Atlanta-Douglasville campus at 1750 N. River Road, Douglasville, Georgia. The 310,000 sq ft building opened in 2024.
9.32 miles Flexential: Douglasville 1
Douglasville 1 is the first building on Flexential's Atlanta-Douglasville campus at 1700 N. River Road, Douglasville, Georgia. The 204,514 sq ft building opened in 2023.
9.38 miles CoreWeave: Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
9.49 miles Point UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.55 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.55 miles Vantage: GA21
Vantage Data Centers is building a data center campus outside Atlanta, Georgia. The project, known as Westlake, will comprise 754,220 square feet (70,070 sq m) on undeveloped land west of Plummer Road.
9.61 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
9.64 miles Vantage: GA22
This facility is part of Vantage's Project Westlake outside Atlanta, Georgia.
9.66 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.72 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.74 miles Lumen Atlanta 6
9.77 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
10.53 miles Vantage: Douglasville 1
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
10.72 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
10.86 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
11.78 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
11.79 miles Grindcap: Marietta 1
DC-1 is the larger of two planned two-story buildings on Grindcap's 31-acre Bells Ferry Road site in Marietta, Georgia, beside a planned on-site substation. Rezoned in 2025; no permits issued as of 2026.
12.16 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
12.16 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
12.90 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
12.92 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.47 miles Lumen College Park 1
14.32 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.42 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.44 miles EdgeConneX ATL11
14.46 miles Hub TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.50 miles EdgeConneX ATL12
14.57 miles EdgeConneX ATL13
14.88 miles RSC: Stonewall Tell Data Center
RSC Investment Management plans a 1.9 million square foot, three-building data center campus on Stonewall Tell Road in the City of South Fulton, southwest of Atlanta.
14.96 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.39 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.43 miles Hub UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.50 miles Vantage: GA12
This facility is part of Vantage's Stacks Rd Campus in Georgia.
15.55 miles Vantage: GA11
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
16.26 miles Lumen Doraville 1
17.25 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
17.49 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
17.56 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
17.57 miles Equinix Atlanta AT5
Former Verizon data center in Norcross that Equinix acquired in 2017. Equinix closed AT5 on June 30, 2024.
18.38 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
18.74 miles Stream: ATL-A2
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.78 miles Stream: ATL-A6
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.81 miles Stream: ATL-A7
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.87 miles Stream: ATL-A1
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
18.90 miles Stream: ATL-A8
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.90 miles Stream: ATL-A9
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.95 miles Stream: ATL-A3
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.99 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.02 miles Stream: ATL-A5
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
19.45 miles Ridge ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.50 miles Flexential Atlanta-Norcross 1
The Norcross data center features a cloud node on-site.
19.51 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
19.71 miles Douglas Waldrop Bldg-1
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
19.72 miles Douglas Waldrop Bldg-2
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.

Verizon: 4000 Highland Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Verizon Secures Approval for $20bn Frontier Acquisition
Verizon Secures Approval for $20bn Frontier Acquisition

Verizon Secures Approval for $20bn Frontier Acquisition

January 16, 2026 Verizon Enterprise

Verizon has secured all regulatory approvals to close its acquisition of Frontier Communications. It comes as the carrier this week received approval from the California Public Utilities Commission (CPUC) to push ahead with the deal.“California isn’t just approving a merger, we’re securing real...

Read more
Read Verizon Names Dan Schulman as CEO
Verizon Names Dan Schulman as CEO

Verizon Names Dan Schulman as CEO

October 06, 2025 Verizon Enterprise

Verizon has announced former PayPal CEO Dan Schulman as the carrier's next CEO. The CEO transition at the company means that current chief Hans Vestberg steps down from the role, which he has held since 2018.“I believe in Verizon and its future, and I am honored to be chosen to serve as CEO,”...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Verizon Launches AI-centric Network ffering
Verizon Launches AI-centric Network ffering

Verizon Launches AI-centric Network ffering

January 27, 2025 Verizon Enterprise

Verizon has launched a new AI-centric network offering called Verizon AI Connect, an integrated suite of solutions and products designed to “enable businesses to deploy artificial intelligence (AI) workloads at scale.” The telco s looking to make its underutilized data center assets available for...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?