Edged Energy: ATL01-01

Latest Podcast 1800 Thomas Street NW
Operational
Fully operational facility
Operated by:

Edged Energy: ATL01-01

Short Code: ATL01-01
Year Built: 2024
PUE: 1.15
Utility Provider: Georgia Power
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Data center provider Edged Energy is building a new data center campus in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.

  • The first building (ATL01) came online in 2024.
  • The campus uses a modular system, supporting densities of up to 70kW per rack with air cooling.

Map and Nearby Locations

1800 Thomas Street NW
Edged Energy Sites
Nearby Facilities

Edged Energy: ATL01-01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: ATL01-01

Distance Site About
0.18 miles Edged Energy: ATL01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
0.43 miles Edged Energy: ATL01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
2.10 miles Youngwoo: 1611 Ellsworth
Youngwoo & Associates plans a mixed-use project at 1611 Ellsworth Industrial Boulevard in Atlanta's Blandtown area, pairing a data center of about 400,000 to 500,000 sq ft with a hotel and apartments.
2.77 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
2.99 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
3.08 miles QTS: Atlanta-1 DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
3.28 miles QTS: Atlanta-1 DC1
A massive 970,000 sqft data center is one of the largest in the world.
3.31 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
3.33 miles QTS: Atlanta-1 DC2
3.35 miles xAI: Atlanta (QTS Atlanta-1)
4.14 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
4.84 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
4.85 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
5.13 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
5.27 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
5.27 miles Hivelocity: ATL2 (250 Williams)
5.27 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
5.28 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
5.44 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
5.45 miles Lumen Atlanta 1
5.48 miles Southern Telecom Atlanta
5.54 miles Lumen Atlanta 2
5.54 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
5.55 miles Coloblox: 55 Marietta
5.55 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
5.55 miles ATLDC 55 Marietta
5.56 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
5.56 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
5.56 miles CoreSite: AT1 Atlanta (55 Marietta)
CoreSite operates its AT1 colocation facility on four floors of the 55 Marietta Street carrier hotel in downtown Atlanta. American Tower bought the Colo Atl business in 2019 and moved the facility to CoreSite after acquiring CoreSite in 2021.
5.56 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
5.56 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 were located in the 56 Marietta carrier hotel. Equinix closed both on July 31, 2024.
5.56 miles CloudFirst: Colo@55 (55 Marietta)
5.57 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
5.57 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
5.57 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
5.57 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
5.66 miles CloudFirst: Atlanta (34 Peachtree)
5.67 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
5.78 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
5.78 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
5.82 miles DataBank Atlanta ATL2
5.82 miles Digital Realty: West End (713 RDA Blvd)
Digital Realty proposes a two-story, 282,000 sq ft data exchange with ground-floor retail on a vacant former printing plant in Atlanta's West End. The project needs a city zoning exemption.
6.00 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
6.01 miles Lambda: Atlanta (EdgeConneX ATL02)
6.23 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
6.30 miles Lumen Atlanta 5
6.36 miles Verizon: Atlanta (999 Lee St SW)
6.69 miles DataBank: Lithia Springs ATL5
ATL5 is the first of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 415,000 square feet and 160,200 square feet of raised floor. Construction began in 2024.
6.75 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
6.78 miles DataBank: Lithia Springs ATL6
ATL6 is the second and larger of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 460,000 square feet and 240,000 square feet of raised floor. Construction began in 2025.
6.83 miles Saragon: Atlanta (1190 Allene)
Saragon's Atlanta data center at 1190 Allene Avenue SW offers about 36,000 sq ft of colocation space, with cabinets and private cages. Cogent Communications sold the building to Saragon, an I Squared Capital platform, in 2026.
7.03 miles Lumen Atlanta 6
7.85 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
7.93 miles Prime Group: Edge GA10, Marietta
The Edge GA10 is a proposed data center in Marietta, Georgia, developed through the adaptive reuse of an existing self-storage facility outside Atlanta. Most of the site would continue operating as self-storage alongside the converted digital infrastructure space.
8.36 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
8.44 miles Switch: Atlanta 1
First building at Switch's The Keep campus, on its own parcel at 1 Switch Way in Lithia Springs. A global logistics company signed as the campus anchor tenant in 2020.
8.45 miles Switch: Atlanta 2
Second building at Switch's The Keep campus, on its own parcel at 2 Switch Way in Lithia Springs. Under construction since 2024.
8.47 miles Switch: Atlanta 3
8.49 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.51 miles Metro TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.52 miles Mapletree: 375 Riverside Parkway
375 Riverside Parkway is a single-story data center building of about 250,000 sq ft in Lithia Springs, west of Atlanta. Digital Realty sold it to a Mapletree joint venture in January 2020, and Csquare operates two colocation suites inside.
8.52 miles Switch: Atlanta 4
Fourth building at Switch's The Keep campus, on its own parcel at 4 Switch Way in Lithia Springs. Under construction since 2024.
8.53 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
8.71 miles STACK: ATL02D
8.75 miles STACK: ATL02C
8.88 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
8.89 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.96 miles STACK: ATL02A
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
8.96 miles Campus BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.06 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
9.08 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.08 miles T5@Atlanta III Bldg 1
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
9.19 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
9.22 miles Plaza TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.23 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
9.30 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.30 miles Prime PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.31 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
9.32 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
9.33 miles DataCanopy: Lithia Springs (Atlanta)
9.34 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
9.58 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.73 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
10.25 miles Vantage: GA21
Vantage Data Centers is building a data center campus outside Atlanta, Georgia. The project, known as Westlake, will comprise 754,220 square feet (70,070 sq m) on undeveloped land west of Plummer Road.
10.26 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
10.32 miles Vantage: GA22
This facility is part of Vantage's Project Westlake outside Atlanta, Georgia.
10.49 miles Flexential: Douglasville 2
Douglasville 2 is the second building on Flexential's Atlanta-Douglasville campus at 1750 N. River Road, Douglasville, Georgia. The 310,000 sq ft building opened in 2024.
10.52 miles DC BLOX: ATL1-A
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
10.53 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
10.70 miles CoreWeave: Douglasville, GA
CoreWeave, a GPU cloud provider, leases data center capacity inside Flexential's Douglasville facility on North River Road, west of Atlanta. Flexential owns and operates the building.
10.71 miles Flexential: Douglasville 1
Douglasville 1 is the first building on Flexential's Atlanta-Douglasville campus at 1700 N. River Road, Douglasville, Georgia. The 204,514 sq ft building opened in 2023.
10.87 miles Alembic: Dunwoody (40 Perimeter Center)
10.88 miles Internap Atlanta: 40 Perimeter Center
Internap (now HorizonIQ) leased colocation space at 40 Perimeter Center East in Dunwoody from 2017. The building is now being renovated for a new operator.
10.88 miles Cloud StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.93 miles Plaza ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.03 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.04 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
11.09 miles Ridge TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.09 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
11.63 miles Vantage: Douglasville 1
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
11.83 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.00 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.05 miles Shadowbox Studios: International Park (DeKalb)
Shadowbox Studios proposes a five-building data center campus on surplus industrial land beside its film studios in south DeKalb County. A county moratorium has stalled the plan.
12.16 miles Lumen College Park 1
12.51 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.60 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.61 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
13.63 miles Grindcap: Marietta 1
DC-1 is the larger of two planned two-story buildings on Grindcap's 31-acre Bells Ferry Road site in Marietta, Georgia, beside a planned on-site substation. Rezoned in 2025; no permits issued as of 2026.
13.76 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.09 miles EdgeConneX ATL11
14.10 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.20 miles EdgeConneX ATL12
14.20 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.26 miles EdgeConneX ATL13
14.27 miles East TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.33 miles Lumen Doraville 1
14.47 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
14.56 miles RSC: Stonewall Tell Data Center
RSC Investment Management plans a 1.9 million square foot, three-building data center campus on Stonewall Tell Road in the City of South Fulton, southwest of Atlanta.
14.69 miles Digital Realty: ATL16 (Fort Gillem)
14.75 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
14.94 miles Vantage: GA12
This facility is part of Vantage's Stacks Rd Campus in Georgia.
14.98 miles Vantage: GA11
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
15.06 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
15.24 miles Ridge TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.25 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.86 miles Equinix Atlanta AT5
Former Verizon data center in Norcross that Equinix acquired in 2017. Equinix closed AT5 on June 30, 2024.
17.52 miles Tower OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.59 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
17.69 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
17.82 miles Flexential Atlanta-Norcross 1
The Norcross data center features a cloud node on-site.
18.69 miles Central PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.90 miles GI Partners: Alpharetta
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.

Edged Energy: ATL01-01 Data Center Photos See all

Edged Energy Atlanta Campus Sitemap
Source: Edged Energy
Edged Energy Atlanta Campus Sitemap
Source: Edged Energy
Edged's Atlanta Campus
Source: Baxtel
Edged Energy Atlanta Campus Sitemap
Source: Edged Energy
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Edged Completes Construction Of Data Centers In Council Bluffs, Iowa
US data center operator Edged has completed the structural work on two facilities in Council Bluffs, Iowa. The company announced that OMA01-1 and OMA01-2 have reached the topping-out stage.

"Rea...

Edged Completes Construction Of Data Centers In Council Bluffs, Iowa

September 14, 2026 Edged Energy

US data center operator Edged has completed the structural work on two facilities in Council Bluffs, Iowa. The company announced that OMA01-1 and OMA01-2 have reached the topping-out stage. "Reaching this milestone reflects our continued commitment to investing in communities that are...

Read more
Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.