Equinix Atlanta AT1

Latest Podcast 180 Peachtree Street NW
Operational
Fully operational facility
Operated by:

Equinix Atlanta AT1

Short Code: AT1
Year Built: 2010
Floors: 6
Ownership: Equinix does not own the building.
This site is leased from Mapletree Redwood Data Centre Trust in the 180 Peachtree building
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

A former Switch and Data site, Equinix's AT1 is a 6-story reinforced steel and concrete with brick face building. It is located 11 miles from Hartsfield-Jackson Atlanta International Airport (ATL).

History

Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.

Map and Nearby Locations

180 Peachtree Street NW ( 2nd & 6th floors )
Equinix Sites
Nearby Facilities

Equinix Atlanta AT1 Power Growth Over Time

+37% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix Atlanta AT1

Distance Site About
0.00 miles Lumen Atlanta 2
0.02 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
0.21 miles Southern Telecom Atlanta
0.24 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
0.26 miles CoreSite: Atlanta AT1
0.26 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
0.26 miles American Tower: 55 Marietta
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
0.26 miles ATLDC 55 Marietta
0.26 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
0.27 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
0.27 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
0.28 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
0.28 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
0.30 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
0.31 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 were located in the 56 Marietta carrier hotel. Equinix closed both on July 31, 2024.
0.31 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
0.31 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
0.34 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
0.51 miles Lumen Atlanta 1
0.51 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
1.16 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
1.70 miles Lumen Atlanta 6
2.25 miles QTS: Atlanta-1 DC2
2.31 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
2.32 miles QTS: Atlanta-1 DC1
A massive 970,000 sqft data center is one of the largest in the world.
2.47 miles QTS: Atlanta-1 DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
2.56 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
2.74 miles Lumen Atlanta 5
2.74 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
2.77 miles DataBank Atlanta ATL2
2.77 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
2.78 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
2.88 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
5.14 miles Edged Energy: ATL01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
5.38 miles Edged Energy: ATL01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
5.55 miles Edged Energy: ATL01-01
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
7.19 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
8.20 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
8.52 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
8.74 miles DataBank: Lithia Springs ATL5
ATL5 is the first of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 415,000 square feet and 160,200 square feet of raised floor. Construction began in 2024.
8.81 miles DataBank: Lithia Springs ATL6
ATL6 is the second and larger of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 460,000 square feet and 240,000 square feet of raised floor. Construction began in 2025.
9.23 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
9.26 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
9.30 miles Lumen College Park 1
9.60 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
9.67 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
10.01 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
10.08 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
10.16 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
10.17 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
10.86 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.96 miles Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.05 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
11.15 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
11.15 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
11.33 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.44 miles Center OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.45 miles Switch: Atlanta 1
First building at Switch's The Keep campus, on its own parcel at 1 Switch Way in Lithia Springs. A global logistics company signed as the campus anchor tenant in 2020.
11.56 miles Switch: Atlanta 2
Second building at Switch's The Keep campus, on its own parcel at 2 Switch Way in Lithia Springs. Under construction since 2024.
11.68 miles Switch: Atlanta 3
11.80 miles Vantage: GA21
Vantage Data Centers is building a data center campus outside Atlanta, Georgia. The project, known as Westlake, will comprise 754,220 square feet (70,070 sq m) on undeveloped land west of Plummer Road.
11.81 miles Switch: Atlanta 4
Fourth building at Switch's The Keep campus, on its own parcel at 4 Switch Way in Lithia Springs. Under construction since 2024.
11.83 miles Vantage: GA22
This facility is part of Vantage's Project Westlake outside Atlanta, Georgia.
12.03 miles DataCanopy: Lithia Springs (Atlanta)
12.03 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
12.12 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
12.12 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
12.22 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
12.29 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.32 miles STACK: ATL02A
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
12.40 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.47 miles T5@Atlanta III Bldg 1
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.52 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.60 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.61 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.72 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
12.74 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
12.84 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
12.86 miles Prime Group: Edge GA10, Marietta
The Edge GA10 is a proposed data center in Marietta, Georgia, developed through the adaptive reuse of an existing self-storage facility outside Atlanta. Most of the site would continue operating as self-storage alongside the converted digital infrastructure space.
12.98 miles Flexential: Douglasville 2
Douglasville 2 is the second building on Flexential's Atlanta-Douglasville campus at 1750 N. River Road, Douglasville, Georgia. The 310,000 sq ft building opened in 2024.
13.13 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
13.16 miles DC BLOX: ATL1-A
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
13.21 miles Flexential: Douglasville 1
Douglasville 1 is the first building on Flexential's Atlanta-Douglasville campus at 1700 N. River Road, Douglasville, Georgia. The 204,514 sq ft building opened in 2023.
13.25 miles CoreWeave: Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
13.33 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.37 miles Vantage: GA12
This facility is part of Vantage's Stacks Rd Campus in Georgia.
13.39 miles Vantage: GA11
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
13.41 miles West ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.48 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
13.50 miles Lumen Doraville 1
13.52 miles RSC: Stonewall Tell Data Center
RSC Investment Management plans a 1.9 million square foot, three-building data center campus on Stonewall Tell Road in the City of South Fulton, southwest of Atlanta.
13.52 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.54 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.55 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.63 miles EdgeConneX ATL11
13.63 miles EdgeConneX ATL12
13.63 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.63 miles EdgeConneX ATL13
13.67 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.69 miles Vantage: Douglasville 1
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.88 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
14.07 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
14.42 miles Metro PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.49 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.31 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
15.49 miles Equinix Atlanta AT5
Former Verizon data center in Norcross that Equinix acquired in 2017. Equinix closed AT5 on June 30, 2024.
16.48 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.37 miles Flexential Atlanta-Norcross 1
The Norcross data center features a cloud node on-site.
17.37 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
18.82 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
18.86 miles Grindcap: Marietta 1
DC-1 is the larger of two planned two-story buildings on Grindcap's 31-acre Bells Ferry Road site in Marietta, Georgia, beside a planned on-site substation. Rezoned in 2025; no permits issued as of 2026.
19.16 miles Crow Holdings: Fayetteville, GA
Crow Holdings Development has officially withdrawn its application to construct a single, two-story data center and dedicated substation on a 37.4-acre parcel of land in Fayetteville, Georgia.
19.44 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
19.65 miles Edge CenterInterested in this information?Contact us
19.92 miles Strategic Real Estate Partners, Conyers, GA
Strategic Real Estate Partners plans to build a three-building data center campus in Conyers, a suburb about 20 miles southeast of Atlanta. The site will feature 837,500 sq ft (77,806 sqm) of data center space across three buildings.
19.97 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Equinix Atlanta AT1 Data Center Photos See all

Equinix offers the Fiber Connect product between EQIX AT1 (at 180 Peachtree) and EQIX AT2/3 (at 56 Marietta)
Fiber Connect between AT1 and AT2
Source: EQIX

Equinix offers the Fiber Connect product between EQIX AT1 (at 180 Peachtree) and EQIX AT2/3 (at 56 Marietta)

Exterior of 180 Peachtree at Twilight
Source: Baxtel
Conduits Galore
Source: Stevens & Wilkinson
Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.
180 Peachtree Was Formerly a Department Store
Source: Baxtel

Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.

Anyone up for a game of Ping Pong?
Ping Pong Stadium
Source: Baxtel

Anyone up for a game of Ping Pong?

Colo Cage Space
Source: Baxtel
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers
Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed...

Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers

September 30, 2026 Equinix

Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed to reduce the need for specialized cabling and hardware in data centers. Schneider said the...

Read more
Read Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer
Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryo...

Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer

September 03, 2026 Equinix

Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryogenic cooling and control electronics. The chip can be replaced to increase the qubit count without...

Read more
Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?