365 Data Centers CEO Bob DeSantis to Retire
October 07, 2025
365 Data Centers
The facility was formerly operated by Sungard and known as ATL-5600.
| Distance | Site | About |
|---|---|---|
| 1.40 miles | Verizon: 4000 Highland |
The site is a previous XO Communications facility
|
| 4.14 miles | Edged Energy: Atlanta |
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
|
| 4.30 miles | Edged Energy: Atlanta01-02 |
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
|
| 4.49 miles | Coloblox: ATL2 |
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
|
| 4.52 miles | Edged Energy: Atlanta01-03 |
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
|
| 4.69 miles | Coloblox: ATL1 |
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
|
| 5.47 miles | Equinix Atlanta AT4 |
Equinix acquired AT4 from Verizon in May 2017
|
| 6.31 miles | CoreSite: Atlanta AT2 |
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
|
| 6.44 miles | DataBank: Atlanta ATL4 |
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
|
| 6.82 miles | DataBank: Lithia Springs ATL5 |
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
|
| 6.83 miles | DataBank: Lithia Springs ATL6 |
This facility will be the second data center building at DataBank's Lithia Springs Campus.
|
| 6.85 miles | Switch: Atlanta 3 | |
| 7.03 miles | STACK: ATL02B |
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
|
| 7.04 miles | Switch Atlanta: The KEEP |
|
| 7.05 miles | QTS: Atlanta DC3 |
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
|
| 7.07 miles | STACK Atlanta ATL02 |
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
|
| 7.14 miles | QTS: Atlanta DC4 |
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
|
| 7.17 miles | T5@Atlanta III Campus |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 7.18 miles | Hyperscale Data Center Request Dataset |
Google completed the expansion of its Douglas County data center in 2016.
|
| 7.29 miles | QTS Atlanta Metro |
A massive 970,000 sqft data center is one of the largest in the world.
|
| 7.31 miles | Internap Atlanta ACS003 |
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
|
| 7.31 miles | Hyperscale Data Center Request Dataset |
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
|
| 7.33 miles | Digital Realty: ATL11 |
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
|
| 7.34 miles | T5@Atlanta III Bldg 5 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 7.35 miles | T5@Atlanta III Bldg 2 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 7.36 miles | QTS Atlanta DC2 | |
| 7.40 miles | T5@Atlanta III Bldg 4 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 7.47 miles | T5@Atlanta III Bldg 3 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 7.51 miles | Centersquare: ATL1 |
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
|
| 7.51 miles | 375 Riverside - Digital Realty |
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
|
| 8.06 miles | DataCanopy: Lithia Springs (Atlanta) | |
| 8.06 miles | PwC Lithia Springs |
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
|
| 8.09 miles | Rock House Road data center, Atlanta |
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
|
| 8.25 miles | Hyperscale Data Center Request Dataset |
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
|
| 8.91 miles | DC BLOX: ATL1-C |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
|
| 8.98 miles | DataBank Atlanta ATL1 |
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
|
| 9.08 miles | DC BLOX: Atlanta West (ATL1) |
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
|
| 9.13 miles | DC BLOX: ATL1-B |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
|
| 9.18 miles | Flexential: Douglasville 2 |
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
|
| 9.21 miles | DataBank Atlanta ATL3 |
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
|
| 9.26 miles | Flexential Douglasville |
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
|
| 9.27 miles | DataBank Atlanta ATL2 |
|
| 9.32 miles | Hyperscale Data Center Request Dataset |
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
|
| 9.33 miles | Evocative ATL1 |
Built in 2000 and was subsequently expanded in 2012
|
| 9.33 miles | Digital Realty: ATL14 |
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
|
| 9.38 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 9.45 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 9.46 miles | EdgeConneX ATL02 |
In 2018, EdgeConneX launched its second data center in Atlanta.
|
| 9.48 miles | Southern Telecom Atlanta | |
| 9.49 miles | Aptum Atlanta |
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
|
| 9.54 miles | H5 Atlanta |
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
|
| 9.55 miles | Lumen Atlanta 1 | |
| 9.56 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 9.57 miles | Digital Realty: 10 Forsyth St NW |
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
|
| 9.58 miles | RadiusDC: 55 Marietta |
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
|
| 9.58 miles | QuadraNet Atlanta |
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
|
| 9.58 miles | American Tower: 55 Marietta |
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
|
| 9.58 miles | ATLDC 55 Marietta | |
| 9.58 miles | CoreSite: Atlanta AT1 | |
| 9.58 miles | FOGO Atlanta |
Small site with in the 56 carrier hotel.
|
| 9.58 miles | 56 Marietta Carrier Hotel - Digital Realty |
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
|
| 9.58 miles | HostPapa GA1 |
10,000sqft data center with in Atlanta's telecom hotel
|
| 9.58 miles | Equinix Atlanta AT2 AT3 |
Equinix AT2 and AT3 are located in the 56 Marietta carrier hotel.
|
| 9.59 miles | Cogent: Atlanta |
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
|
| 9.60 miles | Equinix Atlanta AT1 |
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
|
| 9.60 miles | Lumen Atlanta 2 |
|
| 9.62 miles | 180 Peachtree |
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
|
| 9.63 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 9.72 miles | EdgeConneX Atlanta Campus |
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
|
| 9.72 miles | EdgeConneX ATL01 |
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
|
| 9.72 miles | Vantage: Georgia GA2 |
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
|
| 9.80 miles | Lumen Atlanta 5 | |
| 9.83 miles | AT&T Southern Bell Telephone Company Building |
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
|
| 10.36 miles | Cogent: Atlanta 2 |
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
|
| 10.47 miles | American Tower: SW Atlanta |
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
|
| 10.57 miles | Vantage: Douglasville |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 10.75 miles | Grindcap: Marietta 2 |
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
|
| 10.75 miles | Vantage: Douglasville 2 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 10.76 miles | Grindcap: Marietta Campus |
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation
|
| 10.87 miles | Vantage: Douglasville 3 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 11.14 miles | Lumen Atlanta 6 | |
| 12.69 miles | Internap Atlanta: 40 Perimeter Center |
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
|
| 12.69 miles | 40 Perimeter Center: Lincoln Rackhouse |
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
|
| 13.76 miles | Hyperscale Data Center Request Dataset |
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
|
| 14.14 miles | Menlo Digital: Atlanta, GA |
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
|
| 14.55 miles | Lumen College Park 1 | |
| 14.96 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 15.07 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 15.09 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 15.11 miles | EdgeConneX: Atlanta ATL11-13 |
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
|
| 15.99 miles | Crypto Mining Data Center Request Dataset |
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
|
| 16.32 miles | Vantage: Georgia GA1 |
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
|
| 17.07 miles | Lumen Doraville 1 | |
| 17.92 miles | Stream: Atlanta West |
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
|
| 18.26 miles | Equinix Atlanta AT5 |
Another site Equinix acquired from Verizon.
|
| 18.63 miles | PCC-DeKalb: Ellenwood, GA |
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
|
| 18.86 miles | TA Realty: Ellenwood, ATL |
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
|
| 18.90 miles | Digital Realty: ATL 15 |
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
|
| 19.02 miles | Douglas Waldrop Bldg-2 |
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
|
| 19.02 miles | Project Douglas Waldrop |
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
|
| 19.23 miles | TA Realty: Red Oak ATL03 |
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
|
365’s CEO is Bob DeSantis, who co-founded Xand, a data center provider acquired in 2014 by TierPoint
In 2016 and 2017, the company exited Western Markets: Phoenix, Emeryville, Seattle, San Jose,
365 Data Centers is a leading provider of hybrid data center solutions in ten strategic edge markets. With data centers in Boca Raton, Buffalo, Chicago, Detroit, Fort Lauderdale, Indianapolis, Nashville, Philadelphia, New York and Tampa, the company offers a combined 195,000 square feet and 13 MW of power in place to serve clients. The company is carrier-neutral and offers Colocation, Network, IP, DRaaS, Cloud compute and storage, and Business Continuity services. 365 Data Centers is headquartered in Norwalk, Connecticut.
In September 2017, 365 Data Centers acquired hybrid data center and cloud services provider Host.net. The acquisition added Boca Raton and Fort Lauderdale facilities to 365 Data Center’s locations and allowed the company to offer enhanced services, including nationwide Metro Ethernet, long haul, and MPLS network/transport services, robust blended IP choices, direct, low latency connectivity to the NAP of the Americas and cloud/colocation hybrid solutions.
October 07, 2025
365 Data Centers
September 12, 2025
Atlanta
May 10, 2024
Atlanta
July 04, 2023
Atlanta
June 20, 2023
365 Data Centers
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas