Aligned: ATL-01

Latest Podcast 1551 N River Rd
Operational
Fully operational facility
Operated by:

Aligned: ATL-01

Short Code: ATL01
Year Built: 2025
Utility Provider: Georgia Power
Lot Size: 44 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Site History

  • 2022: Building completed as the Sweetwater Creek Logistics Center, a ~280,140 sq ft spec industrial/warehouse property on ~44 acres (DCD zoning).
  • Nov 2023: Aligned filed a Georgia EPD air-quality permit application (No. 29094) to construct and operate the building as a new data center with emergency backup generators (public comment closed 2023-12-22).
  • 2024–2025: Data center conversion and fit-out.
  • ~2025 (est.): Commissioned and brought online as Aligned's ATL-01; listed as operational and fully built out by early 2026. Sits in the Lithia Springs / Douglas County cluster alongside DataBank, DC BLOX, Switch ("The KEEP"), Stack, and T5.

Project Profile

  • Cooling: Aligned Delta³ air-cooling arrays with DeltaFlow liquid cooling for high-density GPU workloads
  • Carrier-neutral with diverse dark and lit fiber and dedicated cloud on-ramps

Map and Nearby Locations

1551 N River Rd
Aligned Sites
Nearby Facilities

Aligned: ATL-01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aligned: ATL-01

Distance Site About
0.38 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
0.40 miles CoreWeave: Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
0.42 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
0.46 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
0.47 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
0.52 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
0.57 miles Flexential: Douglasville 2
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
0.61 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
0.66 miles DC BLOX: Atlanta West (ATL1)
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
0.82 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
1.01 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
1.13 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
1.20 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
1.50 miles Hyperscale Data Center Request Dataset
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
1.70 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
1.73 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
1.73 miles DataCanopy: Lithia Springs (Atlanta)
2.23 miles Vantage: Georgia GA2
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
2.43 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
2.46 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
2.48 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
2.53 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
2.53 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
2.57 miles Hyperscale Data Center Request Dataset
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
2.57 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
2.60 miles Hyperscale Data Center Request Dataset
Google completed the expansion of its Douglas County data center in 2016.
2.68 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
2.72 miles Switch Atlanta: The KEEP
2.73 miles T5@Atlanta III Campus
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
2.78 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
2.78 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
2.87 miles Switch: Atlanta 3
4.42 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
4.74 miles DataBank: Lithia Springs ATL5
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
4.84 miles DataBank: Lithia Springs ATL6
This facility will be the second data center building at DataBank's Lithia Springs Campus.
6.68 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
7.69 miles EdgeConneX: Atlanta ATL11-13
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
7.72 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
7.72 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
7.80 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
8.32 miles Hyperscale Data Center Request Dataset
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
9.72 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
9.75 miles Vantage: Georgia GA1
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
9.77 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
10.93 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
10.93 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.04 miles Edged Energy: Atlanta01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
11.04 miles Edged Energy: Atlanta
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
11.05 miles Edged Energy: Atlanta01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
11.06 miles Lumen College Park 1
11.07 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.08 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
11.13 miles DataBank Atlanta ATL2
11.15 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.15 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.17 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.20 miles Carrier-Neutral Data Center Request Dataset
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
11.24 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
11.30 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.30 miles Carrier-Neutral Data Center Request Dataset
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
11.44 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
11.44 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
11.51 miles Lumen Atlanta 5
11.64 miles Crypto Mining Data Center Request Dataset
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
11.68 miles Project Douglas Waldrop
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
11.73 miles Douglas Waldrop Bldg-2
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
11.86 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
11.87 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
11.92 miles QTS: Atlanta 1 Campus
A massive 970,000 sqft data center is one of the largest in the world.
11.98 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
12.01 miles QTS: Atlanta-1 DC2
12.07 miles QTS: Atlanta-1 DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
12.65 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
12.80 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
13.21 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
13.23 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
13.24 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
13.24 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
13.24 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 are located in the 56 Marietta carrier hotel.
13.24 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
13.26 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
13.27 miles American Tower: 55 Marietta
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
13.27 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
13.27 miles CoreSite: Atlanta AT1
13.27 miles ATLDC 55 Marietta
13.27 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
13.32 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
13.32 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
13.45 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
13.48 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
13.48 miles Lumen Atlanta 2
13.48 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
13.51 miles Southern Telecom Atlanta
13.57 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
13.73 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
13.79 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
13.80 miles Lumen Atlanta 1
13.98 miles Hyperscale Data Center Request Dataset
14.05 miles Hyperscale Data Center Request Dataset
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
14.09 miles Hickman Property Project
The development is planned for a 700-acre site in Douglas County, with approximately 35 acres situated within the city limits of Villa Rica, which lies about 30 miles west of Atlanta.
14.09 miles Hickman Property Expansion
14.14 miles T5: ATL IV
US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia.
14.17 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
14.27 miles Hyperscale Data Center Request Dataset
14.36 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
14.64 miles Hyperscale Data Center Request Dataset
Microsoft is advancing a major infrastructure presence in Northeast Pennsylvania, centered on a two-building data center campus in Newton Township.
15.09 miles Lumen Atlanta 6
15.11 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
15.67 miles Strategic Real: Palmetto
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
15.70 miles Strategic Real: Palmetto Expansion
15.94 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
17.41 miles Carrier-Neutral Data Center Request Dataset
18.21 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
18.65 miles Project Avemore
Atlas Development will construct a new data center on 428 acres near Atlanta, Georgia, in Villa Rica’s Carroll County along Hwy 61.
18.79 miles QTS: Fayetteville DC14
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
18.82 miles QTS: Fayetteville DC2
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
18.90 miles QTS: Fayetteville DC8
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
18.97 miles Grindcap: Marietta Campus
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation
18.99 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
18.99 miles QTS: Fayetteville DC9
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.02 miles Hyperscale Data Center Request Dataset
19.03 miles QTS: Fayetteville DC13
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.05 miles QTS: Fayetteville DC11
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.07 miles QTS: Fayetteville DC10
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.07 miles QTS: Fayetteville DC12
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.10 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
19.22 miles QTS: Fayetteville DC15
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.36 miles QTS: Fayetteville DC16
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.38 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
19.65 miles Crow Holdings: Fayetteville, GA
Crow Holdings Development has officially withdrawn its application to construct a single, two-story data center and dedicated substation on a 37.4-acre parcel of land in Fayetteville, Georgia.
19.67 miles QTS: ATL2 East Campus
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
19.68 miles QTS: Fayetteville DC5
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.75 miles QTS: Fayetteville DC7
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.75 miles QTS: Fayetteville DC4
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.78 miles Hyperscale Data Center Request Dataset
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
19.82 miles QTS: Fayetteville DC3
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
19.96 miles QTS Fayetteville
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.

Aligned: ATL-01 Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

45
Facilities
14
Markets

News See all

Read Aligned Data Centers Sold in $40bn Deal
Aligned Data Centers Sold in $40bn Deal

Aligned Data Centers Sold in $40bn Deal

October 11, 2025 Aligned

Aligned Data Centers is being sold to BlackRock and MGX in a deal worth $40 billion, the biggest ever acquisition in the digital infrastructure space. Macquarie Asset Management selling it to a group comprising the AI Infrastructure Partnership (AIP), MGX, and BlackRock-owned Global...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Aligned to Develop 200-Acre Data Center Campus
 Aligned to Develop 200-Acre Data Center Campus

Aligned to Develop 200-Acre Data Center Campus

July 25, 2025 Aligned

Aligned Data Centers this week announced plans to expand in Central Ohio with the development of a data center campus inside the Conesville Industrial Park in Coshocton. Coshocton is located approximately 63 miles (101 km) northeast of Columbus.Aligned will develop a 197-acre parcel adjacent to...

Read more
Read Aligned to proceed with stalled data center camps at Maryland
Aligned to proceed with stalled data center camps at Maryland

Aligned to proceed with stalled data center camps at Maryland

May 24, 2024 Aligned

Aligned Data Centers has revealed its plans to proceed with its previously halted data center campus in Maryland after recent regulatory changes. around backup generators, easing restrictions for data center firms. With this move, Aligned will now be moving ahead with its plans for a campus in...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?