T5: ATL IV

Latest Podcast
Gullatt Road
Planned
Future facility in planning stage
Operated by:

T5: ATL IV

US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia. Located in Fairburn, Fulton County, the campus will feature three data center buildings along Gullatt Road. Construction on the first phase is slated to begin in Q2 2027.

Map and Nearby Locations:

Gullatt Road
T5 Data Centers Sites
Nearby Facilities

Sites within 15 miles of T5: ATL IV

Distance Site About
0.91 miles Hyperscale Data Center Request Dataset
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
1.55 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
2.04 miles Project Rita: Tyrone, GA (Proposed)
A new data center campus is being planned in Fayette County, Georgia. The site would be home to ‘Project Rita’, a proposed development of two one-story data center buildings totaling 490,000 square feet (45,520 sqm), and an on-site substation. The campus would total 96MW.
3.51 miles Strategic Real: Palmetto Expansion
3.51 miles Strategic Real: Palmetto
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
6.19 miles QTS: Fayetteville DC14
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.21 miles QTS: Fayetteville DC2
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.34 miles QTS: Fayetteville DC13
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.37 miles QTS: Fayetteville DC15
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.41 miles QTS: Fayetteville DC12
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.42 miles QTS: Fayetteville DC8
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.42 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
6.51 miles QTS: Fayetteville DC11
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.53 miles Hyperscale Data Center Request Dataset
6.54 miles QTS: Fayetteville DC9
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.56 miles QTS: Fayetteville DC16
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.63 miles QTS: Fayetteville DC10
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.85 miles QTS: Fayetteville DC7
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
6.98 miles QTS: Fayetteville DC5
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.04 miles QTS: Fayetteville DC4
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.05 miles Hyperscale Data Center Request Dataset
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
7.09 miles QTS: Fayetteville DC3
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.22 miles QTS Fayetteville
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.23 miles QTS: ATL2 East Campus
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
7.28 miles Carrier-Neutral Data Center Request Dataset
7.46 miles Vantage: Georgia GA1
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
7.74 miles EdgeConneX: Atlanta ATL11-13
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
7.79 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
7.85 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
7.96 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
9.50 miles Carrier-Neutral Data Center Request Dataset
10.08 miles Hyperscale Data Center Request Dataset
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
10.56 miles Crypto Mining Data Center Request Dataset
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
11.96 miles Lumen College Park 1
13.02 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.04 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.04 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
13.13 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.18 miles Vantage: Georgia GA2
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
14.44 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.48 miles Flexential: Douglasville 2
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
14.50 miles Hyperscale Data Center Request Dataset
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
14.50 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.56 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
14.59 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.65 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.68 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
14.73 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
14.74 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
14.76 miles DC BLOX: Atlanta West (ATL1)
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
15.22 miles Hyperscale Data Center Request Dataset
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
15.30 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
15.30 miles DataCanopy: Lithia Springs (Atlanta)
15.52 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
15.52 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
15.68 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
15.74 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
15.80 miles Hyperscale Data Center Request Dataset
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
15.93 miles DataBank: Lithia Springs ATL5
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
15.94 miles DataBank: Lithia Springs ATL6
This facility will be the second data center building at DataBank's Lithia Springs Campus.
16.03 miles Hyperscale Data Center Request Dataset
Google completed the expansion of its Douglas County data center in 2016.
16.21 miles Switch Atlanta: The KEEP
16.27 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
16.39 miles Project Sail
Project Sail would comprise 13 data halls, each 378,000 sq ft, totaling 4.9 million sq ft. Projected to be completed by 2036, the development is expected to generate $1.6 billion in annual tax revenue.
16.46 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.47 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.48 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.57 miles Switch: Atlanta 3
16.62 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.71 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
16.74 miles T5@Atlanta III Campus
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.75 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
17.38 miles Project Sail Expansion
17.69 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
18.04 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
18.14 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
18.14 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
18.15 miles Lumen Atlanta 5
18.16 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
18.20 miles DataBank Atlanta ATL2
18.21 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
18.51 miles Project Douglas Waldrop
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
18.65 miles Douglas Waldrop Bldg-2
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
18.75 miles Stream: Atlanta West
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
19.36 miles Hickman Property Expansion
19.36 miles Hickman Property Project
The development is planned for a 700-acre site in Douglas County, with approximately 35 acres situated within the city limits of Villa Rica, which lies about 30 miles west of Atlanta.
19.46 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.

T5: ATL IV Data Center Photos (See all)

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

T5 Data Centers, an Atlanta-based data center provider that specializes in offering wholesale data center space. T5 has data centers in Atlanta, Charlotte, Colorado, Dallas, Los Angeles, and New York markets

17
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?