Equifax to Decommission Data Center outside Atlanta
September 12, 2025
Atlanta
US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia. Located in Fairburn, Fulton County, the campus will feature three data center buildings along Gullatt Road. Construction on the first phase is slated to begin in Q2 2027.
| Distance | Site | About |
|---|---|---|
| 0.91 miles | Hyperscale Data Center Request Dataset |
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
|
| 1.55 miles | Fairburn Technology Center |
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
|
| 2.04 miles | Project Rita: Tyrone, GA (Proposed) |
A new data center campus is being planned in Fayette County, Georgia. The site would be home to ‘Project Rita’, a proposed development of two one-story data center buildings totaling 490,000 square feet (45,520 sqm), and an on-site substation. The campus would total 96MW.
|
| 3.51 miles | Strategic Real: Palmetto Expansion | |
| 3.51 miles | Strategic Real: Palmetto |
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
|
| 6.19 miles | QTS: Fayetteville DC14 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.21 miles | QTS: Fayetteville DC2 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.34 miles | QTS: Fayetteville DC13 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.37 miles | QTS: Fayetteville DC15 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.41 miles | QTS: Fayetteville DC12 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.42 miles | QTS: Fayetteville DC8 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.42 miles | TA Realty: Red Oak ATL03 |
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
|
| 6.51 miles | QTS: Fayetteville DC11 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.53 miles | Hyperscale Data Center Request Dataset | |
| 6.54 miles | QTS: Fayetteville DC9 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.56 miles | QTS: Fayetteville DC16 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.63 miles | QTS: Fayetteville DC10 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.85 miles | QTS: Fayetteville DC7 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 6.98 miles | QTS: Fayetteville DC5 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 7.04 miles | QTS: Fayetteville DC4 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 7.05 miles | Hyperscale Data Center Request Dataset |
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
|
| 7.09 miles | QTS: Fayetteville DC3 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 7.22 miles | QTS Fayetteville |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 7.23 miles | QTS: ATL2 East Campus |
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
|
| 7.28 miles | Carrier-Neutral Data Center Request Dataset | |
| 7.46 miles | Vantage: Georgia GA1 |
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
|
| 7.74 miles | EdgeConneX: Atlanta ATL11-13 |
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
|
| 7.79 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 7.85 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 7.96 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 9.50 miles | Carrier-Neutral Data Center Request Dataset | |
| 10.08 miles | Hyperscale Data Center Request Dataset |
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
|
| 10.56 miles | Crypto Mining Data Center Request Dataset |
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
|
| 11.96 miles | Lumen College Park 1 | |
| 13.02 miles | Vantage: Douglasville 3 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 13.04 miles | Vantage: Douglasville 2 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 13.04 miles | American Tower: SW Atlanta |
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
|
| 13.13 miles | Vantage: Douglasville |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 13.18 miles | Vantage: Georgia GA2 |
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
|
| 14.44 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 14.48 miles | Flexential: Douglasville 2 |
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
|
| 14.50 miles | Hyperscale Data Center Request Dataset |
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
|
| 14.50 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 14.56 miles | Flexential Douglasville |
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
|
| 14.59 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 14.65 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 14.68 miles | DC BLOX: ATL1-B |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
|
| 14.73 miles | Menlo Digital: Atlanta, GA |
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
|
| 14.74 miles | DC BLOX: ATL1-C |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
|
| 14.76 miles | DC BLOX: Atlanta West (ATL1) |
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
|
| 15.22 miles | Hyperscale Data Center Request Dataset |
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
|
| 15.30 miles | PwC Lithia Springs |
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
|
| 15.30 miles | DataCanopy: Lithia Springs (Atlanta) | |
| 15.52 miles | Centersquare: ATL1 |
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
|
| 15.52 miles | 375 Riverside - Digital Realty |
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
|
| 15.68 miles | Digital Realty: ATL11 |
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
|
| 15.74 miles | Rock House Road data center, Atlanta |
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
|
| 15.80 miles | Hyperscale Data Center Request Dataset |
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
|
| 15.93 miles | DataBank: Lithia Springs ATL5 |
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
|
| 15.94 miles | DataBank: Lithia Springs ATL6 |
This facility will be the second data center building at DataBank's Lithia Springs Campus.
|
| 16.03 miles | Hyperscale Data Center Request Dataset |
Google completed the expansion of its Douglas County data center in 2016.
|
| 16.21 miles | Switch Atlanta: The KEEP |
|
| 16.27 miles | DataBank: Atlanta ATL4 |
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
|
| 16.39 miles | Project Sail |
Project Sail would comprise 13 data halls, each 378,000 sq ft, totaling 4.9 million sq ft. Projected to be completed by 2036, the development is expected to generate $1.6 billion in annual tax revenue.
|
| 16.46 miles | T5@Atlanta III Bldg 5 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 16.47 miles | T5@Atlanta III Bldg 3 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 16.48 miles | T5@Atlanta III Bldg 4 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 16.57 miles | Switch: Atlanta 3 | |
| 16.62 miles | T5@Atlanta III Bldg 2 |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 16.71 miles | STACK: ATL02B |
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
|
| 16.74 miles | T5@Atlanta III Campus |
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
|
| 16.75 miles | STACK Atlanta ATL02 |
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
|
| 17.38 miles | Project Sail Expansion | |
| 17.69 miles | Digital Realty: ATL 15 |
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
|
| 18.04 miles | Cogent: Atlanta 2 |
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
|
| 18.14 miles | EdgeConneX ATL01 |
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
|
| 18.14 miles | EdgeConneX Atlanta Campus |
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
|
| 18.15 miles | Lumen Atlanta 5 | |
| 18.16 miles | EdgeConneX ATL02 |
In 2018, EdgeConneX launched its second data center in Atlanta.
|
| 18.20 miles | DataBank Atlanta ATL2 |
|
| 18.21 miles | DataBank Atlanta ATL3 |
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
|
| 18.51 miles | Project Douglas Waldrop |
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
|
| 18.65 miles | Douglas Waldrop Bldg-2 |
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
|
| 18.75 miles | Stream: Atlanta West |
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
|
| 19.36 miles | Hickman Property Expansion | |
| 19.36 miles | Hickman Property Project |
The development is planned for a 700-acre site in Douglas County, with approximately 35 acres situated within the city limits of Villa Rica, which lies about 30 miles west of Atlanta.
|
| 19.46 miles | TA Realty: Ellenwood, ATL |
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
|
September 12, 2025
Atlanta
August 06, 2025
T5 Data Centers
August 31, 2024
T5 Data Centers
May 10, 2024
Atlanta
May 04, 2024
T5 Data Centers
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas