0.08 miles
|
Digital Realty: MAD4
|
|
|
0.29 miles
|
Hispaweb Miguel Yuste
|
|
|
0.37 miles
|
Nabiax: Julián Camarillo Campus
|
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
|
|
0.40 miles
|
Grupo Aire OASIX: Madrid
|
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
|
|
0.48 miles
|
Digital Realty: MAD1
|
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
|
|
0.49 miles
|
Digital Realty: MAD3
|
|
|
0.50 miles
|
Digital Realty: MAD2
|
|
|
0.91 miles
|
NxN: Madrid
|
NxN Data Centers is developing its first Madrid data center at Calle de las Abelias, 1 in Hortaleza, Madrid, through the conversion of the former Banco Popular headquarters building.
|
|
0.99 miles
|
AtlasEdge: Calle de Telemaco
|
Former Colt facility that was acquired by AtlasEdge in 2021
|
|
2.50 miles
|
Espanix Datacenter
|
|
|
2.50 miles
|
Produban Mesena 80
|
|
|
2.99 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Carrier-Neutral Operator has begun construction of a second data center building beside its existing Madrid facility.
|
|
2.99 miles
|
Global Switch: Madrid 1
|
|
|
3.21 miles
|
IPCore Madrid
|
|
|
3.49 miles
|
Edgnex: Madrid
|
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
|
|
3.71 miles
|
AtlasEdge: Madrid MAD001
|
|
|
3.92 miles
|
Echelon Iberdrola: Madrid South
|
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
|
|
4.46 miles
|
Goodman: Madrid 01
|
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
|
|
4.57 miles
|
inAsset NixMad
|
|
|
4.76 miles
|
nLighten Madrid-Lezama
|
|
|
5.46 miles
|
Kyndryl: Madrid
|
|
|
5.61 miles
|
Ibercom Madrid
|
|
|
6.60 miles
|
DATA4: MAD01 DC1
|
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
|
|
6.63 miles
|
Data4: MAD01 DC2
|
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
|
|
6.65 miles
|
Data4: MAD01 DC3
|
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
|
|
6.67 miles
|
Prime: Madrid
|
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
|
|
6.70 miles
|
Equinix MD4x
|
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
|
|
6.72 miles
|
Equinix MD3x
|
|
|
6.74 miles
|
Equinix MD5
|
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
|
|
6.80 miles
|
Ferrovial: Alcobendas MAD01
|
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
|
|
6.80 miles
|
Equinix Madrid MD2
|
|
|
6.80 miles
|
Equinix Madrid MD1
|
|
|
6.82 miles
|
CyrusOne Madrid I
|
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
|
|
6.84 miles
|
Equinix MD6
|
|
|
7.05 miles
|
Iron Mountain MAD-1
|
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
|
|
7.63 miles
|
HubInterested in this information?Contact us
|
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
|
|
7.64 miles
|
hscale: Madrid MAD1
|
hscale plans to build its MAD1 data center campus in Madrid.
|
|
8.27 miles
|
Cogent Madrid
|
|
|
9.47 miles
|
Edged Energy: Madrid-Getafe
|
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
|
|
9.47 miles
|
CampusInterested in this information?Contact us
|
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
|
|
9.48 miles
|
Merlin: Madrid-Getafe
|
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
|
|
11.45 miles
|
Ridge GammaInterested in this information?Contact us
|
|
|
12.17 miles
|
Vaultica: MAD01
|
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
|
|
12.49 miles
|
BBVA CPD Tres Cantos
|
|
|
12.58 miles
|
Metro PointInterested in this information?Contact us
|
The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.
|
|
12.85 miles
|
Quetta: Tres Cantos
|
|
|
12.90 miles
|
Avaio: Madrid Scorpio
|
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
|
|
12.92 miles
|
Templus: Alcala, Madrid
|
|
|
13.73 miles
|
Form8tion: Madrid One
|
|
|
13.78 miles
|
Apto: Madrid
|
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
|
|
14.29 miles
|
NTT Madrid 1
|
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
|
|
16.00 miles
|
Data4: MAD02 DC01
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
16.01 miles
|
Data4: MAD02 DC02
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
16.06 miles
|
Data4: MAD02 DC03
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
16.07 miles
|
Data4: MAD02 DC04
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
16.17 miles
|
Nabiax: ADC 2
|
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
|
|
16.18 miles
|
Nabiax: ADC 1
|
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
|
|
16.19 miles
|
Nabiax: ADC 3
|
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
|
|
16.20 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.20 miles
|
Adam MAD Alcala
|
|
|
17.04 miles
|
Iridium: Carretera Nacional
|
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
|
|
17.84 miles
|
West TowerInterested in this information?Contact us
|
|
|
17.86 miles
|
Pure DC: Madrid
|
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.
|