Nebius: Madrid-Getafe

Latest Podcast Calle Fundidores 40
Operational
Fully operational facility
Operated by:

Nebius: Madrid-Getafe

Year Built: 2026
Ownership: Nebius does not own the building.
This site is leased from Merlin Properties in the Merlin: Madrid-Getafe building
░░░░ Request Dataset MW
Operational Power

Nebius leases space in the MAD01 data center that Merlin Properties owns on Calle Fundidores in Getafe. The lease was signed in February 2026, and the capacity went live when the building's expanded power connection was completed in October 2026.

Site History

  • Oct 2026: The expanded power connection at MAD01 was completed.
  • Jul 2026: Nebius was reported as the tenant.
  • Feb 2026: Merlin signed the MAD01 lease.

Map and Nearby Locations

Calle Fundidores 40
Nebius Sites
Nearby Facilities

Nebius: Madrid-Getafe Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Nebius: Madrid-Getafe

Distance Site About
0.01 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
0.01 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
0.03 miles Valley GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.62 miles Merlin: Madrid-Getafe 2
Merlin Properties' second data center in Getafe, south of Madrid, planned on the site of a former factory on Calle Fundidores.
5.11 miles inAsset NixMad
5.53 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
6.54 miles Form8tion: Madrid One
6.55 miles Apto: Madrid
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
7.63 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
8.57 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
9.10 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
9.25 miles Digital Realty: MAD3
9.36 miles Digital Realty: MAD5
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
9.41 miles Digital Realty: MAD4
9.57 miles Templus: Madrid MAD03
Templus MAD03 on Calle de Albasanz in Madrid's Julián Camarillo data centre cluster, formerly Grupo Aire's Oasix Madrid. Templus bought it in January 2026.
9.62 miles Hispaweb Miguel Yuste
9.65 miles Digital Realty: MAD1
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
9.67 miles Digital Realty: MAD2
10.37 miles NxN: Madrid
NxN NX02, a data centre in the former Banco Popular headquarters in Hortaleza, Madrid, commissioned in 2026 after a €20 million conversion.
10.82 miles Espanix Datacenter
10.85 miles Santander: Boadilla del Monte
Banco Santander's original group data center, on the Ciudad Grupo Santander headquarters campus in Boadilla del Monte, west of Madrid.
11.30 miles Global Switch: Madrid 2
Global Switch has begun construction of a second data center building beside its existing Madrid facility.
11.34 miles Global Switch: Madrid 1
11.36 miles IPCore Madrid
12.01 miles Goodman: Madrid 01
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
12.23 miles Templus: Madrid MAD02
Templus MAD02, the former Colt and AtlasEdge Madrid data centre in the Manoteras business park, Hortaleza. Templus bought it from AtlasEdge in 2026.
12.40 miles nLighten Madrid-Lezama
13.19 miles BBVA: Ciudad BBVA
BBVA's backup data center sits inside the Ciudad BBVA headquarters campus in Madrid's Las Tablas district and pairs with the bank's main data center in Tres Cantos.
13.96 miles Kyndryl: Madrid
14.03 miles Equinix Madrid MD1
Equinix's original Madrid data centre in Las Tablas, opened in 2000 as Carrierhouse Madrid-1 and acquired with Itconic in 2017.
14.04 miles Orange: Madrid Las Tablas
A MasOrange internet data centre on the fourth floor of the Edificio Auge I office building in Las Tablas, Madrid, built by Ibercom.
14.42 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
15.31 miles Adam Madrid
Former Adam data centre on the A-5 motorway at Navalcarnero, west of Madrid, built from DataBOX container modules. It closed after 2019, and Adam's Madrid data centre has been in Alcalá de Henares since 2021.
15.44 miles Prime: Madrid
Prime Data Centers plans a hyperscale data centre in Alcobendas, north of Madrid, on land it secured in 2024.
15.51 miles Equinix MD5
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
15.52 miles Equinix MD3x
Equinix's first xScale hyperscale data centre in Spain, on its Alcobendas campus north of Madrid.
15.52 miles Equinix MD4x
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
15.52 miles Equinix MD6
A retail Equinix data hall inside the MD3x xScale building on the Alcobendas campus north of Madrid.
15.58 miles DATA4: MAD01 DC1
DATA4's first Spanish data centre, opened in 2020 in Alcobendas. It is the largest of three buildings on the MAD01 campus, which connects to the ESpanix exchange.
15.59 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
15.61 miles Ferrovial: Alcobendas MAD01
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
15.62 miles Data4: MAD01 DC3
Third building of DATA4's MAD01 campus in Alcobendas, built from 2023. The three-floor, 15,000 m² building holds six data halls.
15.63 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
15.78 miles Equinix Madrid MD2
Equinix's Madrid peering hub in Alcobendas, a node of the ESpanix and DE-CIX Madrid exchanges, opened in 2001 as Carrierhouse Madrid 2.
16.66 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
16.97 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.49 miles Cogent Madrid
19.31 miles Edge PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.62 miles Vaultica: MAD01
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.

Nebius: Madrid-Getafe Data Center Photos See all

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

The Nebius AI Cloud brings powerful full-stack infrastructure for AI developers and practitioners across startups, enterprises and science institutes to build and deploy generative AI applications and rapidly deliver scientific breakthroughs by training and running ML models within a secure, high-performance, and cost-optimized cloud environment.

0
Facilities
0
Markets

News See all

Read Nebius Secures $3.5B Senior Secured Facility From Citi
Nebius Group has borrowed $3.5 billion from Citi under a senior secured facility that matures in 364 days. The Amsterdam-based AI cloud company [anno](https://nebius.com/newsroom/nebius-secures-3-5...

Nebius Secures $3.5B Senior Secured Facility From Citi

October 23, 2026 Nebius

Nebius Group has borrowed $3.5 billion from Citi under a senior secured facility that matures in 364 days. The Amsterdam-based AI cloud company annoimg.jpg#bx-caption=Featured%3A%20Wide%20shot%20of%20Nebius%20AI%20infrastructure%20server%20rows%20and%20network%20cabling.#bx-layout=right-50)unced...

Read more
Read Nebius Signs Preliminary Framework for 50MW at NEOM's Oxagon Campus
[HUMAIN](https://baxtel.com/data-centers/humain) and [DataVolt](https://baxtel.com/data-centers/datavolt) signed a preliminary framework agreement with [Nebius](https://baxtel.com/data-centers/nebi...

Nebius Signs Preliminary Framework for 50MW at NEOM's Oxagon Campus

October 22, 2026 Nebius

HUMAIN and DataVolt signed a preliminary framework agreement with Nebius for up to 50MW at Oxagon, the industrial city in Saudi Arabia's NEOM development. NEOM announced the framework on October 21, naming the AI cloud company an anchor customer at a giga campus already under construction....

Read more
Read Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory
[VOLT](https://baxtel.com/data-centers/volt-data-centers) has lined up [Nebius](https://baxtel.com/data-centers/nebius) as the first off-taker at its [Rotterdam AI Gigafactory](https://fromvolt.com...

Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory

October 13, 2026 Nebius

VOLT has lined up Nebius as the first off-taker at its Rotterdam AI Gigafactory, the anchor customer the Dutch developer needs before it can take a 600 MW campus at the Port of Rotterdam to lenders. The letter of intent, announced Monday, covers a long-term lease, with a first phase of two...

Read more
Read Nebius Signs LOI With Volt for Rotterdam Data Center Capacity
AI cloud provider Nebius has signed an LOI with Volt to become the first offtaker at its planned AI Gigafactory in Rotterdam, the Netherlands. The campus is planned to deliver 600MW across six buil...

Nebius Signs LOI With Volt for Rotterdam Data Center Capacity

October 13, 2026 Nebius

AI cloud provider Nebius has signed an LOI with Volt to become the first offtaker at its planned AI Gigafactory in Rotterdam, the Netherlands. The campus is planned to deliver 600MW across six buildings, with the first phase comprising two 100MW data centers. The initial phase is expected to cost...

Read more
Read Nebius Signs 50MW Data Center Lease With AIB Data Centers
Neocloud provider Nebius has signed a 12-year capacity agreement with AIB Data Centers to lease 50MW at a data center in the southeastern US. The deal includes two five-year renewal options. Nebius...

Nebius Signs 50MW Data Center Lease With AIB Data Centers

October 02, 2026 Nebius

Neocloud provider Nebius has signed a 12-year capacity agreement with AIB Data Centers to lease 50MW at a data center in the southeastern US. The deal includes two five-year renewal options. Nebius will make prepayments to AIB, alongside project-level debt and equity, to help fund the data...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.