Orange: Madrid Las Tablas

Latest Podcast Calle de María Tubau
Operational
Fully operational facility
Operated by:

Orange: Madrid Las Tablas

Year Built: 2014
░░░ Request Dataset MW
Operational Power

Ibercom opened this internet data centre on the fourth floor of the Edificio Auge I office building in the Las Tablas business district of Madrid. Ibercom merged into MásMóvil in 2014, and MásMóvil merged with Orange Spain into MasOrange in 2024. MasOrange is selling a portfolio of about twelve Spanish data centres.

Site History

  • 2024: MásMóvil and Orange Spain merged into MasOrange.
  • 2014: Ibercom merged into MásMóvil.
  • 2014: The data centre was in service.

Map and Nearby Locations

Calle de María Tubau ( 8 )
Orange Sites
Nearby Facilities

Orange: Madrid Las Tablas Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Orange: Madrid Las Tablas

Distance Site About
0.08 miles Equinix Madrid MD1
Equinix's original Madrid data centre in Las Tablas, opened in 2000 as Carrierhouse Madrid-1 and acquired with Itconic in 2017.
1.03 miles BBVA: Ciudad BBVA
BBVA's backup data center sits inside the Ciudad BBVA headquarters campus in Madrid's Las Tablas district and pairs with the bank's main data center in Tres Cantos.
1.49 miles Prime: Madrid
Prime Data Centers plans a hyperscale data centre in Alcobendas, north of Madrid, on land it secured in 2024.
1.54 miles Equinix MD4x
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
1.56 miles Equinix MD3x
Equinix's first xScale hyperscale data centre in Spain, on its Alcobendas campus north of Madrid.
1.56 miles Equinix MD6
A retail Equinix data hall inside the MD3x xScale building on the Alcobendas campus north of Madrid.
1.57 miles Equinix MD5
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
1.63 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
1.69 miles Ferrovial: Alcobendas MAD01
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
1.85 miles nLighten Madrid-Lezama
1.91 miles Templus: Madrid MAD02
Templus MAD02, the former Colt and AtlasEdge Madrid data centre in the Manoteras business park, Hortaleza. Templus bought it from AtlasEdge in 2026.
1.91 miles DATA4: MAD01 DC1
DATA4's first Spanish data centre, opened in 2020 in Alcobendas. It is the largest of three buildings on the MAD01 campus, which connects to the ESpanix exchange.
1.94 miles Data4: MAD01 DC3
Third building of DATA4's MAD01 campus in Alcobendas, built from 2023. The three-floor, 15,000 m² building holds six data halls.
2.00 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
2.06 miles Equinix Madrid MD2
Equinix's Madrid peering hub in Alcobendas, a node of the ESpanix and DE-CIX Madrid exchanges, opened in 2001 as Carrierhouse Madrid 2.
3.35 miles Espanix Datacenter
3.98 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.99 miles Cogent Madrid
4.99 miles NxN: Madrid
NxN NX02, a data centre in the former Banco Popular headquarters in Hortaleza, Madrid, commissioned in 2026 after a €20 million conversion.
5.67 miles Hispaweb Miguel Yuste
5.68 miles Digital Realty: MAD4
5.69 miles Digital Realty: MAD5
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
5.80 miles Templus: Madrid MAD03
Templus MAD03 on Calle de Albasanz in Madrid's Julián Camarillo data centre cluster, formerly Grupo Aire's Oasix Madrid. Templus bought it in January 2026.
5.81 miles Digital Realty: MAD1
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
5.81 miles Digital Realty: MAD2
6.00 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
6.07 miles Digital Realty: MAD3
6.54 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
6.89 miles Global Switch: Madrid 1
6.92 miles Global Switch: Madrid 2
Global Switch has begun construction of a second data center building beside its existing Madrid facility.
6.98 miles BBVA CPD Tres Cantos
7.16 miles Merlin: Madrid-Tres Cantos
Merlin Properties plans a data center in Tres Cantos, north of Madrid, on land being urbanised beside the M-607.
7.17 miles IPCore Madrid
7.31 miles Quetta: Tres Cantos
8.26 miles Goodman: Madrid 01
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
8.51 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.96 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
9.73 miles Kyndryl: Madrid
9.80 miles inAsset NixMad
9.95 miles Avaio: Madrid Scorpio
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
9.95 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
10.24 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
11.36 miles Data4: MAD02 DC01
First of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid beside the A-1. It entered service in March 2026.
11.37 miles Data4: MAD02 DC02
Second of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid, due in early 2027.
11.41 miles Data4: MAD02 DC04
Fourth and last planned building on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
11.42 miles Data4: MAD02 DC03
Third of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
11.44 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
13.24 miles Santander: Boadilla del Monte
Banco Santander's original group data center, on the Ciudad Grupo Santander headquarters campus in Boadilla del Monte, west of Madrid.
13.77 miles Vaultica: MAD01
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
14.03 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
14.04 miles Nebius: Madrid-Getafe
Nebius runs AI cloud capacity in Merlin Properties' MAD01 data center in Getafe, south of Madrid.
14.05 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
14.07 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.13 miles Merlin: Madrid-Getafe 2
Merlin Properties' second data center in Getafe, south of Madrid, planned on the site of a former factory on Calle Fundidores.
14.73 miles Templus: Alcala, Madrid
Templus MAD01, the former Mapfre data centre in Alcalá de Henares, east of Madrid. Templus bought it in a 2024 sale-leaseback and is doubling its power with a third IT room.
14.84 miles Station PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.57 miles Form8tion: Madrid One
16.62 miles Apto: Madrid
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
17.42 miles Nabiax: ADC 1
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
17.47 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
17.47 miles Hyperscale Data CenterInterested in this information?Contact us
17.52 miles Nabiax: ADC 3
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
17.58 miles Adam MAD Alcala
18.58 miles Iridium: Carretera Nacional
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
18.88 miles Ridge ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.95 miles Pure DC: Madrid
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.

Orange: Madrid Las Tablas Data Center Photos See all

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

Orange is one of the world’s leading telecommunications operators with sales of 41 billion euros in 2018 and 148,000 employees worldwide at 30 June 2019, including 89,000 employees in France. The Group has a total customer base of 266 million customers worldwide at 30 June 2018, including 207 million mobile customers and 20 million fixed broadband customers.

The Group is present in 27 countries. Orange is also a leading provider of global IT and telecommunication services to multinational companies, under the brand Orange Business Services. In March 2015, the Group presented its new strategic plan “Essentials2020” which places customer experience at the heart of its strategy with the aim of allowing them to benefit fully from the digital universe and the power of its new generation networks.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Telenor JV Skygard Acquires Two Data Centers from Orange in Oslo, Norway
Telenor JV Skygard Acquires Two Data Centers from Orange in Oslo, Norway

Telenor JV Skygard Acquires Two Data Centers from Orange in Oslo, Norway

January 12, 2026 Orange

Norwegian data center firm Skygard, which is owned by Norwegian telco Telenor, energy company Hafslund, and investment fund HitecVision, has acquired two facilities from Orange Business Services Norway."The acquisition marks an important milestone for Skygard. With this, we are significantly...

Read more
Read Edisun to supply AI-driven data centers with power from Madrid solar plant
Edisun to supply AI-driven data centers with power from Madrid solar plant

Edisun to supply AI-driven data centers with power from Madrid solar plant

December 23, 2024 Madrid

European solar power producer Edisun Power plans to direct power from its 941MW Fuencarral solar power plant in Madrid to data centers in the region.The company noted that the additional electricity demand from artificial intelligence and the increasingly stringent European regulations for the...

Read more
Read Orange signs new 15-year PPA in France
Orange signs new 15-year PPA in France

Orange signs new 15-year PPA in France

May 15, 2024 Orange

Orange has signed a 15-year Power Purchase Agreement with French solar & storage developer ZE Energy this week to procure solar power in France.The agreement is to offtake 90GWh annually produced by a new hybrid solar power plant being built in Landes. “Orange France is continuing its...

Read more
Read Orange and Huawei partner to unveil Cloud services in Egypt
Orange and Huawei partner to unveil Cloud services in Egypt

Orange and Huawei partner to unveil Cloud services in Egypt

April 30, 2024 Orange

Orange and Huawei have teamed up to launch Huawei Cloud services in Egypt. Both companies have previously teamed up to launch the Orange Business Cloud for business in Egypt. Following the latest agreement which is an extension of that launch, Huawei Cloud will roll out an array of its cloud...

Read more
Read Mapfre sells 10MW facility in Madrid
Mapfre sells 10MW facility in Madrid

Mapfre sells 10MW facility in Madrid

February 23, 2024 Madrid

Spanish insurance firm Mapfre has sold its data center in Madrid. The company received advise on the sale-leaseback deal of its 10MW facility in Alcalá de Henares from CBRE’s Spanish unit. Paul Mortlock, senior director and head of European data center capital markets at CBRE, said,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.