|
0.08 miles
|
Equinix Madrid MD1
|
Equinix's original Madrid data centre in Las Tablas, opened in 2000 as Carrierhouse Madrid-1 and acquired with Itconic in 2017.
|
|
1.03 miles
|
BBVA: Ciudad BBVA
|
BBVA's backup data center sits inside the Ciudad BBVA headquarters campus in Madrid's Las Tablas district and pairs with the bank's main data center in Tres Cantos.
|
|
1.49 miles
|
Prime: Madrid
|
Prime Data Centers plans a hyperscale data centre in Alcobendas, north of Madrid, on land it secured in 2024.
|
|
1.54 miles
|
Equinix MD4x
|
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
|
|
1.56 miles
|
Equinix MD3x
|
Equinix's first xScale hyperscale data centre in Spain, on its Alcobendas campus north of Madrid.
|
|
1.56 miles
|
Equinix MD6
|
A retail Equinix data hall inside the MD3x xScale building on the Alcobendas campus north of Madrid.
|
|
1.57 miles
|
Equinix MD5
|
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
|
|
1.63 miles
|
CyrusOne Madrid I
|
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
|
|
1.69 miles
|
Ferrovial: Alcobendas MAD01
|
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
|
|
1.85 miles
|
nLighten Madrid-Lezama
|
|
|
1.91 miles
|
Templus: Madrid MAD02
|
Templus MAD02, the former Colt and AtlasEdge Madrid data centre in the Manoteras business park, Hortaleza. Templus bought it from AtlasEdge in 2026.
|
|
1.91 miles
|
DATA4: MAD01 DC1
|
DATA4's first Spanish data centre, opened in 2020 in Alcobendas. It is the largest of three buildings on the MAD01 campus, which connects to the ESpanix exchange.
|
|
1.94 miles
|
Data4: MAD01 DC3
|
Third building of DATA4's MAD01 campus in Alcobendas, built from 2023. The three-floor, 15,000 m² building holds six data halls.
|
|
2.00 miles
|
Data4: MAD01 DC2
|
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
|
|
2.06 miles
|
Equinix Madrid MD2
|
Equinix's Madrid peering hub in Alcobendas, a node of the ESpanix and DE-CIX Madrid exchanges, opened in 2001 as Carrierhouse Madrid 2.
|
|
3.35 miles
|
Espanix Datacenter
|
|
|
3.98 miles
|
NorthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.99 miles
|
Cogent Madrid
|
|
|
4.99 miles
|
NxN: Madrid
|
NxN NX02, a data centre in the former Banco Popular headquarters in Hortaleza, Madrid, commissioned in 2026 after a €20 million conversion.
|
|
5.67 miles
|
Hispaweb Miguel Yuste
|
|
|
5.68 miles
|
Digital Realty: MAD4
|
|
|
5.69 miles
|
Digital Realty: MAD5
|
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
|
|
5.80 miles
|
Templus: Madrid MAD03
|
Templus MAD03 on Calle de Albasanz in Madrid's Julián Camarillo data centre cluster, formerly Grupo Aire's Oasix Madrid. Templus bought it in January 2026.
|
|
5.81 miles
|
Digital Realty: MAD1
|
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
|
|
5.81 miles
|
Digital Realty: MAD2
|
|
|
6.00 miles
|
Nabiax: Julián Camarillo Campus
|
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
|
|
6.07 miles
|
Digital Realty: MAD3
|
|
|
6.54 miles
|
Echelon Iberdrola: Madrid South
|
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
|
|
6.89 miles
|
Global Switch: Madrid 1
|
|
|
6.92 miles
|
Global Switch: Madrid 2
|
Global Switch has begun construction of a second data center building beside its existing Madrid facility.
|
|
6.98 miles
|
BBVA CPD Tres Cantos
|
|
|
7.16 miles
|
Merlin: Madrid-Tres Cantos
|
Merlin Properties plans a data center in Tres Cantos, north of Madrid, on land being urbanised beside the M-607.
|
|
7.17 miles
|
IPCore Madrid
|
|
|
7.31 miles
|
Quetta: Tres Cantos
|
|
|
8.26 miles
|
Goodman: Madrid 01
|
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
|
|
8.51 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.96 miles
|
Edgnex: Madrid
|
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
|
|
9.73 miles
|
Kyndryl: Madrid
|
|
|
9.80 miles
|
inAsset NixMad
|
|
|
9.95 miles
|
Avaio: Madrid Scorpio
|
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
|
|
9.95 miles
|
Iron Mountain MAD-1
|
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
|
|
10.24 miles
|
hscale: Madrid MAD1
|
hscale plans to build its MAD1 data center campus in Madrid.
|
|
11.36 miles
|
Data4: MAD02 DC01
|
First of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid beside the A-1. It entered service in March 2026.
|
|
11.37 miles
|
Data4: MAD02 DC02
|
Second of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid, due in early 2027.
|
|
11.41 miles
|
Data4: MAD02 DC04
|
Fourth and last planned building on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
|
|
11.42 miles
|
Data4: MAD02 DC03
|
Third of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
|
|
11.44 miles
|
NTT Madrid 1
|
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
|
|
13.24 miles
|
Santander: Boadilla del Monte
|
Banco Santander's original group data center, on the Ciudad Grupo Santander headquarters campus in Boadilla del Monte, west of Madrid.
|
|
13.77 miles
|
Vaultica: MAD01
|
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
|
|
14.03 miles
|
Edged Energy: Madrid-Getafe
|
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
|
|
14.04 miles
|
Nebius: Madrid-Getafe
|
Nebius runs AI cloud capacity in Merlin Properties' MAD01 data center in Getafe, south of Madrid.
|
|
14.05 miles
|
Merlin: Madrid-Getafe
|
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
|
|
14.07 miles
|
GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.13 miles
|
Merlin: Madrid-Getafe 2
|
Merlin Properties' second data center in Getafe, south of Madrid, planned on the site of a former factory on Calle Fundidores.
|
|
14.73 miles
|
Templus: Alcala, Madrid
|
Templus MAD01, the former Mapfre data centre in Alcalá de Henares, east of Madrid. Templus bought it in a 2024 sale-leaseback and is doubling its power with a third IT room.
|
|
14.84 miles
|
Station PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.57 miles
|
Form8tion: Madrid One
|
|
|
16.62 miles
|
Apto: Madrid
|
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
|
|
17.42 miles
|
Nabiax: ADC 1
|
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
|
|
17.47 miles
|
Nabiax: ADC 2
|
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
|
|
17.47 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.52 miles
|
Nabiax: ADC 3
|
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
|
|
17.58 miles
|
Adam MAD Alcala
|
|
|
18.58 miles
|
Iridium: Carretera Nacional
|
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
|
|
18.88 miles
|
Ridge ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.95 miles
|
Pure DC: Madrid
|
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.
|