Edged Energy: Madrid-Getafe

Latest Podcast
C. Fundidores
Operational
Fully operational facility
Operated by:

Edged Energy: Madrid-Getafe

Short Code: MAD01
Year Built: 2026
PUE: 1.15
Utility Provider: Endesa
This site is leased from Merlin Properties in the Merlin: Madrid-Getafe building
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center. Its location provides proximity to Southern Europe's largest concentration of cloud services.

POWER


  • Utility Provider: Endesa
  • Utility Power: Two diverse utility feeds
  • Utility Voltage: 45 kV
  • Power Delivery: Revenue-grade, transparent, real-time metering
  • UPS: Battery backup supporting all electrical and mechanical systems; N+1 redundancy
  • Generators: 32 MW of backup power in a redundant configuration
  • Configuration: N+1

Map and Nearby Locations:

C. Fundidores
Edged Energy Sites
Nearby Facilities

Sites within 15 miles of Edged Energy: Madrid-Getafe

Distance Site About
0.00 miles Hyperscale Data Center Request Dataset
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
0.03 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
5.11 miles inAsset NixMad
5.56 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
6.56 miles Form8tion: Madrid One
7.34 miles Equinix MD4x
7.65 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
8.57 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
9.14 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
9.24 miles Digital Realty: MAD3
9.47 miles Digital Realty: MAD4
9.58 miles Grupo Aire OASIX: Madrid
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
9.63 miles Hispaweb Miguel Yuste
9.65 miles Digital Realty: MAD1
9.67 miles Digital Realty: MAD2
9.80 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
10.83 miles Produban Mesena 80
10.83 miles Espanix Datacenter
11.31 miles Carrier-Neutral Data Center Request Dataset
Global Switch acquired land next to its current Madrid data centre to build a new 24,000 square metre facility.
11.34 miles Global Switch Madrid
11.36 miles IPCore Madrid
12.21 miles AtlasEdge: Madrid MAD001
12.42 miles nLighten Madrid-Lezama
14.05 miles Ibercom Madrid
14.42 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
15.34 miles Adam Madrid
15.45 miles Prime: Madrid
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
15.49 miles Equinix MD3x
15.53 miles Equinix MD5
15.59 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
15.59 miles Equinix MD6
15.60 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
15.64 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
15.64 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
15.79 miles Equinix Madrid MD2
15.79 miles Equinix Madrid MD1
16.69 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
16.98 miles Hyperscale Data Center Request Dataset
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
17.50 miles Cogent Madrid
19.30 miles Hyperscale Data Center Request Dataset
The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.

Edged Energy: Madrid-Getafe Data Center Photos (See all)

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

40
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?