nLighten Madrid-Lezama

Latest Podcast
Calle de Lezama
Operational
Fully operational facility
Operated by:

nLighten Madrid-Lezama

Short Code: MAD1
Ownership: nLighten owns the building.
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In April 2024, nLighten acquired the site from Exa Infrastructure.

In May 2018, GTT acquired the Madrid site in a $2.3 billion acquisition of Interoute. (TR PR Source)

Power and Cooling:

  • Total power supply to site: 2000 kVA in 2N
  • configuration
  • Total generator power: 2000 kVA in 2N
  • configuration
  • Total UPS power: 800 kVA in 2N configuration
  • Cooling type: Chilled water
  • Total cooling: 340 kW-2N configuration

Datacenter Details:

  • Gross size of data centre: 4500 m²
  • Net size of customer space: 1200 m²
  • Building type: Brick & concrete
  • Building tenure: Owned
  • Number of data suites: 10
  • Suit expansion available: Yes
  • Uniform distributed loads: 1000 kg/m²
  • Max raise floor height: 0 mm

Compliance:

ICREA Certification
ISO 27001
PCI DSS
ISAE 3402 / SSAE 16

Map and Nearby Locations:

Calle de Lezama
nLighten Sites
Nearby Facilities

Sites within 15 miles of nLighten Madrid-Lezama

Distance Site About
1.41 miles AtlasEdge: Madrid MAD001
1.85 miles Ibercom Madrid
2.26 miles Produban Mesena 80
2.26 miles Espanix Datacenter
3.33 miles Prime: Madrid
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
3.36 miles Equinix MD3x
3.41 miles Equinix MD5
3.43 miles Equinix MD6
3.47 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
3.74 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
3.77 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
3.79 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
3.81 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
3.90 miles Equinix Madrid MD2
3.90 miles Equinix Madrid MD1
4.81 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
4.82 miles Digital Realty: MAD4
4.91 miles Hispaweb Miguel Yuste
5.06 miles Grupo Aire OASIX: Madrid
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
5.06 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
5.10 miles Digital Realty: MAD2
5.10 miles Digital Realty: MAD1
5.14 miles Equinix MD4x
5.27 miles Digital Realty: MAD3
5.74 miles Hyperscale Data Center Request Dataset
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
5.83 miles Cogent Madrid
6.78 miles Global Switch Madrid
6.81 miles Carrier-Neutral Data Center Request Dataset
Global Switch acquired land next to its current Madrid data centre to build a new 24,000 square metre facility.
7.07 miles IPCore Madrid
8.24 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
8.41 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
8.47 miles inAsset NixMad
8.48 miles BBVA CPD Tres Cantos
8.76 miles Quetta: Tres Cantos
10.27 miles Hyperscale Data Center Request Dataset
10.36 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
10.50 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
11.72 miles Avaio: Madrid Scorpio
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
12.42 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
12.42 miles Hyperscale Data Center Request Dataset
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
12.42 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
13.17 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
13.19 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
13.22 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
13.25 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
14.73 miles Form8tion: Madrid One
15.56 miles Hyperscale Data Center Request Dataset
The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.
15.58 miles Templus: Alcala, Madrid
18.49 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
18.49 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
18.50 miles Hyperscale Data Center Request Dataset
18.59 miles Adam MAD Alcala
19.66 miles Iridium: Carretera Nacional
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
19.99 miles Hyperscale Data Center Request Dataset

nLighten Madrid-Lezama Data Center Photos (See all)

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

nLighten is a digital infrastructure platform owned by I Squared Capital, a leading global infrastructure investor. The company is developing innovative edge data centers distributed across European key economic hubs to provide best-in-class network access to regional, national, and global enterprises, private users, and the mobile workforce. Through the strategic distribution of its edge data centers, nLighten is working towards establishing a pan-European presence in all major cities and providing access to low latency and proximity to end users across Europe.
The edge data centers developed by nLighten are designed to meet the increasing demand for faster and more reliable data processing and storage, while also being mindful of environmental impact. nLighten was founded in 2021 by a core team with many years of experience and wide-ranging expertise in the data center sector. The team's main motivation was to create the next step for the data center industry and align edge data centers with the green transition.

nLighten's goal is to build and operate the leading pan-European edge data center platform. The company's focus on strategic locations, low latency, and environmental consciousness positions it as an innovative player in the European digital infrastructure landscape.

Expansion and Acquisitions

nLighten has grown rapidly through both organic growth and strategic acquisitions:

  • In June 2023, the company acquired Euclyde Data Centers, a French regional platform with six carrier-neutral data centers.
  • In September 2023, nLighten completed the acquisition of Proximity Data Centers, a leading UK edge platform with ten carrier-neutral data centers.
  • The company also acquired 10 carrier data center sites from its sister company Exa Infrastructure.
36
Facilities
8
Markets
67MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?