Equinix Madrid MD2

Isabel Colbrand

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Equinix Madrid MD2 History:

  • In 2017 Equinix acquired Itconic. When Itconic managed the site, it was known as "Itconic Madrid 2." Press Release
  • In 2015 Itconic acquired the site from Telvent. Under Telvent the site was known as "Telvent Carrierhouse 2 Madrid

Map and Nearby Locations:

Isabel Colbrand
Click Map to begin Search

Sites within 15 miles of Equinix Madrid MD2

Show SqM
Distance Site About
0.17 miles Ibercom Madrid
1.36 miles Equinix MD3x
1.45 miles Equinix MD6
1.48 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
1.75 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
1.78 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
1.83 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
1.90 miles Equinix Madrid MD1
2.01 miles nLighten Madrid-Lezama
2.05 miles AtlasEdge: Madrid MAD001
3.46 miles Produban Mesena 80
3.83 miles Microsoft: San Sebastian
Microsoft is constructing new data center in Madrid, Spain. The facility will be constructed in the San Sebastian de los Reyes area of Madrid and will aim for LEED Gold certification.
3.83 miles Cogent Madrid
4.86 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
5.72 miles Digital Realty: MAD4
5.74 miles Hispaweb Miguel Yuste
5.87 miles Digital Realty: MAD2
5.88 miles Digital Realty: MAD1
6.03 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
6.16 miles Digital Realty: MAD3
6.88 miles BBVA CPD Tres Cantos
6.93 miles Verizon Nap of Madrid
6.93 miles Global Switch Madrid
6.93 miles Level3 Madrid
7.17 miles IPCore Madrid
8.53 miles Microsoft: MAD01
9.90 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
9.91 miles inAsset NixMad
11.21 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.23 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.26 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.29 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.56 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
14.18 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
14.18 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
16.73 miles Form8tion: Madrid One
17.34 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
17.35 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
17.47 miles Adam MAD Alcala

Equinix Madrid MD2 Data Center Photos

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Equinix cage door
Posted in Equinix

Operating Company

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

256 Facilities Owned
74 Markets Served
1572.61 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
md2_ibx_site_spec_a4-en November 2018

MD2 Data Sheet (PDF)

madrid_metro_data_sheet_us-en May 2018

Madrid Metro Overview from Equinix