0.05 miles
|
Equinix MD4x
|
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
|
|
0.06 miles
|
Equinix MD3x
|
|
|
0.08 miles
|
Prime: Madrid
|
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
|
|
0.08 miles
|
CyrusOne Madrid I
|
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
|
|
0.12 miles
|
Equinix MD6
|
|
|
0.14 miles
|
Ferrovial: Alcobendas MAD01
|
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
|
|
0.62 miles
|
Data4: MAD01 DC3
|
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
|
|
0.64 miles
|
DATA4: MAD01 DC1
|
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
|
|
0.66 miles
|
Equinix Madrid MD2
|
|
|
0.66 miles
|
Equinix Madrid MD1
|
|
|
0.71 miles
|
Data4: MAD01 DC2
|
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
|
|
1.57 miles
|
Ibercom Madrid
|
|
|
2.49 miles
|
Cogent Madrid
|
|
|
2.68 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.32 miles
|
AtlasEdge: Madrid MAD001
|
|
|
3.41 miles
|
nLighten Madrid-Lezama
|
|
|
4.72 miles
|
Espanix Datacenter
|
|
|
4.72 miles
|
Produban Mesena 80
|
|
|
5.76 miles
|
BBVA CPD Tres Cantos
|
|
|
6.00 miles
|
NxN: Madrid
|
NxN Data Centers is developing its first Madrid data center at Calle de las Abelias, 1 in Hortaleza, Madrid, through the conversion of the former Banco Popular headquarters building.
|
|
6.01 miles
|
AtlasEdge: Calle de Telemaco
|
Former Colt facility that was acquired by AtlasEdge in 2021
|
|
6.13 miles
|
Quetta: Tres Cantos
|
|
|
6.74 miles
|
Digital Realty: MAD5
|
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
|
|
6.76 miles
|
Hispaweb Miguel Yuste
|
|
|
6.81 miles
|
Digital Realty: MAD4
|
|
|
6.86 miles
|
Digital Realty: MAD2
|
|
|
6.86 miles
|
Digital Realty: MAD1
|
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
|
|
6.88 miles
|
Grupo Aire OASIX: Madrid
|
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
|
|
7.11 miles
|
Nabiax: Julián Camarillo Campus
|
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
|
|
7.11 miles
|
Prime HubInterested in this information?Contact us
|
|
|
7.17 miles
|
Digital Realty: MAD3
|
|
|
7.47 miles
|
Global Switch: Madrid 1
|
|
|
7.51 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.73 miles
|
IPCore Madrid
|
|
|
8.08 miles
|
Echelon Iberdrola: Madrid South
|
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
|
|
8.51 miles
|
Avaio: Madrid Scorpio
|
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
|
|
8.68 miles
|
Goodman: Madrid 01
|
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
|
|
9.81 miles
|
Data4: MAD02 DC01
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
9.83 miles
|
Data4: MAD02 DC02
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
9.86 miles
|
Data4: MAD02 DC03
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
9.89 miles
|
Data4: MAD02 DC04
|
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
|
|
9.90 miles
|
Edgnex: Madrid
|
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
|
|
10.01 miles
|
Iron Mountain MAD-1
|
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
|
|
10.34 miles
|
Kyndryl: Madrid
|
|
|
11.13 miles
|
inAsset NixMad
|
|
|
11.81 miles
|
hscale: Madrid MAD1
|
hscale plans to build its MAD1 data center campus in Madrid.
|
|
12.30 miles
|
NTT Madrid 1
|
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
|
|
13.30 miles
|
Vaultica: MAD01
|
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
|
|
14.28 miles
|
Templus: Alcala, Madrid
|
|
|
14.52 miles
|
East CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.53 miles
|
Merlin: Madrid-Getafe
|
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
|
|
15.53 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.53 miles
|
Edged Energy: Madrid-Getafe
|
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
|
|
16.81 miles
|
Nabiax: ADC 1
|
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
|
|
16.82 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.83 miles
|
Nabiax: ADC 2
|
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
|
|
16.88 miles
|
Nabiax: ADC 3
|
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
|
|
16.96 miles
|
Adam MAD Alcala
|
|
|
17.98 miles
|
Iridium: Carretera Nacional
|
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
|
|
18.14 miles
|
Form8tion: Madrid One
|
|
|
18.15 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
18.19 miles
|
Apto: Madrid
|
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
|
|
18.23 miles
|
Pure DC: Madrid
|
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.
|