0.18 miles
|
Tower TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.59 miles
|
Iridium: Carretera Nacional
|
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
|
|
1.74 miles
|
Nabiax: ADC 3
|
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
|
|
1.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
1.74 miles
|
Nabiax: ADC 2
|
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
|
|
1.75 miles
|
Nabiax: ADC 1
|
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
|
|
1.81 miles
|
Adam MAD Alcala
|
|
|
5.10 miles
|
Templus: Alcala, Madrid
|
Templus MAD01, the former Mapfre data centre in Alcalá de Henares, east of Madrid. Templus bought it in a 2024 sale-leaseback and is doubling its power with a third IT room.
|
|
5.71 miles
|
Vaultica: MAD01
|
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
|
|
5.89 miles
|
Prime CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.98 miles
|
IREN: Guadalajara GUA1
|
IREN plans a data center in the El Ruiseñor industrial area of Guadalajara, a project Nostrum Group developed before IREN acquired it.
|
|
11.01 miles
|
Iron Mountain MAD-1
|
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
|
|
11.46 miles
|
Kyndryl: Madrid
|
|
|
12.77 miles
|
Avaio: Madrid Scorpio
|
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
|
|
13.09 miles
|
West StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.67 miles
|
Goodman: Madrid 01
|
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
|
|
14.75 miles
|
IPCore Madrid
|
|
|
14.91 miles
|
Global Switch: Madrid 1
|
|
|
14.93 miles
|
Global Switch: Madrid 2
|
Global Switch has begun construction of a second data center building beside its existing Madrid facility.
|
|
15.79 miles
|
Plaza PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.52 miles
|
Cogent Madrid
|
|
|
16.81 miles
|
Edgnex: Madrid
|
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
|
|
17.28 miles
|
NxN: Madrid
|
NxN NX02, a data centre in the former Banco Popular headquarters in Hortaleza, Madrid, commissioned in 2026 after a €20 million conversion.
|
|
17.38 miles
|
Digital Realty: MAD2
|
|
|
17.41 miles
|
Digital Realty: MAD1
|
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
|
|
17.51 miles
|
Data4: MAD01 DC2
|
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
|
|
17.52 miles
|
Templus: Madrid MAD03
|
Templus MAD03 on Calle de Albasanz in Madrid's Julián Camarillo data centre cluster, formerly Grupo Aire's Oasix Madrid. Templus bought it in January 2026.
|
|
17.57 miles
|
Hispaweb Miguel Yuste
|
|
|
17.59 miles
|
DATA4: MAD01 DC1
|
DATA4's first Spanish data centre, opened in 2020 in Alcobendas. It is the largest of three buildings on the MAD01 campus, which connects to the ESpanix exchange.
|
|
17.60 miles
|
Equinix Madrid MD2
|
Equinix's Madrid peering hub in Alcobendas, a node of the ESpanix and DE-CIX Madrid exchanges, opened in 2001 as Carrierhouse Madrid 2.
|
|
17.60 miles
|
Data4: MAD01 DC3
|
Third building of DATA4's MAD01 campus in Alcobendas, built from 2023. The three-floor, 15,000 m² building holds six data halls.
|
|
17.68 miles
|
Digital Realty: MAD3
|
|
|
17.84 miles
|
Digital Realty: MAD4
|
|
|
17.90 miles
|
Digital Realty: MAD5
|
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
|
|
17.96 miles
|
Nabiax: Julián Camarillo Campus
|
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
|
|
18.09 miles
|
Data4: MAD02 DC02
|
Second of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid, due in early 2027.
|
|
18.12 miles
|
Ferrovial: Alcobendas MAD01
|
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
|
|
18.13 miles
|
Data4: MAD02 DC03
|
Third of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
|
|
18.14 miles
|
Data4: MAD02 DC01
|
First of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid beside the A-1. It entered service in March 2026.
|
|
18.19 miles
|
Data4: MAD02 DC04
|
Fourth and last planned building on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
|
|
18.23 miles
|
Equinix MD5
|
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
|
|
18.25 miles
|
CyrusOne Madrid I
|
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
|
|
18.25 miles
|
Prime: Madrid
|
Prime Data Centers plans a hyperscale data centre in Alcobendas, north of Madrid, on land it secured in 2024.
|
|
18.28 miles
|
Equinix MD3x
|
Equinix's first xScale hyperscale data centre in Spain, on its Alcobendas campus north of Madrid.
|
|
18.29 miles
|
Equinix MD6
|
A retail Equinix data hall inside the MD3x xScale building on the Alcobendas campus north of Madrid.
|
|
18.33 miles
|
Equinix MD4x
|
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
|
|
18.53 miles
|
BBVA: Ciudad BBVA
|
BBVA's backup data center sits inside the Ciudad BBVA headquarters campus in Madrid's Las Tablas district and pairs with the bank's main data center in Tres Cantos.
|
|
18.72 miles
|
Templus: Madrid MAD02
|
Templus MAD02, the former Colt and AtlasEdge Madrid data centre in the Manoteras business park, Hortaleza. Templus bought it from AtlasEdge in 2026.
|
|
18.87 miles
|
Equinix Madrid MD1
|
Equinix's original Madrid data centre in Las Tablas, opened in 2000 as Carrierhouse Madrid-1 and acquired with Itconic in 2017.
|
|
18.92 miles
|
Espanix Datacenter
|
|
|
18.95 miles
|
Orange: Madrid Las Tablas
|
A MasOrange internet data centre on the fourth floor of the Edificio Auge I office building in Las Tablas, Madrid, built by Ibercom.
|