Digital Realty: MAD1

Latest Podcast Calle de Albasanz 71
Operational
Fully operational facility
Operated by:

Digital Realty: MAD1

Short Code: MAD1
Year Built: 2000
Utility Provider: UFD
Ownership: Digital Realty Trust does not own the building.
Lot Size: 1 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

MAD1 Technical Specifications


• Located 10 minutes from the city centre and Madrid airport
• 11,000 sqm customer space
• 99.999% uptime SLA
• N+1 Generator Backup
• 2N Uninterruptible power system (UPS)
• High Density Racks available

Connectivity


• Dual-entry fiber from two separate carrier main routes
• Access to 130+ Carriers/ISPs
• Direct access to the ESpanix and DE-CIX exchanges
• Low latency access to major hyperscale cloud service providers

Certifications


• SOC1
• SOC2
• PCI-DSS
• ISO 9001
• ISO 14001
• ISO 22301
• ISO 27001
• ISO 50001
• ISO 20001
• ENS

Map and Nearby Locations

Calle de Albasanz 71
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: MAD1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: MAD1

Distance Site About
0.03 miles Digital Realty: MAD2
0.11 miles Templus: Madrid MAD03
Templus MAD03 on Calle de Albasanz in Madrid's Julián Camarillo data centre cluster, formerly Grupo Aire's Oasix Madrid. Templus bought it in January 2026.
0.20 miles Hispaweb Miguel Yuste
0.39 miles Digital Realty: MAD3
0.45 miles Digital Realty: MAD4
0.50 miles Digital Realty: MAD5
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
0.59 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
0.86 miles NxN: Madrid
NxN NX02, a data centre in the former Banco Popular headquarters in Hortaleza, Madrid, commissioned in 2026 after a €20 million conversion.
2.52 miles Global Switch: Madrid 2
Global Switch has begun construction of a second data center building beside its existing Madrid facility.
2.52 miles Global Switch: Madrid 1
2.74 miles IPCore Madrid
2.84 miles Espanix Datacenter
3.18 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
3.98 miles Goodman: Madrid 01
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
3.98 miles Templus: Madrid MAD02
Templus MAD02, the former Colt and AtlasEdge Madrid data centre in the Manoteras business park, Hortaleza. Templus bought it from AtlasEdge in 2026.
4.38 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
4.67 miles inAsset NixMad
4.78 miles BBVA: Ciudad BBVA
BBVA's backup data center sits inside the Ciudad BBVA headquarters campus in Madrid's Las Tablas district and pairs with the bank's main data center in Tres Cantos.
5.08 miles nLighten Madrid-Lezama
5.76 miles Equinix Madrid MD1
Equinix's original Madrid data centre in Las Tablas, opened in 2000 as Carrierhouse Madrid-1 and acquired with Itconic in 2017.
5.81 miles Orange: Madrid Las Tablas
A MasOrange internet data centre on the fourth floor of the Edificio Auge I office building in Las Tablas, Madrid, built by Ibercom.
6.17 miles Kyndryl: Madrid
6.58 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
6.68 miles DATA4: MAD01 DC1
DATA4's first Spanish data centre, opened in 2020 in Alcobendas. It is the largest of three buildings on the MAD01 campus, which connects to the ESpanix exchange.
6.70 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
6.73 miles Data4: MAD01 DC3
Third building of DATA4's MAD01 campus in Alcobendas, built from 2023. The three-floor, 15,000 m² building holds six data halls.
6.80 miles Prime: Madrid
Prime Data Centers plans a hyperscale data centre in Alcobendas, north of Madrid, on land it secured in 2024.
6.86 miles Equinix MD5
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
6.88 miles Equinix Madrid MD2
Equinix's Madrid peering hub in Alcobendas, a node of the ESpanix and DE-CIX Madrid exchanges, opened in 2001 as Carrierhouse Madrid 2.
6.89 miles Equinix MD3x
Equinix's first xScale hyperscale data centre in Spain, on its Alcobendas campus north of Madrid.
6.90 miles Equinix MD6
A retail Equinix data hall inside the MD3x xScale building on the Alcobendas campus north of Madrid.
6.90 miles Equinix MD4x
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
6.91 miles Ferrovial: Alcobendas MAD01
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
6.94 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
7.58 miles West CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.05 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
8.26 miles Cogent Madrid
9.65 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
9.65 miles Nebius: Madrid-Getafe
Nebius runs AI cloud capacity in Merlin Properties' MAD01 data center in Getafe, south of Madrid.
9.66 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
9.68 miles Core CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.94 miles Merlin: Madrid-Getafe 2
Merlin Properties' second data center in Getafe, south of Madrid, planned on the site of a former factory on Calle Fundidores.
11.27 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.71 miles Vaultica: MAD01
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
12.11 miles East CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.46 miles Templus: Alcala, Madrid
Templus MAD01, the former Mapfre data centre in Alcalá de Henares, east of Madrid. Templus bought it in a 2024 sale-leaseback and is doubling its power with a third IT room.
12.62 miles BBVA CPD Tres Cantos
12.71 miles Avaio: Madrid Scorpio
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
12.95 miles Merlin: Madrid-Tres Cantos
Merlin Properties plans a data center in Tres Cantos, north of Madrid, on land being urbanised beside the M-607.
12.99 miles Quetta: Tres Cantos
13.42 miles Santander: Boadilla del Monte
Banco Santander's original group data center, on the Ciudad Grupo Santander headquarters campus in Boadilla del Monte, west of Madrid.
14.08 miles Form8tion: Madrid One
14.13 miles Apto: Madrid
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
14.74 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
15.69 miles Nabiax: ADC 1
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
15.71 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
15.71 miles Hyperscale Data CenterInterested in this information?Contact us
15.74 miles Nabiax: ADC 3
Nabiax’s ADC3 (Alcalá Data Center 3) is a new hyperscale facility under construction in Alcalá de Henares, near Madrid.
15.74 miles Adam MAD Alcala
15.96 miles Data4: MAD02 DC02
Second of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid, due in early 2027.
15.96 miles Data4: MAD02 DC01
First of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid beside the A-1. It entered service in March 2026.
16.02 miles Data4: MAD02 DC03
Third of four buildings on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
16.03 miles Data4: MAD02 DC04
Fourth and last planned building on DATA4's MAD02 campus at San Agustín del Guadalix, north of Madrid.
16.58 miles Iridium: Carretera Nacional
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
17.40 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.41 miles Pure DC: Madrid
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.

Digital Realty: MAD1 Data Center Photos See all

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.