Digital Realty: Midlothian

Latest Podcast Gifco Rd at Quarry Rd
Planned
Future facility in planning stage
Operated by:

Digital Realty: Midlothian

Site planned for 2029 and has expansions through 2032
Utility Provider: Oncor
Lot Size: 167 acres

Digital Realty owns about 167 acres at the southeast corner of Gifco Road and Quarry Road in Midlothian, Ellis County, where it plans a campus of four data center buildings of about 820,000 sq ft each. The plan includes a gas-turbine power plant for each building and a future substation. Construction has not started.

Site History

  • April 2025: Midlothian City Council approves the zoning, 6-1, with a 75 ft height cap.

Map and Nearby Locations

Gifco Rd at Quarry Rd
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: Midlothian Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: Midlothian

Distance Site About
4.01 miles Aligned: DFW-03
Aligned's DFW-03 is a two-story data center under construction on Britton Road in east Mansfield, south of Fort Worth.
4.24 miles PowerHouse: Grand Prairie Campus
PowerHouse Data Centers and Provident are building a 28-building data center campus off Miller Road in Grand Prairie, south of Dallas, with an on-site Oncor switching station.
5.42 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.52 miles Cloud StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.78 miles Station ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.83 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.84 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.93 miles North ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.02 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.81 miles KDC: Midlothian Digital Ranch
KDC plans the Digital Ranch data center campus on about 396 acres south of the Midlothian RailPort, with on-site power generation.
7.24 miles Logistic Land Investments: Venus, TX
Logistics Land Investment plans a four-building data center campus on farmland on County Road 109 in Venus, Texas, which the city annexed and rezoned for industrial use in 2025.
11.78 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.50 miles Compass: Red Oak DFW III-I
Compass Datacenters' DFW III-I is the first and smallest data center on its DFW III campus in Red Oak, south of Dallas, completed in 2020.
12.64 miles Compass: Red Oak I
Compass Datacenters' Red Oak I is building 1 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
12.66 miles Ridge PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.66 miles Compass: Red Oak II
Compass Datacenters' Red Oak II is building 2 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
12.67 miles Compass: Red Oak III
Compass Datacenters' Red Oak III is building 3 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
12.68 miles Station UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.69 miles Edge ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.69 miles Compass: Red Oak IV
Compass Datacenters' Red Oak IV is building 4 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
12.69 miles Compass: Red Oak V
Compass Datacenters' Red Oak V is building 5 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
12.70 miles Global PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.71 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.00 miles Mapletree: 5000 South Bowen
Mapletree Industrial Trust owns a former Atos data center on South Bowen Road in Arlington, Texas, which has stood empty since Atos's lease ended in 2023.
13.15 miles Ridge TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.16 miles Compass: Red Oak VI
Compass Datacenters' Red Oak VI is building 6 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
13.16 miles Compass: Red Oak VII
Compass Datacenters' Red Oak VII is building 7 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
13.18 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.18 miles Tower OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.19 miles Compass: Red Oak VIII
Compass Datacenters' Red Oak VIII is building 8 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
13.20 miles Edge PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.20 miles Hub MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.44 miles Compass: Red Oak IX
Compass Datacenters' Red Oak IX is building 9 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
13.45 miles Campus TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.59 miles Compass: Red Oak X
Compass Datacenters' Red Oak X is building 10 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
13.60 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.63 miles Compass: Red Oak Goodloe Lane Campus
Compass Datacenters' planned second data center campus in Red Oak, Texas, on about 830 acres the city rezoned for eight two-story buildings in 2026.
14.99 miles Skybox: PowerCampus Dallas
Skybox Datacenters' PowerCampus Dallas is a three-building data center campus with its own substation in Lancaster, south of Dallas; Google operates its first building.
15.00 miles Central CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.09 miles DataBank: DFW15
DFW15 is the seventh of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.17 miles DataBank: DFW14
DFW14 is the sixth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.21 miles DataBank: DFW16
DFW16 is the last of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.24 miles DataBank: DFW13
DFW13 is the fifth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.26 miles Diode Ventures: Weston Holladay Technology Park
Diode Ventures plans the Weston Holladay Technology Park, a hyperscale data center campus on more than 900 acres in Red Oak, south of Dallas.
16.40 miles DataBank: DFW12
DFW12 is the fourth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.40 miles EdgeConneX: Fort Worth (Everman)
EdgeConneX owns a 175-acre tract on Forest Hill Drive and Enon Road in southeast Fort Worth, zoned for data centers in 2025, next to Black Mountain Power's planned campus.
16.40 miles DataBank: DFW11
DFW11 is the third of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.41 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.42 miles Campus ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.50 miles Lincoln: Red Oak DFW2
Planned data center building DFW2 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. It is the campus's lead building, with an initial phase targeted for the second quarter of 2028.
16.53 miles DataBank: DFW10
DFW10 is the second of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
16.55 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.56 miles DataBank: DFW9
DFW9 is the first of eight planned buildings on DataBank's 292-acre Red Oak campus in Ellis County, south of Dallas.
16.58 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.63 miles Yondr: Lancaster 1
First planned building at Yondr's Lancaster campus, on the 29-acre west tract at 801 E. Belt Line Road. Yondr's concept plan shows a two-hall building of about 300,000 sq ft. Construction has not started.
16.67 miles Verizon: Arlington Data Center
Verizon Business runs a network data center in the former MCI WorldCom building on 113th Street in Arlington's Great Southwest Industrial District.
16.73 miles Lincoln: Red Oak DFW3
Planned data center building DFW3 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
16.75 miles Lincoln: Red Oak DFW4
Planned data center building DFW4 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
16.80 miles Black Mountain: Fort Worth, TX
Black Mountain Power plans a four-building data center campus with an on-site substation off Lon Stephenson Road in southeast Fort Worth, next to Forest Hill; the city approved its site plan in August 2026.
16.83 miles Stack: DFW02 Expansion
Expansion land on STACK Infrastructure's DFW02 campus in Lancaster, held for buildings beyond the five in STACK's 2026 plan.
16.91 miles Stack: DFW02E
STACK Infrastructure's DFW02E is building 5 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
16.94 miles Yondr: Lancaster Expansion
Four later buildings on Yondr's Lancaster campus between East Belt Line Road and Greene Road, from Yondr's five-building concept plan.
16.96 miles Stack: DFW02D
STACK Infrastructure's DFW02D is building 4 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
17.05 miles QTS: DFW3-DC1
DC1 is the first of two data centers QTS plans on its 98.6-acre DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft on the west side of the site. Construction has not started.
17.06 miles Stack: DFW02F
DFW02F was the sixth building in STACK Infrastructure's original 2024 plan for its DFW02 campus in Lancaster. STACK's 2026 plan has five larger buildings and no DFW02F.
17.10 miles Stack: DFW02C
STACK Infrastructure's DFW02C is building 3 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
17.14 miles Stack: DFW02A
STACK Infrastructure's DFW02A is building 1 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
17.15 miles QTS: DFW3-DC2
DC2 is the second of two data centers QTS plans on its DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft east of DC1, beside the site's planned substation. Construction has not started.
17.15 miles Stack: DFW02B
STACK Infrastructure's DFW02B is building 2 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
17.35 miles D.R. Horton: Arlington Data Center
D.R. Horton built its own data center next to its headquarters area in Arlington, Texas, completed in 2022.
17.82 miles QTS: Greene Road DC1
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
17.94 miles QTS: Greene Road Expansion
Buildings B to E on QTS's Greene Road tract in Lancaster, Texas, from the five-building Project Labrador zoning plan.
18.71 miles NTT: Lancaster TX10 Expansion
Six later buildings (TX12 to TX17) on NTT's Lancaster campus at Sunrise Road and Belt Line Road, from the seven-building test fit for the 108.7-acre tract.
18.75 miles NTT: TX11
TX11 is the first planned building on NTT's Lancaster campus at Sunrise Road and Belt Line Road, a data center of about 225,000 sq ft on the 108.7-acre tract NTT bought in December 2025.
18.81 miles 5CDC: Dallas DFW01
5C Data Centers proposed converting a distribution warehouse on John Burgess Drive in southeast Fort Worth into a high-density data center; no conversion work has started.
18.89 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.94 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.95 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.00 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.01 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.03 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.06 miles QTS: DFW2-DC7
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
19.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.10 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.12 miles QTS: DFW2 Expansion
DFW2 Expansion holds the fourth planned building on QTS's 113.5-acre Dallas II tract between Sunrise Road and Mason Road in Wilmer and Lancaster, Texas. QTS has not filed it with the state.
19.14 miles QTS: DFW2-DC1
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
19.22 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.27 miles QTS: DFW2-DC2
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
19.28 miles QTS: DFW2-DC4
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
19.31 miles QTS: DFW2-DC5
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
19.31 miles QTS: DFW2-DC3
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
19.38 miles QTS: Dallas IV
Dallas IV is QTS's 131-acre tract at 501 Lavender Road in Wilmer, Texas, planned for five data center buildings of about 378,100 sq ft each. QTS has not filed any of them with the state.
19.45 miles QTS: DFW2-DC6
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
19.70 miles QTS: Dallas III
Dallas III is a planned QTS data center of about 336,500 sq ft on 53.8 acres east of Mason Road at Belt Line Road in Wilmer, Texas, on the DFW2 plat. QTS has not filed it with the state.
19.73 miles QTS: Dallas VI
Dallas VI is QTS's tract of about 75 acres at 401 Lavender Road in Wilmer, Texas, planned for three data center buildings of 285,000 to 378,100 sq ft. QTS has not filed any of them with the state.
19.85 miles Alcon: Fort Worth Data Center
Alcon runs its own data center on its US headquarters campus on South Freeway in Fort Worth, Texas.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.