|
0.00 miles
|
Lumen Minneapolis 2
|
|
|
0.00 miles
|
Level3 Minneapolis (511 11th)
|
|
|
0.00 miles
|
DataBank Minneapolis MSP4
|
In 2020, DataBank acquired the facility from Zayo.
|
|
0.01 miles
|
511 Building - Minnesota Technology Center
|
|
|
0.76 miles
|
Lumen Minneapolis 1
|
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
|
0.76 miles
|
Cloud Capital: Minneapolis CBD
|
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
|
0.76 miles
|
G42: Minneapolis
|
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
|
0.91 miles
|
Verizon: 250 Marquette
|
The site is a previous XO Communications facility
|
|
0.91 miles
|
Cogent: 250 Marquette
|
|
|
1.16 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
|
1.87 miles
|
Verizon: 1200 Washington
|
Former XO Communications site
|
|
5.25 miles
|
H5 Minneapolis
|
|
|
8.28 miles
|
US Signal: Saint Paul
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
8.36 miles
|
Databank Minneapolis Edina MSP1
|
|
|
8.36 miles
|
Consolidated Edina
|
|
|
9.32 miles
|
Lumen Minnetonka
|
|
|
9.71 miles
|
EdgeConnex Minneapolis
|
|
|
9.81 miles
|
Swervo: Eagan
|
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
|
9.82 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
9.92 miles
|
US Signal: MN01 Minneapolis
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
10.61 miles
|
DataBank Minneapolis Eagan MSP2
|
|
|
12.19 miles
|
Centra: Minneapolis
|
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
|
12.37 miles
|
Connect Data Centers: Eagan, MN
|
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
|
12.98 miles
|
QLevr: Inver Grove Heights
|
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|
|
13.57 miles
|
DataBank Brooklyn Park MSP3
|
|
|
14.69 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
14.85 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
16.71 miles
|
Centersquare: Minneapolis MP2
|
|
|
17.12 miles
|
Connect Data Centers: Apple Valley, MN
|
Following a year-long application process, Apple Valley city officials have rejected Oppidan and Rockport LLC’s proposal for a massive data center campus outside Minneapolis.
|
|
17.22 miles
|
Edged Energy: Minneapolis MSP01
|
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
|
17.22 miles
|
Edged Energy: MSP01 Expansion
|
|
|
18.21 miles
|
East ParkInterested in this information?Contact us
|
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
|
|
18.66 miles
|
PointInterested in this information?Contact us
|
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
|
|
18.80 miles
|
Flexential Minneapolis
|
|