Cloud Capital: Minneapolis CBD

Latest Podcast
1001 3rd Ave South
OperationalUnder Construction
Fully operational with expansion in progress
Operated by:

Cloud Capital: Minneapolis CBD

Short Code: MPLS1001
Site was first built in 1990 and has expansions through 2026
Floors: 6
Ownership: Cloud Capital owns the building.
Lot Size: 3 acres

Sites leasing space from Cloud Capital:

░░░░ Request Dataset MW
Total Power

In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.

Minneapolis CBD (MPLS1001) Features


  • Building Name: MPLS CBD Data Center (MPLS1001)
  • Land Parcel: 2.5 acres
  • Building Size: +/-500,000 sq.ft.
  • Raised Floor Area: 95,000+ sq.ft.
  • Redundancy: Configured as N+1 or adjustable to tenant needs
  • Number of Data Halls: Four (4) expandable

Network


  • POE Conduits: Two diverse building entry points
  • Meet-Me-Rooms: Two (2)
  • Onsite Carriers: Seven (7) carriers including Lumen/Level3, ATT, Verizon, Comcast, Cogent with many others nearby.
  • Carrier Hotel Proximity: Latency time to 511 is 0.2ms round trip with dark fiber and other low latency transport services available

Certifications (Planned)


  • SSAE 16 Type II
  • PCI-DSS
  • ISO27001
  • ITIL
  • Energy Star

Map and Nearby Locations:

1001 3rd Ave South
Cloud Capital Sites
Nearby Facilities

Sites within 15 miles of Cloud Capital: Minneapolis CBD

Distance Site About
0.00 miles G42: Minneapolis
G42 is the primary tenant of Legacy Investing's Minneapolis CBD data center.
0.16 miles Level3 Minneapolis (222 South 9th)
0.64 miles Cogent: 250 Marquette
0.66 miles Verizon: 250 Marquette
The site is a previous XO Communications facility
0.76 miles DataBank Minneapolis MSP4
In 2020, DataBank acquired the facility from Zayo.
0.76 miles Lumen Minneapolis 2
0.76 miles Cologix: Minnesota Technology Center
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved MIN1 is the Building's MMR
0.76 miles Level3 Minneapolis (511 11th)
0.77 miles 511 Building - Minnesota Technology Center
0.95 miles IronGate: MSP4
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
1.45 miles Verizon: 1200 Washington
Former XO Communications site
6.01 miles H5 Minneapolis
8.07 miles Consolidated Edina
8.07 miles Databank Minneapolis Edina MSP1
8.68 miles Lumen Minnetonka
9.03 miles US Signal: Saint Paul
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
9.16 miles EdgeConnex Minneapolis
9.37 miles US Signal: MN01 Minneapolis
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
10.18 miles Swervo: Eagan
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
10.18 miles IronGate: MSP3
11.03 miles DataBank Minneapolis Eagan MSP2
12.65 miles Centra: Minneapolis
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
12.84 miles Connect Data Centers: Eagan, MN
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
13.21 miles DataBank Brooklyn Park MSP3
15.45 miles IronGate: MSP2
15.61 miles IronGate Woodbury MSP1
16.26 miles Centersquare: Minneapolis MP2
17.32 miles Connect Data Centers: Apple Valley, MN
The Apple Valley Campus will consist of seven buildings, five of which will be dedicated data centers, encompassing a total building area of approximately 1 million square feet (92,900 sqm).
17.53 miles Edged Energy: MSP01 Expansion
17.53 miles Edged Energy: Minneapolis MSP01
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
18.13 miles Flexential Minneapolis
18.63 miles Hyperscale Data Center Request Dataset
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
19.07 miles Hyperscale Data Center Request Dataset
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.

Cloud Capital: Minneapolis CBD Data Center Photos (See all)

Outside of T5 Minneapolis
Source: Baxtel
Loading Dock
Source: T5
Electrical
Source: T5

Operating Company

Operated by:

Cloud Capital invests in early-stage opportunities (pre-seed/seed/pre-series A) across India, US, and SEA.

1
Facilities
0
Markets

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?