Go to PodcastCLOP Eagan MN, LLC, with involvement from Oppidan, is developing a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota. The project, on land subdivided in the early 1990s, has begun construction in June 2025, with full operation expected by December 2026. Oppidan lists Connect Data Centers as a subsidiary.
| Distance | Site | About |
|---|---|---|
| 0.36 miles | Centra: Minneapolis |
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
| 2.07 miles | DataBank Minneapolis Eagan MSP2 | |
| 3.24 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
|
| 3.25 miles | Unisys: Eagan |
Former Unisys data center in Eagan, Minnesota, built in 1987 on the Sperry Park campus. Unisys ran it until it sold the property in November 2025.
|
| 4.25 miles | QLevr: Inver Grove Heights |
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|
| 5.98 miles | Valley ThreeInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 6.04 miles | Edged Energy: MSP01 Expansion | |
| 6.04 miles | Edged Energy: MSP01-1 |
MSP01-1 is the first planned building on Edged Energy's MSP01 campus in the Minneapolis-St. Paul area.
|
| 6.49 miles | ProInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 7.64 miles | Connect Data Centers: Apple Valley, MN |
Following a year-long application process, Apple Valley city officials have rejected Oppidan and Rockport LLC’s proposal for a massive data center campus outside Minneapolis.
|
| 8.48 miles | US Signal: Saint Paul |
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
| 8.53 miles | Tract: Rosemount Expansion | |
| 8.57 miles | Tract: Rosemount 1 |
Rosemount 1 was the first planned data center building at Tract's proposed Rosemount technology park south of Highway 55 between Emery and Fischer Avenues, Rosemount, Minnesota. Tract withdrew its application in June 2025.
|
| 10.30 miles | H5 Minneapolis | |
| 11.12 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
|
| 11.22 miles | Consolidated Edina |
|
| 11.22 miles | Databank Minneapolis Edina MSP1 | |
| 11.24 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
|
| 12.37 miles | Lumen Minneapolis 2 |
|
| 12.37 miles | Cologix: Minnesota Technology Center |
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
| 12.37 miles | DataBank Minneapolis MSP4 |
In 2020, DataBank acquired the facility from Zayo.
|
| 12.37 miles | Level3 Minneapolis (511 11th) | |
| 12.37 miles | 511 Building - Minnesota Technology Center |
|
| 12.84 miles | Cloud Capital: Minneapolis CBD |
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
| 12.84 miles | G42: Minneapolis |
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
| 12.95 miles | Lumen Minneapolis 1 |
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
| 13.27 miles | Cogent: 250 Marquette | |
| 13.27 miles | Verizon: 250 Marquette |
The site is a previous XO Communications facility
|
| 13.52 miles | Carrier-Neutral Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 13.72 miles | Tract: Farmington 1 |
Tract is pursuing plans for a $5 billion data center development at the Farmington Technology Park in Dakota County, Minnesota.
|
| 13.83 miles | Tract: Farmington Expansion | |
| 14.22 miles | Verizon: 1200 Washington |
Former XO Communications site
|
| 14.99 miles | EdgeConnex Minneapolis |
|
| 15.13 miles | US Signal: MN01 Minneapolis |
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
| 16.27 miles | Lumen Minnetonka |
|
| 16.36 miles | Connect Data Centers: Hampton Campus |
Oppidan plans to build a huge Technology park on approximately 140 acres in Hampton, Minnesota.
|
| 17.79 miles | Centersquare: Minneapolis MP2 |
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast