7.22 miles
|
US Signal: MN01 Minneapolis
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
7.40 miles
|
EdgeConnex Minneapolis
|
|
|
8.22 miles
|
Flexential Minneapolis
|
|
|
8.53 miles
|
US Bank Chaska (Stream DC2)
|
|
|
8.53 miles
|
UnitedHealth Chaska
|
|
|
8.64 miles
|
Stream Minneapolis
|
Stream Data Centers sold the facility as part of a corporate transaction where Apollo Global Management acquired a majority stake in the company.
|
|
8.69 miles
|
Consolidated Edina
|
|
|
8.69 miles
|
Databank Minneapolis Edina MSP1
|
|
|
8.69 miles
|
Lightedge: Minneapolis
|
|
|
8.75 miles
|
CloudHQ: Chaska MN
|
The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.
|
|
8.84 miles
|
Lumen Minnetonka
|
|
|
14.31 miles
|
Connect Data Centers: Apple Valley, MN
|
The Apple Valley Campus will consist of seven buildings, five of which will be dedicated data centers, encompassing a total building area of approximately 1 million square feet (92,900 sqm).
|
|
15.10 miles
|
Swervo: Eagan
|
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
|
15.10 miles
|
IronGate: MSP3
|
|
|
16.13 miles
|
DataBank Minneapolis Eagan MSP2
|
|
|
16.26 miles
|
Cloud Capital: Minneapolis CBD
|
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
|
16.26 miles
|
G42: Minneapolis
|
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
|
16.40 miles
|
Lumen Minneapolis 1
|
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
|
16.71 miles
|
Lumen Minneapolis 2
|
|
|
16.71 miles
|
Cologix: Minnesota Technology Center
|
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
|
16.71 miles
|
Level3 Minneapolis (511 11th)
|
|
|
16.71 miles
|
DataBank Minneapolis MSP4
|
In 2020, DataBank acquired the facility from Zayo.
|
|
16.72 miles
|
511 Building - Minnesota Technology Center
|
|
|
16.85 miles
|
Cogent: 250 Marquette
|
|
|
16.86 miles
|
Verizon: 250 Marquette
|
The site is a previous XO Communications facility
|
|
16.87 miles
|
Edged Energy: MSP01 Expansion
|
|
|
16.87 miles
|
Edged Energy: Minneapolis MSP01
|
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
|
17.10 miles
|
IronGate: MSP4
|
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
|
17.13 miles
|
Verizon: 1200 Washington
|
Former XO Communications site
|
|
17.43 miles
|
Centra: Minneapolis
|
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
|
17.79 miles
|
Connect Data Centers: Eagan, MN
|
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
|
19.81 miles
|
Hyperscale Data Center
Request Dataset
|
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
|
|
19.82 miles
|
Hyperscale Data Center
Request Dataset
|
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
|
|
19.90 miles
|
Tract: Farmington Expansion
|
|