|
0.01 miles
|
DataBank Minneapolis MSP4
|
In 2020, DataBank acquired the facility from Zayo.
|
|
0.01 miles
|
Lumen Minneapolis 2
|
|
|
0.01 miles
|
Cologix: Minnesota Technology Center
|
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
|
0.01 miles
|
Level3 Minneapolis (511 11th)
|
|
|
0.77 miles
|
Lumen Minneapolis 1
|
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
|
0.77 miles
|
Cloud Capital: Minneapolis CBD
|
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
|
0.77 miles
|
G42: Minneapolis
|
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
|
0.91 miles
|
Verizon: 250 Marquette
|
The site is a previous XO Communications facility
|
|
0.91 miles
|
Cogent: 250 Marquette
|
|
|
1.16 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
|
1.87 miles
|
Verizon: 1200 Washington
|
Former XO Communications site
|
|
5.24 miles
|
H5 Minneapolis
|
|
|
8.28 miles
|
US Signal: Saint Paul
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
8.37 miles
|
Databank Minneapolis Edina MSP1
|
|
|
8.37 miles
|
Consolidated Edina
|
|
|
9.33 miles
|
Lumen Minnetonka
|
|
|
9.72 miles
|
EdgeConnex Minneapolis
|
|
|
9.82 miles
|
Swervo: Eagan
|
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
|
9.82 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
9.93 miles
|
US Signal: MN01 Minneapolis
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
10.62 miles
|
DataBank Minneapolis Eagan MSP2
|
|
|
12.20 miles
|
Centra: Minneapolis
|
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
|
12.37 miles
|
Connect Data Centers: Eagan, MN
|
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
|
12.98 miles
|
QLevr: Inver Grove Heights
|
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|
|
13.56 miles
|
DataBank Brooklyn Park MSP3
|
|
|
14.68 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
14.85 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
16.72 miles
|
Centersquare: Minneapolis MP2
|
|
|
17.13 miles
|
Connect Data Centers: Apple Valley, MN
|
Following a year-long application process, Apple Valley city officials have rejected Oppidan and Rockport LLC’s proposal for a massive data center campus outside Minneapolis.
|
|
17.23 miles
|
Edged Energy: Minneapolis MSP01
|
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
|
17.23 miles
|
Edged Energy: MSP01 Expansion
|
|
|
18.21 miles
|
Prime ValleyInterested in this information?Contact us
|
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
|
|
18.67 miles
|
CentralInterested in this information?Contact us
|
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
|
|
18.81 miles
|
Flexential Minneapolis
|
|