0.21 miles
|
EdgeConnex Minneapolis
|
|
|
2.01 miles
|
Lumen Minnetonka
|
|
|
3.91 miles
|
Consolidated Edina
|
|
|
3.91 miles
|
Databank Minneapolis Edina MSP1
|
|
|
7.22 miles
|
Centersquare: Minneapolis MP2
|
|
|
9.37 miles
|
G42: Minneapolis
|
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
|
9.37 miles
|
Cloud Capital: Minneapolis CBD
|
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
|
9.49 miles
|
Lumen Minneapolis 1
|
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
|
9.56 miles
|
Flexential Minneapolis
|
|
|
9.90 miles
|
Cogent: 250 Marquette
|
|
|
9.92 miles
|
Cologix: Minnesota Technology Center
|
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
|
9.92 miles
|
Lumen Minneapolis 2
|
|
|
9.92 miles
|
DataBank Minneapolis MSP4
|
In 2020, DataBank acquired the facility from Zayo.
|
|
9.92 miles
|
Level3 Minneapolis (511 11th)
|
|
|
9.92 miles
|
Verizon: 250 Marquette
|
The site is a previous XO Communications facility
|
|
9.93 miles
|
511 Building - Minnesota Technology Center
|
|
|
10.06 miles
|
Verizon: 1200 Washington
|
Former XO Communications site
|
|
10.12 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
|
11.91 miles
|
Swervo: Eagan
|
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
|
11.92 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
12.07 miles
|
UnitedHealth Chaska
|
|
|
12.14 miles
|
US Bank Chaska (Stream DC2)
|
|
|
12.15 miles
|
CloudHQ: Chaska MN
|
The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.
|
|
12.21 miles
|
Lightedge: Minneapolis
|
|
|
12.22 miles
|
Stream Minneapolis
|
Stream Data Centers sold the facility as part of a corporate transaction where Apollo Global Management acquired a majority stake in the company.
|
|
13.10 miles
|
DataBank Minneapolis Eagan MSP2
|
|
|
14.33 miles
|
H5 Minneapolis
|
|
|
14.79 miles
|
Centra: Minneapolis
|
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
|
15.07 miles
|
Connect Data Centers: Apple Valley, MN
|
Following a year-long application process, Apple Valley city officials have rejected Oppidan and Rockport LLC’s proposal for a massive data center campus outside Minneapolis.
|
|
15.13 miles
|
Connect Data Centers: Eagan, MN
|
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
|
16.36 miles
|
US Signal: Saint Paul
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
16.78 miles
|
Edged Energy: Minneapolis MSP01
|
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
|
16.78 miles
|
Edged Energy: MSP01 Expansion
|
|
|
18.12 miles
|
QLevr: Inver Grove Heights
|
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|
|
18.50 miles
|
DataBank Brooklyn Park MSP3
|
|
|
19.17 miles
|
Tower AlphaInterested in this information?Contact us
|
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
|
|
19.37 miles
|
UltraInterested in this information?Contact us
|
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
|