Data Center Campus

Switch Las Vegas CORE Campus

11 sites Las Vegas
Operational
Fully operational facility
Operated by:

Campus at a Glance

11 data centers on this campus
First built in 2008
Total building size: 2,704,972 SqFt
Coordinates: 36.06021, -115.21125
░░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities. We have one additional data center under construction at The Core Campus, which we expect will be operational in 2018 and that will provide approximately 340,000 GSF of additional space and have up to 40 MW of 100% renewable power available to the facility.

Solar Power

Switch powers the campus through the Switch Solar project is located in Clark County, Nevada northeast of Las Vegas on approximately 1,600 acres of land managed by the US Bureau of Land Management (BLM) in the Dry Lake Solar Energy Zone (SEZ).

There are two solar generation projects, Switch Station 1 and Switch Station 2 which produce 179-megawatts of power. The plants were originally part of a joint project between First Solar and NV Energy. In June 2017, EDF Renewable Energy acquired the two solar projects from First Solar.

SUPERNAP NV-7

• 250 MVA Switch owned substation
• 146 MVA of generator capacity
• 84 MVA of UPS S+S supply
• 44,000 tons of S+S cooling
• 5,400,000 cubic feet per minute
• 30 modular cooling towers
• 100% heat aisle containment
• t-scif™ designed for 1,500 watts
• 7,000+ cabinets / 350 t-scifs™

SUPERNAP 8:

Launched in April 2013

LAS VEGAS 9:

Launched in 2016

LAS VEGAS 10:

Opened in 2017, the site uses a MOD 250 (Modularly Optimized Design). The site adds nearly 350,000 square feet and up to 40 megawatts (MW) of power

Cyxtera on the Switch Campus

Cyxtera has an agreement to sell space in the SuperNap and is located in LV8. Century Link PR

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Switch Edge 1 Switch
Operational
░░░ Request Dataset MW 28,000 SqFt 2017
Switch Las Vegas 10 Switch
Operational
░░░░ Request Dataset MW 343,436 SqFt —
Switch Las Vegas 11 Switch
Operational
░░░░ Request Dataset MW 381,881 SqFt —
Switch Las Vegas 12 Switch
Operational
░░░░ Request Dataset MW 60,352 SqFt 2015
Switch: Las Vegas 15 Switch
Operational
░░░░ Request Dataset MW 330,000 SqFt 2022
Switch Las Vegas 2 Switch
Operational
░░░ Request Dataset MW — —
Switch Las Vegas 5 Switch
Operational
░░░ Request Dataset MW 15,000 SqFt —
Switch Las Vegas 7 Switch
Operational
░░░░ Request Dataset MW 638,807 SqFt 2008
Switch Las Vegas 8 Switch
Operational
░░░░ Request Dataset MW 436,248 SqFt —
Switch Las Vegas 9 Switch
Operational
░░░░ Request Dataset MW 471,248 SqFt —
Switch Las Vegas CORE Campus Switch
Operational
— — —

Map and Nearby Locations

Switch Las Vegas CORE Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

News

Read Switch Expanding Las Vegas CORE Campus
Switch Expanding Las Vegas CORE Campus

Switch Expanding Las Vegas CORE Campus

June 25, 2019 Switch Las Vegas CORE Campus

Switch held a groundbreaking ceremony that included Governor Steve Sisolak and CEO Rob Roy. The company is expanding near it's existing CORE campus in Las Vegas. The expansion will add up to 1.1 million square feet and 115 megawatts of power capacity to the existing campus. Read More:...

Read more
Read Switch Core Campus Opens LAS VEGAS 10 Data Center (PR)
Switch Core Campus Opens LAS VEGAS 10 Data Center (PR)

Switch Core Campus Opens LAS VEGAS 10 Data Center (PR)

June 15, 2017 Switch Las Vegas 10

LAS VEGAS – Switch, the global technology solutions corporation that is powering the future of the connected world™, today announced the opening of its LAS VEGAS 10 data center, a Switch MOD 250 (Modularly Optimized Design), at Switch’s Core Campus. The Switch MOD 250 is designed, constructed and...

Read more
Read More News

Documents

Ready to Level up Your
Data Center Strategy?