NTT: Lancaster TX10 Expansion

Latest Podcast 201 Sunrise Rd
Land BankPlannedProspective Expansion
Future facility in planning stagefacility with additional land secured and prospective expansion planned
Operated by:

NTT: Lancaster TX10 Expansion

Site: NTT: TX11
Site planned for 2029 and has expansions through 2031
Utility Provider: Oncor

Map and Nearby Locations

201 Sunrise Rd
NTT Sites
Nearby Facilities

NTT: Lancaster TX10 Expansion Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT: Lancaster TX10 Expansion

Distance Site About
0.20 miles NTT: TX11
TX11 is the first planned building on NTT's Lancaster campus at Sunrise Road and Belt Line Road, a data center of about 225,000 sq ft on the 108.7-acre tract NTT bought in December 2025.
0.30 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.38 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.39 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.45 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.46 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.62 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.64 miles QTS: DFW2-DC1
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
0.76 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.80 miles QTS: DFW2-DC2
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
0.87 miles QTS: DFW2-DC3
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
0.92 miles QTS: DFW2-DC4
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
0.98 miles QTS: Greene Road Expansion
1.00 miles QTS: DFW2 Expansion
1.03 miles QTS: DFW2-DC7
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
1.12 miles QTS: DFW2-DC5
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
1.21 miles QTS: DFW2-DC6
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
1.23 miles QTS: Dallas III
1.40 miles QTS: Greene Road DC1
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
1.54 miles Stack: DFW02A
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
1.56 miles Stack: DFW02B
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
1.60 miles QTS: DFW3-DC2
1.60 miles Stack: DFW02C
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
1.65 miles Stack: DFW02D
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
1.67 miles Stack: DFW02E
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
1.70 miles QTS: DFW3-DC1
1.70 miles Stack: DFW02F
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
1.80 miles QTS: Dallas IV
1.89 miles Yondr: Lancaster Expansion
1.89 miles QTS: Dallas VI
2.10 miles Yondr: Lancaster 1
First planned building at Yondr's Lancaster campus, on the 29-acre west tract at 801 E. Belt Line Road. Yondr's concept plan shows a two-hall building of about 300,000 sq ft. Construction has not started.
2.68 miles QTS: Dallas V
3.59 miles Lincoln: Red Oak DFW2
Planned data center building DFW2 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. It is the campus's lead building, with an initial phase targeted for the first quarter of 2028.
3.67 miles Lincoln: Red Oak DFW3
Planned data center building DFW3 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
3.76 miles Skybox: PowerCampus Dallas
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
3.87 miles DataBank: DFW16
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
3.90 miles Lincoln: Red Oak DFW4
Planned data center building DFW4 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
3.93 miles DataBank: DFW12
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
3.94 miles DataBank: DFW11
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
4.06 miles DataBank: DFW15
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
4.09 miles DataBank: DFW10
DataBank is building a second data center at its upcoming Red Oak campus in Dallas, Texas.
4.10 miles DataBank: DFW14
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
4.11 miles DataBank: DFW9
DataBank is planning a $256 million data center project in Red Oak, Ellis County, Texas. The facility, named DFW9, will be located on Stainback Road and cover over 425,000 sq ft (40,000 sqm).
4.13 miles DataBank: DFW13
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
5.30 miles Cawley Partners: South Creek Ranch
The initial plans for this expansive property designate 2,000 acres in the northern section specifically for digital commerce parks, which will include data centers.
5.53 miles Compass: Red Oak X
5.62 miles Compass: Red Oak IX
5.88 miles Compass: Red Oak VIII
5.94 miles Compass: Red Oak VII
5.99 miles Compass: Red Oak VI
This Facility is part of Compass' Red Oak data center campus in Texas.
6.04 miles Core PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.30 miles Compass: Red Oak V
Compass Roadrunner Bldg 5 is located at its Red Oak campus. Building 5 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
6.35 miles Compass: Red Oak IV
Compass Roadrunner Bldg 4 is located at its Red Oak campus. Building 4 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
6.39 miles Compass: Red Oak III
Compass Roadrunner Bldg 3 is located at its Red Oak campus. Building 3 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
6.44 miles Compass: Red Oak II
Compass Roadrunner Bldg 2 is located at its Red Oak campus. Building 2 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
6.49 miles Compass: Red Oak I
Compass Roadrunner Building 1, also known as DFW III-II Building 1, is located at its Red Oak campus. The facility at 300 Houston School Road spans a 251,815 sq ft (23,395 sqm) data center space.
6.66 miles Compass Red Oak Campus
Located in south of the Metro, Compass’ second metro campus can expand to more than 155 acres and 262 MW of power.
9.12 miles Hub MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.77 miles Stream: Waxahachie DFWD
Stream Data Centers is planning a data center in Waxahachie, Texas.
13.96 miles DataBank Downtown Dallas DFW1
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
13.96 miles Sprocket DAL2
13.96 miles Cogent: 400 S Akard
13.96 miles Lumen Dallas 4
13.96 miles 400 S Akard - Digital Realty
The building is a eight story (7 stories with a basement) multi-tenant data center.
13.96 miles Opus Interactive Dallas
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
14.18 miles Lumen Dallas 3
14.18 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.18 miles Aphorio Carter: Dallas
The Dallas Data Center is a premier colocation facility located on a 7.61-acre campus in Dallas, Texas. Spanning 125,538 rentable square feet, the property is fully leased to a prominent, NYSE-listed global consumer internet company.
14.22 miles Sprocket DAL1
14.23 miles Provision Data Services
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
14.45 miles Earthlink Dallas
14.45 miles Equinix Dallas DA4
Equinix DA4 is a colocation suite at 2323 Bryan Street in downtown Dallas that LayerOne opened in 2000 and Equinix acquired with Switch and Data in 2010.
14.45 miles LOGIX Dallas (2323 Bryan)
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
14.45 miles Digital Realty: DFW10
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space. Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
14.52 miles DataCanopy Dallas
14.78 miles Colovore: Mesquite DFW01
Colovore's first Dallas-market facility, a purpose-built liquid-cooled colocation building in Mesquite, TX. Four-hall design following Colovore's standard high-density spec-build template, with service dates running 2028 into 2029.
15.84 miles Lumen Dallas 2
15.84 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
15.86 miles DataBank DFW5
15.86 miles Cologix: DAL1
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
15.87 miles Flexential Dallas Infomart I-V
15.90 miles Cologix: DAL2
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
15.90 miles Cologix: DAL3
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
15.90 miles Verizon Dallas (Infomart)
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
15.97 miles Equinix Dallas DA11
DA11 is Equinix's expansion next to the Infomart.
16.57 miles CleanArc: Dallas Campus
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
17.30 miles HostPapa DFW1
17.31 miles QuadraNet Dallas
17.31 miles Contegix Dallas
17.31 miles TierPoint Dallas (Colo4)
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
17.61 miles Lumen Dallas 1
18.13 miles Equinix: Dallas DA12
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
18.31 miles Verizon: 1300 W Mockingbird
Former XO facility
18.35 miles CoreSpace Dallas
18.63 miles DataBank DFW4 Empire Central
The site was acquired by Zayo in January 2016 from Stream Datacenters.
18.95 miles 8435 Stemmons - Digital Realty
19.27 miles Prometheus Hyperscale: Dallas 4
Prometheus Hyperscale’s fourth 50MW facility at its Kaufman County, Texas campus, completing a 200MW AI-focused development with on-site generation and battery storage, expected online in late 2028.
19.30 miles Lumen Dallas 6
19.32 miles Prometheus Hyperscale: Dallas 3
Prometheus Hyperscale’s third 50MW facility at its Kaufman County, Texas campus, part of a 200MW AI-focused development with on-site generation and battery storage, expected online in early 2028.
19.32 miles Prometheus Hyperscale: Dallas 1
Prometheus Hyperscale’s 200MW Dallas-area campus in Kaufman County, Texas, on a 500-acre site, featuring four liquid-cooled buildings powered by behind-the-meter gas generation and battery storage, with first capacity expected in 2026 and phased expansion beyond 2027.
19.32 miles Prometheus Hyperscale: Dallas 2
Prometheus Hyperscale’s second 50MW facility at its Kaufman County, Texas campus, part of a 200MW AI-focused development with on-site generation and battery storage, expected online in Q2 or Q3 2027.
19.37 miles DataBank DFW6 Love Field
19.71 miles Prime: DFW01-01
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
19.71 miles Fiberhub DFW1
19.73 miles Evocative DA4
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
19.75 miles Prime: DFW01-02
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
19.83 miles Edged Energy: DFW01-1
In January 2025, Edged Energy launched its data center in Irving, Texas..
19.84 miles Flexential: Talty, Texas
Flexential has acquired 110 acres in Talty (Kaufman County), Texas, to build its fourth and largest Dallas–Fort Worth data center campus.
19.91 miles Edged Energy: DFW01-2
This facility will be a part of Edged Energy's Dallas Campus in Texas.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?