Rackspace Kansas City MC1

Latest Podcast
10828 North Airworld Dr
Operational
Fully operational facility
Operated by:

Rackspace Kansas City MC1

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size
  • Raised Flooring: 15,256 sq ft
  • 2.5 MW Total Utility Power
  • Manned 24x7x365
  • Biometric Scanners
  • Video Surveillance
  • Alarm System
  • Key Card Access Required
  • Laser Based Smoke Detection

Map and Nearby Locations:

10828 North Airworld Dr
Rackspace Sites
Nearby Facilities

Sites within 15 miles of Rackspace Kansas City MC1

Distance Site About
0.38 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
0.58 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
4.20 miles Real Estate Data Center Request Dataset
Port KC has officially announced the planning and development of a massive $100 billion data center campus in the Northland area, a project internally known as Project Kestrel.
4.41 miles Real Estate Data Center Request Dataset
4.68 miles Hyperscale Data Center Request Dataset
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
4.75 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
4.87 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
5.56 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
5.67 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
5.70 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
5.91 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
5.94 miles Hyperscale Data Center Request Dataset
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
11.78 miles NOCIX
11.83 miles Nocix 2 (1530 Swift)
12.50 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
13.09 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q4 2027.
13.35 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
13.54 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
13.72 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
13.93 miles Hyperscale Data Center Request Dataset
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
14.03 miles Lumen Kansas City 1
14.04 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
14.04 miles Lumen Kansas City 4
14.06 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
14.47 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
14.47 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
14.48 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
14.55 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
14.61 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
14.96 miles Lumen Kansas City 3
14.98 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
15.36 miles Red Wolf DCD: Kansas Expansion
15.46 miles Red Wolf DCD: Kansas City, KS
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.

Rackspace Kansas City MC1 Data Center Photos (See all)

Exterior of Rackspace's Facility Near the MCI Airport
Source: Google Maps
The Rackspace Facility in KC was Previously a LayeredTech Site
Source: Google Maps

Operating Company

Operated by:

Rackspace began operations in December 1998 to provide managed web hosting services to small and medium business. Today, Rackspace serves over 300,000 customers in thirteen data centers worldwide.

20
Facilities
1
Markets
97MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?