TierPoint Kansas City

Latest Podcast 10801 N. Amity Avenue
Operational
Fully operational facility
Operated by:

TierPoint Kansas City

Short Code: KCDC
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The site was acquired when TierPoint bought Cosentury in January 2016.

Building:


  • Reinforced concrete block and brick construction
  • Single-story, single-tenant, single-use structure
  • Outside of 500-year flood plain
  • Dedicated spaces for data halls, carrier entrance, electrical room, storage, receiving area and full-sized loading docks
  • 24/7 onsite staff and remote monitoring from geographically disperse Operations Centers
  • 450 seat Workgroup Services/Call Center area
  • Guest office, conference room and break room areas

Power:


  • 6kW per cabinet capacity
  • Newly upgraded 2MVA utility power feed
  • 1MW diesel generator for all critical loads
  • 2N UPS with redundant battery strings
  • Redundant (A+B) power distribution system available to each cabinet
  • Power metering and utilization reporting by circuit, cabinet and room

HVAC:


  • N+1 continuous precision cooling systems
  • Close-coupled cooling units to support high-density cabinets
  • Hot/cold aisle alignment with containment options available
  • Raised access floor for cold air supply
  • Ceiling plenum for ducted hot air return
  • Set points maintain ASHRAE standards for data centers
  • CRAC system and environmental monitoring for temperature, humidity, dew point, airflow, smoke and leaks

Map and Nearby Locations

10801 N. Amity Avenue
TierPoint Sites
Nearby Facilities

Sites within 15 miles of TierPoint Kansas City

Distance Site About
0.58 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
0.78 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
3.85 miles CenterInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
3.94 miles Valley TwoInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
4.04 miles ValleyInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
4.29 miles Hub ProInterested in this information?Contact us
Project Kestrel, a major new data center development, is officially taking flight in Kansas City, Missouri, following the acquisition of 430 acres of land near the Kansas City International Airport by Google affiliate Shenandoah Computing LLC.
4.33 miles PlazaInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
4.47 miles North StationInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
5.22 miles Metro ValleyInterested in this information?Contact us
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
5.29 miles BetaInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
5.40 miles Ridge PlusInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
6.13 miles AlphaInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
6.22 miles TowerInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
6.27 miles Point GammaInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
6.48 miles Ridge ThreeInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
6.50 miles AlphaInterested in this information?Contact us
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
11.99 miles NOCIX
12.05 miles Nocix 2 (1530 Swift)
13.59 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
13.66 miles Metrobloks: MCI-A2
This facility is part of the Metrobloks Kansas City campus in Missouri.
13.76 miles Metrobloks: MCI-A3
This facility is part of the Metrobloks Kansas City campus in Missouri.
13.80 miles North ValleyInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
14.00 miles Campus BetaInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
14.18 miles PointInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
14.20 miles Lumen Kansas City 1
14.20 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
14.21 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
14.21 miles Lumen Kansas City 4
14.23 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
14.37 miles Campus BetaInterested in this information?Contact us
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
14.63 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
14.63 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
14.65 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
14.74 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
14.91 miles Red Wolf DCD: Kansas Expansion
15.02 miles Red Wolf DCD: Kansas City, KS
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
15.03 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
15.14 miles Lumen Kansas City 3
15.42 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.

TierPoint Kansas City Data Center Photos See all

Tierpoint facility on 10801 N. Amity Ave
Source: Baxtel
Satellite View of KCM data center
Source: Google Maps

Operating Company

Operated by:

TierPoint is a data center and managed services provider that focuses on secondary markets in the United States. Operating as a private-equity backed company, As detailed in the history section below, Tierpoint has actively acquired smaller providers and impressively rolled up a national platform in 20 markets.

Tierpoint Acquisitions and History


TierPoint was formed in 2010 as Cequel Data Centers LLC, however, the company's origins date back to 1995. Through a conglomeration of acquisitions, TierPoint built its data center portfolio. [r1]

2010:

  • Cequel acquired Colo4 (Based in Dallas and originally founded in 2000)

2011

  • Cequel acquired Perimeter Technology (Based in Oklahoma and founded in 2003)

2012

  • Cequel acquired TierPoint (Based in Spokane and founded in 2003). After the acquisition, Cequel was rebranded as Tierpoint
  • 2012 Adhost acquired (Based in Seattle and founded in 1995)
  • 2012 DBSi acquired [r2]

2013

  • Baltimore Technology Park acquired (Based in Baltimore and founded in 2005)

2014

  • TierPoint Management team recapitalized the company
  • Philadelphia Technology Park. Located in the Philadelphia Navy Yard the 25,700 sqft Philadelphia Technology Park first opened in 2010
  • Xand (founded in 1999)

2015

  • Acquired CxP Data Centers that added a 121,000sqft Jacksonville facility [r3]
  • TierPoint Acquires AlteredScale Data Center in Chicago
  • Acquired Windstream for $575 million. The transaction added 20 datacenters, mainly in the East, Midwest, and South, which fit nicely with TierPoint's western-leaning portfolio. Windstream was itself a data center roll-up of sorts. In 2010 Windstream acquired PAETEC and Hosted Solutions in 2010.

2016

  • Cosentury was acquired by Tierpoint in January 2016 for $575 million. Cosentury, was founded in 2001 and was headquartered in Omaha, NE. It provided Colocation, IaaS, and Compliance and Security services. Cosentury was a large company to swallow. It had nine data centers in the Midwest US and 220 emploiyees.

Tierpoint Services

Data center colocation is the prime product, but Tierpoint also offers Cloud, Managed Services, and DIA with DDoS protection.

TierPoint's customer portal allows for self-provisioning of resources (such as VMs and storage) and a dashboard that allows customers to remotely monitor workloads and applications across all locations. The company offers a comprehensive solution portfolio of private, multitenant, hyperscale, and hybrid cloud, plus colocation, disaster recovery, security and other managed IT services.

References:


r1. TierPoint Company Page
r2. Source: Data Center Knowledge
r3. Press Release Archive. July 27, 2015

44
Facilities
23
Markets
129MW
Megawatts

News See all

Read Apollo Global Management is acquiring Argo Infrastructure Partners.
Apollo Global Management is acquiring Argo Infrastructure Partners.

Apollo Global Management is acquiring Argo Infrastructure Partners.

January 20, 2025 TierPoint

Investment giant Apollo Global Management is acquiring Argo Infrastructure Partners in a deal that will add approximately $6 billion of assets to the Apollo infrastructure platform. Argo is the majority owner of US data center firm TierPoint, which operates around 40 facilities across 18 US...

Read more
Read TierPoint aims to raise $925 million through securitized loans
TierPoint aims to raise $925 million through securitized loans

TierPoint aims to raise $925 million through securitized loans

June 29, 2023 TierPoint

TierPoint seeks to raise $925 million by selling A-rated data center revenue notes from Kroll Bond Rating Agency. The exchange is TierPoint's first and is backed by 31 colocation data centers with approximately $397.2 million in annualized monthly frequent revenue and $198.3 million in yearly...

Read more
Read TierPoint announces completion of new data center in St. Louis, Missouri
TierPoint announces completion of new data center in St. Louis, Missouri

TierPoint announces completion of new data center in St. Louis, Missouri

August 05, 2022 TierPoint

TierPoint has announced that its St. Louis data center in Missouri, which was announced back in September 2021, is complete. The facility, spanning 23,000 sqft (2,100 sqm), is a Tier III-quality facility that offers 14,500 sq ft (1,350 sqm) of production or raised floor space. The facility saw an...

Read more
Read Diode Ventures Planning a 220MW Facility in Kansas
Diode Ventures Planning a 220MW Facility in Kansas

Diode Ventures Planning a 220MW Facility in Kansas

April 26, 2022 Kansas City

Diode Ventures is looking to develop a massive data center campus in Kansas. The company filed a preliminary plan for a data center campus called Creek Technology Park. The campus will sit on an undeveloped 359 acres of land in the northeast of US Highway 169 and Interstate 435 in Missouri....

Read more
Read Argo Infrastructure Partners Invests $500m in TierPoint
Argo Infrastructure Partners Invests $500m in TierPoint

Argo Infrastructure Partners Invests $500m in TierPoint

March 02, 2022 TierPoint

TierPoint has announced that Argo Infrastructure Partners has invested $500 million into its business. The move sees Argo Infrastructure Partners become the largest single equity investor in the firm. TierPoint will use the net proceeds from the transaction to expand the company and provide...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?