The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border). It serves as one of Intercity’s strategic hubs, providing geographical diversity for businesses needing proximity to London without being in the city center.
| Distance | Site | About |
|---|---|---|
| 2.85 miles | Ark: Elstree Expansion | |
| 2.89 miles | Ark: Elstree Campus |
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
|
| 3.62 miles | Equinix: Hertfordshire Expansion | |
| 3.64 miles | Equinix: Hertfordshire Campus (DC01UK) |
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
| 6.08 miles | Pure DC: Brent Cross |
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
|
| 6.29 miles | iomart: DC12 North London |
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
|
| 6.35 miles | CapitaLand: Chess Building |
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
|
| 6.36 miles | Lunar 5 |
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
|
| 6.95 miles | Abbots Langley Data Centre |
|
| 8.01 miles | Segro Pure Premier Park |
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
| 8.28 miles | Options West London | |
| 8.33 miles | Barclays Data Centre | |
| 8.33 miles | Kao Data: Northolt |
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
|
| 8.38 miles | Computacenter: Hertfordshire | |
| 8.41 miles | Vantage London II |
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
| 8.48 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
| 8.58 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
| 8.62 miles | Equinix London LD3 | |
| 8.67 miles | Coreix Enfield | |
| 8.73 miles | Hyperscale Data Center Request Dataset |
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
| 8.80 miles | Vantage London I Campus |
Vantage's LHR-1 data center spans 430,000 sq ft (40,000 sqm) across two multi-story data centers.
|
| 8.82 miles | Ark: Alliance Park |
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
| 9.63 miles | VIRTUS London1 Enfield |
|
| 9.63 miles | Wavenet: Enfield |
Wavenet’s Enfield facility is not a stand-alone data centre – it is “Data Hall 4” inside the Virtus LONDON1 campus.
|
| 9.65 miles | Hyperscale Data Center Request Dataset | |
| 9.66 miles | NTT Hempstead4 |
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
|
| 9.69 miles | Hyperscale Data Center Request Dataset | |
| 9.82 miles | Redwire: London |
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
|
| 9.98 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services UK Limited has filed plans to develop a new tape library data center at Plot 3, Maylands Avenue, Hemel Hempstead, Hertfordshire (HP2 4FQ), outside London. The project covers a 0.6-hectare (1.48-acre) site and involves construction of a two-story, 1,935 sqm (20,840 sq ft) facility. The application was validated in February 2026 and is currently in the planning stage.
|
| 10.03 miles | NTT Hempstead 3 |
|
| 10.07 miles | NTT Hempstead 1 |
|
| 10.09 miles | Northtree: Hemel Hempstead |
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
|
| 10.26 miles | Visa United Kingdom | |
| 10.32 miles | Verizon London UK5 | |
| 10.33 miles | Hyperscale Data Center Request Dataset |
As part of a £5 billion two-year commitment to the UK, Google has opened a new data centre in Waltham Cross, Hertfordshire.
|
| 10.34 miles | NTT Hempstead 2 |
|
| 10.50 miles | Ark: Meridian Park | |
| 10.51 miles | ServerChoice: London |
|
| 10.89 miles | Colt: London 8 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 10.89 miles | INAP North London |
INAP's North London data center is located within Colt's facility on Black Fan Road
|
| 10.89 miles | Colt London North: Welwyn Garden City |
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
| 10.97 miles | Colt: London 7 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 11.02 miles | Vision247: London |
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
| 11.05 miles | Colt: London 6 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 11.11 miles | Colt: London Hayes LON4 |
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
| 11.12 miles | Colt: London 5 |
This facility is a part of Colt's London Hayes Campus in West London.
|
| 11.36 miles | CapitaLand: Welwyn Garden City |
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
|
| 11.37 miles | Zenium London One |
|
| 11.44 miles | Lumen: Goswell Rd |
|
| 11.57 miles | Stellanor: London North |
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
| 11.84 miles | Marvel: Hayes |
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
|
| 11.86 miles | Verne: London EC1 |
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
| 11.86 miles | Hyperscale Data Center Request Dataset |
Located in the Silverdale Industrial Estate, this new West London facility is a specialized two-story data center dedicated to AWS tape storage.
|
| 11.91 miles | Ark: Union Park |
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
| 12.07 miles | aptum London | |
| 12.07 miles | Carrier-Neutral Data Center Request Dataset | |
| 12.07 miles | NTT: London LON2 |
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
|
| 12.17 miles | VIRTUS Hayes London2 |
|
| 12.21 miles | 1 Olivers Yard - Digital Realty |
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
| 12.23 miles | Lumen: 10 Fleet Pl | |
| 12.25 miles | Epsilon London Telephone House | |
| 12.33 miles | Rackspace: LON8 |
|
| 12.35 miles | iomart DC2 London |
|
| 12.36 miles | Sequence: Iver, Buckinghamshire |
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
| 12.37 miles | West London Tech Park |
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
| 12.39 miles | Stellanor: London City |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 12.40 miles | VIRTUS: London 6 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
| 12.41 miles | West London Tech Bldg2 |
This facility is part of Greystoke's West London Tech Park.
|
| 12.42 miles | Telehouse London Metro |
|
| 12.44 miles | Colt House London | |
| 12.45 miles | CyrusOne: LON6 Bldg6 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.46 miles | VIRTUS: London 7 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
| 12.46 miles | VIRTUS Stockley Park Campus |
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
| 12.47 miles | CyrusOne: LON6 Bldg5 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.48 miles | VIRTUS: London 14 |
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
|
| 12.49 miles | CyrusOne: LON6 Bldg4 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.51 miles | CyrusOne: LON6 Bldg3 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.53 miles | VIRTUS: London 8 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
| 12.54 miles | CyrusOne: LON6 Bldg2 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.56 miles | CyrusOne: London LON6 |
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
| 12.65 miles | CyrusOne London II (Stockley Park) |
The London II datacenter was originally built by Infinity SDC.
|
| 12.78 miles | Internap London | |
| 12.79 miles | Digital Realty: LON1 LON3 |
|
| 12.79 miles | Six Degrees: London (Interxion LON3) | |
| 12.81 miles | Digital Realty: LON2 | |
| 13.15 miles | Pinewood: Slough Campus |
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
|
| 13.15 miles | Stellanor: London East |
It was originally a Lumen (formerly Level 3) data center.
|
| 13.23 miles | Infinity SDC HereEast |
|
| 13.47 miles | Thorney: Iver DC-A |
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 13.51 miles | CorScale: Court Lane, Iver |
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
|
| 13.67 miles | Link Park Heathrow Data Center |
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
| 13.78 miles | Stellanor: Hounslow |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 13.84 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
|
| 13.86 miles | AtlasEdge: London LCY001 |
|
| 13.86 miles | LeaseWeb: London LON-12 |
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
|
| 13.95 miles | Exa: Hoddesdon |
|
| 14.06 miles | Thorney: Iver DC-C |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 14.06 miles | Netwise London Central |
Netwise has officially closed its "London Central" data center facility, which was a key part of their operations in London; the closure happened in June 2024,
|
| 14.11 miles | Thorney: Iver DC-B |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 14.15 miles | Thorney Lane LLP: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 14.17 miles | DRT London (West Drayton) |
|
| 14.17 miles | Segro: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 14.25 miles | Thorney: Iver DC-F |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 14.29 miles | Thorney: Iver DC-E |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 14.33 miles | Thorney: Iver DC-D |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 14.44 miles | Verizon London UK4 | |
| 14.79 miles | Coreix Docklands | |
| 14.93 miles | Nscale: Loughton, Essex |
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
| 15.13 miles | Netwise London East (NLE) |
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
| 15.23 miles | Echelon LCY20 |
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
|
| 15.28 miles | nLighten: London Citi |
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
| 15.35 miles | Lumen London 3 (E India Dock) | |
| 15.37 miles | Global Switch: London North |
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
| 15.40 miles | Global Switch: London South |
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
| 15.40 miles | Kao Data: Bidder Street, Newham |
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
|
| 15.41 miles | AIMES DC3 Mastmaker Road | |
| 15.43 miles | GTT London GS2 |
|
| 15.44 miles | IP House: London |
|
| 15.44 miles | Telehouse London Docklands (North, East, West) |
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
| 15.45 miles | Verizon London THW | |
| 15.45 miles | Global Switch: London East |
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
| 15.60 miles | DRT London (Bonnington House) |
|
| 15.63 miles | Telehouse South |
Telehouse is expanding its Telehouse South facility in London, UK.
|
| 15.65 miles | Digital Meridian Gate (215 Marsh) |
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
| 15.66 miles | TeliaSonera HEX/A | |
| 15.67 miles | Digital Docklands: Cloud House | |
| 15.69 miles | Wavenet: Harbour Exchange | |
| 15.69 miles | Equinix London LD8 Harbour Exchange (Docklands) |
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
| 15.70 miles | Echelon LCY10 |
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
| 15.72 miles | Centersquare: Docklands LHR2 |
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
|
| 15.72 miles | Keppel GV7 London |
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
| 15.73 miles | Fibroptic: City Reach, Docklands |
Since its opening in 2011, this Tier 2 data centre has provided secure, high-performance colocation at City Reach, Isle of Dogs.
|
| 15.73 miles | Digital Sovereign House (227 Marsh Wall) |
|
| 15.73 miles | DDCL: London |
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
|
| 15.74 miles | City Reach London Docklands |
|
| 16.01 miles | Tritax: London Slough (Phase 2) |
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
| 16.03 miles | Yondr: Slough 3 |
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
|
| 16.06 miles | Tritax: London Slough (Phase 1) |
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
| 16.09 miles | Yondr: Slough 2 |
This facility is part of Yondr's London Slough Campus.
|
| 16.14 miles | ServerFarm London |
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
| 16.16 miles | DataBank: London Heathrow |
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
| 16.16 miles | Yondr: Slough Campus |
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
| 16.23 miles | Equinix: Wexham Road |
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
| 16.40 miles | Thrive Luton |
The site was formerly operated by ONI before being acquired in August 2021.
|
| 16.45 miles | ADA: LCY02 |
This building is the second facility in Ada Infrastructure's Docklands campus, East London.
|
| 16.45 miles | ADA: East London Docklands |
The project's first phase includes a 64,245-square-meter (691,530 sq ft) data center building (LCY01) with a substation.
|
| 16.56 miles | ServerChoice: Stevenage |
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
|
| 16.58 miles | ADA: LCY03 |
This building is the third facility in Ada Infrastructure's Docklands campus, East London.
|
| 16.72 miles | Gravity Edge: London LDN2 | |
| 17.09 miles | Lumen Slough |
|
| 17.10 miles | Nigsun: Stevenage NCS1 |
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
|
| 17.23 miles | NTT Slough 2 |
|
| 17.23 miles | CyrusOne London I |
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
| 17.23 miles | Rackspace London Slough (LON3) |
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
| 17.25 miles | NTT Slough 3 |
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
| 17.25 miles | VIRTUS Slough London 3 and 4 |
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
| 17.25 miles | GoDaddy Slough (HEG) | |
| 17.27 miles | VIRTUS LONDON10 | |
| 17.27 miles | Iron Mountain: LON3 |
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
| 17.28 miles | VIRTUS LONDON9 | |
| 17.29 miles | Logicalis Slough | |
| 17.31 miles | Iron Mountain London LON-2 | |
| 17.32 miles | CyrusOne London III |
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
| 17.32 miles | Kao Data Slough |
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
| 17.33 miles | Equinix LD13x | |
| 17.33 miles | GTR: Slough |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 17.34 miles | Digital Realty: LHR26 |
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
|
| 17.35 miles | GTR: Slough 2 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 17.35 miles | Equinix Slough Campus LD4, LD5, LD6, LD10 |
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
| 17.36 miles | Six Degrees: Anchorage Point |
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
|
| 17.36 miles | Equinix LD10 |
|
| 17.36 miles | Digital Realty: LHR27 |
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
|
| 17.36 miles | GTR: Slough 3 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 17.42 miles | Segro: London Slough Campus |
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
|
| 17.46 miles | Fujitsu: London North STE04 |
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
|
| 17.49 miles | Segro: Slough 2 |
This planned facility will be part of Segro's London Slough Campus.
|
| 17.51 miles | VIRTUS London 11 | |
| 17.52 miles | Equinix LD5 |
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
| 17.53 miles | Iron Mountain London LON-1 |
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
| 17.54 miles | Equinix LD12 | |
| 17.54 miles | Equinix LD14 | |
| 17.59 miles | Equinix LD7 |
|
| 17.60 miles | China Mobile Slough | |
| 17.66 miles | CyrusOne LON5 | |
| 17.66 miles | Equinix LD6 | |
| 17.74 miles | Equinix LD4 |
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
| 17.76 miles | Virgin Media O2 Slough |
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
| 17.81 miles | Equinix LD11x | |
| 18.97 miles | QuickHostUK: High Wycombe |
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
| 19.24 miles | ServerChoice: Harlow |
|
| 19.25 miles | Kao Data: Harlow KLON-01 |
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
| 19.28 miles | Kao Data: KLON-02 |
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.34 miles | Kao Data: KLON-03 |
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.34 miles | Hyperscale Data Center Request Dataset |
Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.
|
| 19.36 miles | Kao Data: KLON-04 |
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.38 miles | Kao Data: KLON-08 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.38 miles | Kao Data: KLON-07 |
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
| 19.58 miles | CapitaLand: Croydon |
Croydon is a two-storey colocation data centre located 19 km south of Central London on the Prologis industrial estate.
|
| 19.63 miles | DRT London (Croydon) | |
| 19.69 miles | Digital Realty: London (Chessington) LHR13 |
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
| 19.76 miles | Green Mountain: London East |
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
| 19.78 miles | Infinity Romford North and South |
|
| 19.84 miles | Green Mountain: London East Bldg 2 |
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas