Clearstone Energy: Junction Campus

Latest Podcast 15 Cosgrove Way
Planned
Future facility in planning stage
Operated by:

Clearstone Energy: Junction Campus

Site planned for 2030 and has expansions through 2034
Lot Size: 37 acres

Clearstone Data is developing the Junction DC campus, a high-capacity facility set on 37 acres adjacent to the M1 motorway near Luton.

Positioned near the established Hemel Hempstead availability zone, the project has secured outline planning permission and aims to support the UK's growing demand for AI and cloud infrastructure by 2030, pending a confirmed National Grid connection date. Designed for a 40-year lifespan, the development is expected to generate approximately 1,400 construction jobs and 600 permanent operational roles, adding an estimated £190 million in GVA to the local economy.

Map and Nearby Locations

15 Cosgrove Way
Clearstone Energy Sites
Nearby Facilities

Clearstone Energy: Junction Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Clearstone Energy: Junction Campus

Distance Site About
2.58 miles Hyperscale Data Center Request Dataset
Amazon is planning a two-building campus at Linmere Island, near Houghton Regis, northwest of Luton.
2.58 miles Thrive Luton
The site was formerly operated by ONI before being acquired in August 2021.
8.53 miles NTT Hempstead 2
8.66 miles NTT Hempstead 1
8.77 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
8.77 miles NTT Hempstead 3
8.90 miles Hyperscale Data Center Request Dataset
Amazon Data Services UK Limited has filed plans to develop a new tape library data center at Plot 3, Maylands Avenue, Hemel Hempstead, Hertfordshire (HP2 4FQ), outside London. The project covers a 0.6-hectare (1.48-acre) site and involves construction of a two-story, 1,935 sqm (20,840 sq ft) facility. The application was validated in February 2026 and is currently in the planning stage.
9.07 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
9.08 miles Hyperscale Data Center Request Dataset
9.20 miles Hyperscale Data Center Request Dataset
10.58 miles Fujitsu: London North STE04
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
11.05 miles Nigsun: Stevenage NCS1
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
11.06 miles ServerChoice: Stevenage
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
11.11 miles Reef Origin: Elevate Quarter Campus
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
11.17 miles Reef Origin: Elevate Quarter 2
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
12.27 miles Abbots Langley Data Centre
12.30 miles Computacenter: Hertfordshire
12.84 miles ServerChoice: London
13.08 miles CapitaLand: Welwyn Garden City
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
13.41 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
13.41 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
13.64 miles Echelon LCY20
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
15.11 miles Creslow Park
Creslow Park is a data center located in a rural area of Buckinghamshire, United Kingdom.
16.61 miles Service Express: Bedford
The facility originally belonged to Blue Chip Customer Engineering Ltd, a UK-based specialist in IBM systems and managed services.
16.72 miles Ark: Elstree Campus
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
16.74 miles Ark: Elstree Expansion
16.74 miles Colocker: Milton Keynes
16.91 miles CapitaLand: Chess Building
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
16.98 miles Lunar 5
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
16.98 miles Pulsant Milton Keynes
17.09 miles Level3 Milton Keynes
17.12 miles Safenames: Milton Keynes
17.23 miles Equinix: Hertfordshire Expansion
17.30 miles Equinix: Hertfordshire Campus (DC01UK)
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
17.96 miles Intercity: Elstree
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
18.14 miles Manton Park Data Center
Located on Manton Lane in Bedford, the Manton Park Data Center is a 27,294-square-foot facility acquired by Meadow Partners in early 2024 as a strategic "off-market" investment.
18.49 miles nLighten: Milton Keynes
nLighten LTN1 (Milton Keynes) was integrated into the nLighten portfolio in September 2023 through the acquisition of Proximity Data Centres.

Clearstone Energy: Junction Campus Data Center Photos See all

Operating Company

Operated by:

Clearstone Energy is pioneering the development of large-scale solar farms and battery energy storage projects across the UK. Strategically located and scaled to maximize impact, the company's sites are designed to modernize the nation's electricity network while supporting the transition to low-carbon energy, transportation, and heating. Central to Clearstone’s development philosophy is an emphasis on people—collaborating closely with farmers, landowners, and local communities—and the enhancement of natural ecosystems to deliver clean, reliable electricity for the entire country.

3
Facilities
1
Markets

News See all

Read Mayor of London Commits to Joint Effort on Data Center Growth Challenges
London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A re...

Mayor of London Commits to Joint Effort on Data Center Growth Challenges

June 17, 2026 London

London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A report commissioned by the Greater London Authority and prepared by Buro Happold found that while...

Read more
Read Viasat launches new headquarters in London
Viasat launches new headquarters in London

Viasat launches new headquarters in London

April 15, 2024 London

Satellite firm Viasat last week officially launched its new office, at 50 Finsbury Square in London, as the combined offices of both Viasat and Inmarsat, the rival vendor it acquired last year. The new 121,000 square feet site includes new satellite, network, and cyber operations centers for the...

Read more
Read Oriole Networks raises £10 million in seed funding
Oriole Networks raises £10 million in seed funding

Oriole Networks raises £10 million in seed funding

March 29, 2024 London

University College London (UCL) spinout Oriole Networks has raised £10 million ($12.6m) in a seed funding round co-led by UCL Technology Fund, Clean Growth Fund, XTX Ventures, and Dorilton Ventures, with support from Innovate UK Investor Partnership. “As the demand for compute continues to...

Read more
Read Segro to develop new data centers after £900 million share issue
Segro to develop new data centers after £900 million share issue

Segro to develop new data centers after £900 million share issue

February 29, 2024 London

Property investor Segro has raised £900 million ($1.1 billion) in a share issue and intends to use this funds to develop its portfolio across the UK and Europe. The London-listed business had initially been hoping to raise £800 million ($1.01bn), but on Tuesday evening its directors said strong...

Read more
Read Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners
Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners

Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners

January 10, 2024 London

Investment firm Swiss Life Asset Managers this week entered an agreement with London-based InfraBridge, an infrastructure investment management division of DigitalBridge Group, to acquire a co-controlling equity stake in Telecom Infrastructure Partners (TIP). Gianfranco Saladino, head of...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?