Year Built: 2009
PUE: 1.29
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The data centre in Hoddesdon, just north of the M25, was launched by Vtesse in 2009. It has about 20,000 sq ft of technical space in roughly 14 suites.

Ownership timeline

  • October 2014: Interoute acquired Vtesse.
  • February 2018: GTT acquired Interoute.
  • September 2021: GTT sold its infrastructure business to I Squared Capital, which formed EXA Infrastructure.
  • April 2024: nLighten bought seven edge data centres from EXA, including Hoddesdon, now London STN1.

nLighten gives 2,100 square metres and 3.6 MW of end-state site capacity, with a design PUE of 1.29.

Map and Nearby Locations

Unit A1-A2, Geddings Road
nLighten Sites
Nearby Facilities

nLighten: London STN1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of nLighten: London STN1

Distance Site About
4.84 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.68 miles ServerChoice: Harlow
5.69 miles Kyndryl: Harlow
5.70 miles Kao Data: KLON-01
KLON-01 is the first of Kao Data's buildings on its Harlow campus: a three-storey, OCP Ready colocation facility with four technology suites, indirect evaporative cooling and HVO-fuelled backup generators.
5.70 miles Kao Data: KLON-02
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
5.76 miles Kao Data: KLON-04
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
5.77 miles Kao Data: KLON-03
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
5.78 miles Nebius: Harlow
Nebius leases 22 MW of IT capacity at Kao Data's Harlow campus under a 10-year deal signed in June 2026, spanning KLON-02 and the liquid-cooled KLON-03.
5.83 miles Kao Data: KLON-07
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
5.85 miles Kao Data: KLON-08
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
7.49 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.80 miles VIRTUS London1 Enfield
VIRTUS LONDON1 in Enfield, north London, was the first data centre VIRTUS opened, in March 2011. It sits on the Trade City estate off Crown Road and also houses colocation suites run by partner providers.
7.81 miles BE: Virtus Enfield
7.81 miles Wavenet: Enfield
Wavenet Enfield is Wavenet's colocation suite in Data Hall 4 of the VIRTUS LONDON1 data centre on Crown Road, Enfield, north London.
8.19 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
8.19 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
8.49 miles CapitaLand: Welwyn Garden City
CapitaLand Ascendas REIT has planning permission to replace the former HSBC Hertfordshire data centre in Welwyn Garden City with a new data centre of up to 28,830 square metres, and is seeking a tenant before it builds.
8.84 miles ServerChoice: SC-2 Welwyn Garden City
ServerChoice's SC-2 is a colocation suite at BioPark on Broadwater Road, Welwyn Garden City, open since 2012.
8.89 miles Nscale: Loughton, Essex
Nscale plans an AI data centre on Langston Road, Loughton, with 50 MW of AI capacity. Microsoft withdrew as anchor tenant in October 2026 after the grid connection slipped into the 2030s.
9.86 miles Ark: Meridian Park
10.39 miles Equinix: Hertfordshire Campus (DC01UK)
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
10.42 miles Equinix: Hertfordshire Expansion
10.44 miles Computacenter: Hertfordshire
12.19 miles Reef Origin: Elevate Quarter 2
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
12.28 miles Reef Origin: Elevate Quarter 1
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
12.38 miles ServerChoice: Stevenage
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
12.80 miles Nigsun: Stevenage NCS1
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
13.48 miles Fujitsu: London North STE04
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
13.95 miles Intercity: Elstree
Intercity Technology's Elstree hosting centre is at Regent House, Allum Gate, Borehamwood, inherited from Imerja.
14.03 miles Green Mountain: London East Bldg1
Green Mountain's LON1-East data centre in Romford, formerly Infinity SDC, completed a 14 MW expansion inside the existing building in September 2026.
14.13 miles Green Mountain: London East Bldg2
Green Mountain holds planning permission for a second London East building at 5 King George Close, Romford, with eight 2 MW data halls.
14.72 miles Infinity SDC HereEast
Infinity SDC planned a large data center inside Here East, the former Olympic broadcast centre on the Queen Elizabeth Olympic Park. Infinity sold the space to the V&A in 2018 before the data center was completed, and it now forms part of V&A East.
16.06 miles Clearstone Energy: East London Campus
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
16.36 miles Ark: Elstree Expansion
Ark Data Centres plans three further data centre buildings at its Elstree campus in Hertsmere, part of a four-building, 168 MW scheme.
16.38 miles Ark: Elstree Campus
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
16.47 miles Verizon London UK5
16.48 miles iomart: DC12 North London
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
16.51 miles Pure DC: Brent Cross 1
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
16.52 miles Stellanor: London North Goswell Road
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
16.56 miles Pure DC: Brent Cross 2
Pure DC is constructing the second data center building at its Brent Cross campus in North London, with completion scheduled for Q2 2029.
16.57 miles NTT London 1 (Dagenham)
NTT London 1 is a data center campus on Yew Tree Avenue in Dagenham, east London. At full build NTT plans 64 MW of critical IT load across 25,600 square meters.
16.58 miles Netwise London East (NLE)
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
16.63 miles Epsilon London Telephone House
16.70 miles 1 Olivers Yard - Digital Realty
Oliver's Yard (LHR18) is a Digital Realty colocation data centre on City Road in London's Shoreditch tech district, formerly a Globix and Telecity site.
16.74 miles Truman Estates: Truman Brewery DC, London
A new data center approved by the UK government as part of the wider Truman Brewery redevelopment on Brick Lane, London, replacing a derelict cold store behind the main brewery complex. The scheme was approved centrally in July 2026 after Tower Hamlets Council failed to determine the applications.
16.75 miles Stellanor: London City
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
16.77 miles iomart DC2 London
iomart's Central London data center occupies City House at 16-22 Epworth Street in Shoreditch, close to the City. It offers about 1,517 m2 of space for iomart's managed hosting, cloud and colocation customers.
16.79 miles Digital Realty: LON2
Digital Realty LON2 is a colocation data centre in Block C at 11 Hanbury Street, Shoreditch, built by Interxion in 2012 on the Truman Brewery estate.
16.81 miles Telehouse London Metro
Telehouse Metro was a small colocation data center at 65 Clifton Street in Shoreditch, just north of Liverpool Street, that Telehouse opened in 1997 to serve customers in the City. Telehouse closed Metro by the end of 2020 and now serves London from its Docklands campus.
16.82 miles L&G: Bidder Street, Newham
A consented hyperscale data center site on a former scrap yard in Bidder Street, Canning Town. Legal & General and Goldacre Ventures developed it with sineQN; Newham approved 80 MW of IT in December 2024, and the site was sold to an unnamed buyer in October 2026.
16.83 miles Digital Realty: LON3
Digital Realty LON3 is a colocation data centre in Block D at 11 Hanbury Street, Shoreditch, opened by Interxion in 2019 across the road from LON1.
16.83 miles Six Degrees: London (Interxion LON3)
16.85 miles Internap London
Former INAP (Internap) colocation suite inside the Digital Realty LON1 data centre at 11 Hanbury Street, Shoreditch. HorizonIQ, INAP's successor, no longer operates there.
16.85 miles Digital Realty: LON1
Digital Realty LON1 is a carrier-neutral colocation data centre in Block B at 11 Hanbury Street, Shoreditch, the original Interxion London site on the Truman Brewery estate.
16.88 miles Verne: London DC01
The site originally opened in 2013 as Volta Data Centres (specifically Volta GSS) and was rebranded to Verne Global in 2022 following its acquisition by Digital 9 Infrastructure.
16.89 miles Volta: LON1
Volta's LON1 is a carrier-neutral colocation data center over seven storeys at 36-43 Great Sutton Street in Clerkenwell, central London, built to a Tier III design.
16.92 miles IP House: London
17.00 miles Equinix: London LD1
17.15 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
17.21 miles Telehouse West Two
Telehouse West Two is a nine-storey data centre under construction on Telehouse's Docklands campus in East London, built for high-density AI and colocation workloads.
17.21 miles Verizon London THW
17.22 miles Global Switch: London North
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
17.22 miles Colt: London East India Dock
17.22 miles EXA: London GS2
17.23 miles Global Switch: London East
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
17.25 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
17.28 miles Stellanor: London East
Stellanor London East at 6 Braham Street opened in 1999 as a Level 3 data center and passed to Stellanor in September 2025.
17.30 miles Telehouse: Inventory Estate
17.31 miles Carrier-Neutral (Telco-Owned) Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.49 miles Lumen: 10 Fleet Pl
17.50 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
17.56 miles Templus: London LON01
Templus London LON01 is a colocation data center in Princes Court on Wapping Lane, east of the City of London. Colt ran it as London City before AtlasEdge bought it in 2021, and Templus took it over with eight other AtlasEdge sites in 2026.
17.56 miles LeaseWeb: London LON-12
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
17.71 miles nLighten: London Citi
In April 2024, nLighten acquired the site from Exa Infrastructure.
17.74 miles Coreix Docklands
17.76 miles ADA: LCY12
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
17.78 miles Abbots Langley Data Centre
The Secretary of State granted outline planning permission on appeal in May 2025 for a two-building data centre of up to 84,000 square metres on land off Bedmond Road, Abbots Langley.
17.81 miles ADA: LCY11
LCY11 is the first of three buildings on Ada Infrastructure's Docklands campus in West Silvertown: a seven-storey, 64,203 m2 data center facing the Thames, with ten data halls on floors 2 to 6. McLaren Construction broke ground in February 2026.
17.82 miles ADA: LCY13
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
17.95 miles Digital Meridian Gate (215 Marsh)
Former Digital Realty LHR21 data centre at 215 Marsh Wall in London Docklands, also known as Meridian Gate, Memaco House and Pennine House. Digital Realty closed the facility around 2022 to 2023.
18.00 miles Digital Sovereign House (227 Marsh Wall)
Sovereign House (LHR20) is a Digital Realty carrier-neutral colocation data centre at 227 Marsh Wall in London Docklands, one of the area's most connected interconnection sites.
18.02 miles Cogent: London LON13
18.07 miles Arelion: London HEX/A
18.12 miles Wavenet: Harbour Exchange
18.13 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
18.22 miles DRT London (Bonnington House)
Bonnington House, now Cloud House West, is a Digital Realty colocation data centre at 47 Millharbour in London Docklands, sold together with Cloud House as LHR19.
18.25 miles Digital Docklands: Cloud House
Cloud House is a Digital Realty colocation data centre at 1 Muirfield Crescent in London Docklands, opened in 2019 and sold with Cloud House West as LHR19.
18.28 miles Core HubInterested in this information?Contact us
18.29 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.29 miles NTT: London LON2
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
18.30 miles Stellanor: Hemel Hempstead
Stellanor Hemel Hempstead is a single-storey colocation data center in Hemel Park, north of London near the M1 and M25.
18.30 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
18.32 miles Echelon LCY10
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
18.35 miles Centersquare: Docklands LHR2
Former Savvis, later Cyxtera, colocation site at 7 Greenwich View Place in London Docklands, inside Keppel's GV7 building. Centersquare closed LHR2 at the end of Q1 2026.
18.36 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
18.38 miles Telstra: London Hosting Centre
Telstra's London Hosting Centre is a carrier-dense colocation facility in the City Reach building at Greenwich View Place on the Isle of Dogs, opened in 1999 as one of the first alternatives to Telehouse North.
18.38 miles City Reach London Docklands
City Reach is Ogden Group's eight-floor building at Greenwich View Place on the Isle of Dogs, home to Telstra's London Hosting Centre and Docklands Data Centre.
18.38 miles DDCL: London
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
18.45 miles NTT Hempstead 1
18.49 miles Six Degrees: Anchorage Point
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
18.50 miles Hyperscale Data CenterInterested in this information?Contact us
18.54 miles NTT Hempstead 3
18.63 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.64 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
18.80 miles NTT Hempstead 2
18.98 miles Stratus: Belvedere
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
19.02 miles Thrive Luton
The site was formerly operated by ONI before being acquired in August 2021.
19.10 miles Options West London
19.12 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in January 2016.
19.13 miles Segro Pure Premier Park
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
19.18 miles Kao Data: Park Royal
Kao Data bought the 4.7-acre former Frogmore Industrial Estate on Acton Lane, Park Royal, from ReAssure in March 2026. It plans a data center of 30 MW or more of IT, ready for service in 2029.
19.18 miles Vantage London II
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
19.19 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
19.37 miles Vantage: LHR11
LHR11 is the first of two data centers on Vantage's London I campus in Park Royal.
19.38 miles Vantage: LHR12
LHR12 is the second data center on Vantage's London I campus in Park Royal.
19.38 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.88 miles Equinix London LD3
19.88 miles OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
19.90 miles Lunar 5
Lunar 5 is Lunar Digital's upcoming Watford data centre, with 7,400 m² across eight data halls and 7 MW of power.
19.91 miles CapitaLand: Chess Building
The Chess Building in Watford is a two-storey Tier III colocation data centre, built in 2008 and bought by CapitaLand Ascendas REIT from Digital Realty in 2023.
19.99 miles Digital Reef: East Havering Campus
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.

Operating Company

Operated by:

nLighten is a digital infrastructure platform owned by I Squared Capital, a leading global infrastructure investor. The company is developing innovative edge data centers distributed across European key economic hubs to provide best-in-class network access to regional, national, and global enterprises, private users, and the mobile workforce. Through the strategic distribution of its edge data centers, nLighten is working towards establishing a pan-European presence in all major cities and providing access to low latency and proximity to end users across Europe.
The edge data centers developed by nLighten are designed to meet the increasing demand for faster and more reliable data processing and storage, while also being mindful of environmental impact. nLighten was founded in 2021 by a core team with many years of experience and wide-ranging expertise in the data center sector. The team's main motivation was to create the next step for the data center industry and align edge data centers with the green transition.

nLighten's goal is to build and operate the leading pan-European edge data center platform. The company's focus on strategic locations, low latency, and environmental consciousness positions it as an innovative player in the European digital infrastructure landscape.

Expansion and Acquisitions

nLighten has grown rapidly through both organic growth and strategic acquisitions:

  • In June 2023, the company acquired Euclyde Data Centers, a French regional platform with six carrier-neutral data centers.
  • In September 2023, nLighten completed the acquisition of Proximity Data Centers, a leading UK edge platform with ten carrier-neutral data centers.
  • The company also acquired 10 carrier data center sites from its sister company Exa Infrastructure.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Mayor of London Commits to Joint Effort on Data Center Growth Challenges
London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A re...

Mayor of London Commits to Joint Effort on Data Center Growth Challenges

June 17, 2026 London

London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A report commissioned by the Greater London Authority and prepared by Buro Happold found that...

Read more
Read nLighten Secures Major Geneva Data Center Services Contract
nLighten Secures Major Geneva Data Center Services Contract

nLighten Secures Major Geneva Data Center Services Contract

May 07, 2026 nLighten

The canton of Geneva, Switzerland, has signed a new data center colocation agreement with nLighten. As detailed in a tender issued by the Geneva Cantonal Office for Information Systems and Digital Technology (OCSIN), the 10-year contract with the European operator’s Swiss subsidiary is worth CHF...

Read more
Read nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network
nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network

nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network

February 13, 2026 nLighten

European Edge data center developer nLighten has signed a deal to connect one of its data centers in the German city of Stuttgart to the city’s district heating network.“The excess heat project with nLighten creates an added value for everyone involved: it delivers climate-friendly heat for our...

Read more
Read Viasat launches new headquarters in London
Viasat launches new headquarters in London

Viasat launches new headquarters in London

April 15, 2024 London

Satellite firm Viasat last week officially launched its new office, at 50 Finsbury Square in London, as the combined offices of both Viasat and Inmarsat, the rival vendor it acquired last year. The new 121,000 square feet site includes new satellite, network, and cyber operations centers for the...

Read more
Read Oriole Networks raises £10 million in seed funding
Oriole Networks raises £10 million in seed funding

Oriole Networks raises £10 million in seed funding

March 29, 2024 London

University College London (UCL) spinout Oriole Networks has raised £10 million ($12.6m) in a seed funding round co-led by UCL Technology Fund, Clean Growth Fund, XTX Ventures, and Dorilton Ventures, with support from Innovate UK Investor Partnership. “As the demand for compute continues to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.