0.09 miles
|
ABStation: Charlton
|
ABStation: Charlton is a small colocation and hosting data centre on the New Lydenburg Commercial Estate in Charlton, south-east London.
|
|
0.15 miles
|
Six Degrees: Anchorage Point
|
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
|
|
0.95 miles
|
ADA: LCY13
|
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
|
|
1.05 miles
|
ADA: LCY12
|
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
|
|
1.05 miles
|
ADA: LCY11
|
LCY11 is the first of three buildings on Ada Infrastructure's Docklands campus in West Silvertown: a seven-storey, 64,203 m2 data center facing the Thames, with ten data halls on floors 2 to 6. McLaren Construction broke ground in February 2026.
|
|
1.89 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
|
1.99 miles
|
Digital Sovereign House (227 Marsh Wall)
|
Sovereign House (LHR20) is a Digital Realty carrier-neutral colocation data centre at 227 Marsh Wall in London Docklands, one of the area's most connected interconnection sites.
|
|
2.02 miles
|
Verizon London THW
|
|
|
2.03 miles
|
Digital Meridian Gate (215 Marsh)
|
Former Digital Realty LHR21 data centre at 215 Marsh Wall in London Docklands, also known as Meridian Gate, Memaco House and Pennine House. Digital Realty closed the facility around 2022 to 2023.
|
|
2.05 miles
|
Telehouse West Two
|
Telehouse West Two is a nine-storey data centre under construction on Telehouse's Docklands campus in East London, built for high-density AI and colocation workloads.
|
|
2.05 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
|
2.05 miles
|
Global Switch: London East
|
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
|
2.07 miles
|
EXA: London GS2
|
|
|
2.09 miles
|
Carrier-Neutral (Telco-Owned) Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
2.10 miles
|
Equinix London LD8 Harbour Exchange (Docklands)
|
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
|
2.10 miles
|
Wavenet: Harbour Exchange
|
|
|
2.10 miles
|
IP House: London
|
|
|
2.10 miles
|
Telehouse: Inventory Estate
|
|
|
2.11 miles
|
Arelion: London HEX/A
|
|
|
2.11 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
|
2.13 miles
|
Global Switch: London North
|
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
|
2.15 miles
|
Colt: London East India Dock
|
|
|
2.16 miles
|
L&G: Bidder Street, Newham
|
A consented hyperscale data center site on a former scrap yard in Bidder Street, Canning Town. Legal & General and Goldacre Ventures developed it with sineQN; Newham approved 80 MW of IT in December 2024, and the site was sold to an unnamed buyer in October 2026.
|
|
2.20 miles
|
Echelon LCY10
|
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
|
2.22 miles
|
Digital Docklands: Cloud House
|
Cloud House is a Digital Realty colocation data centre at 1 Muirfield Crescent in London Docklands, opened in 2019 and sold with Cloud House West as LHR19.
|
|
2.25 miles
|
Telstra: London Hosting Centre
|
Telstra's London Hosting Centre is a carrier-dense colocation facility in the City Reach building at Greenwich View Place on the Isle of Dogs, opened in 1999 as one of the first alternatives to Telehouse North.
|
|
2.26 miles
|
City Reach London Docklands
|
City Reach is Ogden Group's eight-floor building at Greenwich View Place on the Isle of Dogs, home to Telstra's London Hosting Centre and Docklands Data Centre.
|
|
2.26 miles
|
DDCL: London
|
London’s Docklands site provides approximately 23,160 sq. ft. of net technical space divided into two primary data halls with a combined capacity for over 320 cabinets.
|
|
2.27 miles
|
DRT London (Bonnington House)
|
Bonnington House, now Cloud House West, is a Digital Realty colocation data centre at 47 Millharbour in London Docklands, sold together with Cloud House as LHR19.
|
|
2.27 miles
|
Keppel GV7 London
|
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
|
2.27 miles
|
Centersquare: Docklands LHR2
|
Former Savvis, later Cyxtera, colocation site at 7 Greenwich View Place in London Docklands, inside Keppel's GV7 building. Centersquare closed LHR2 at the end of Q1 2026.
|
|
2.37 miles
|
nLighten: London Citi
|
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
|
2.42 miles
|
Cogent: London LON13
|
|
|
2.45 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
|
3.02 miles
|
Coreix Docklands
|
|
|
4.08 miles
|
LeaseWeb: London LON-12
|
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
|
|
4.09 miles
|
Templus: London LON01
|
Templus London LON01 is a colocation data center in Princes Court on Wapping Lane, east of the City of London. Colt ran it as London City before AtlasEdge bought it in 2021, and Templus took it over with eight other AtlasEdge sites in 2026.
|
|
4.53 miles
|
Infinity SDC HereEast
|
Infinity SDC planned a large data center inside Here East, the former Olympic broadcast centre on the Queen Elizabeth Olympic Park. Infinity sold the space to the V&A in 2018 before the data center was completed, and it now forms part of V&A East.
|
|
4.80 miles
|
Stellanor: London East
|
Stellanor London East at 6 Braham Street opened in 1999 as a Level 3 data center and passed to Stellanor in September 2025.
|
|
4.96 miles
|
Digital Realty: LON2
|
Digital Realty LON2 is a colocation data centre in Block C at 11 Hanbury Street, Shoreditch, built by Interxion in 2012 on the Truman Brewery estate.
|
|
4.99 miles
|
Digital Realty: LON3
|
Digital Realty LON3 is a colocation data centre in Block D at 11 Hanbury Street, Shoreditch, opened by Interxion in 2019 across the road from LON1.
|
|
5.00 miles
|
Six Degrees: London (Interxion LON3)
|
|
|
5.00 miles
|
Internap London
|
Former INAP (Internap) colocation suite inside the Digital Realty LON1 data centre at 11 Hanbury Street, Shoreditch. HorizonIQ, INAP's successor, no longer operates there.
|
|
5.01 miles
|
Digital Realty: LON1
|
Digital Realty LON1 is a carrier-neutral colocation data centre in Block B at 11 Hanbury Street, Shoreditch, the original Interxion London site on the Truman Brewery estate.
|
|
5.04 miles
|
Truman Estates: Truman Brewery DC, London
|
A new data center approved by the UK government as part of the wider Truman Brewery redevelopment on Brick Lane, London, replacing a derelict cold store behind the main brewery complex. The scheme was approved centrally in July 2026 after Tower Hamlets Council failed to determine the applications.
|
|
5.24 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
|
|
5.44 miles
|
Telehouse London Metro
|
Telehouse Metro was a small colocation data center at 65 Clifton Street in Shoreditch, just north of Liverpool Street, that Telehouse opened in 1997 to serve customers in the City. Telehouse closed Metro by the end of 2020 and now serves London from its Docklands campus.
|
|
5.44 miles
|
Stellanor: London City
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
5.53 miles
|
iomart DC2 London
|
iomart's Central London data center occupies City House at 16-22 Epworth Street in Shoreditch, close to the City. It offers about 1,517 m2 of space for iomart's managed hosting, cloud and colocation customers.
|
|
5.55 miles
|
Equinix: London LD1
|
|
|
5.56 miles
|
Epsilon London Telephone House
|
|
|
5.63 miles
|
1 Olivers Yard - Digital Realty
|
Oliver's Yard (LHR18) is a Digital Realty colocation data centre on City Road in London's Shoreditch tech district, formerly a Globix and Telecity site.
|
|
5.69 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
6.10 miles
|
Lumen: 10 Fleet Pl
|
|
|
6.17 miles
|
Verne: London DC01
|
The site originally opened in 2013 as Volta Data Centres (specifically Volta GSS) and was rebranded to Verne Global in 2022 following its acquisition by Digital 9 Infrastructure.
|
|
6.17 miles
|
Volta: LON1
|
Volta's LON1 is a carrier-neutral colocation data center over seven storeys at 36-43 Great Sutton Street in Clerkenwell, central London, built to a Tier III design.
|
|
6.28 miles
|
Stellanor: London North Goswell Road
|
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
|
7.00 miles
|
NTT: London LON2
|
NTT Data has acquired a 26.3-acre plot of land in London, UK, for its eighth data center in the market.
|
|
7.00 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
7.18 miles
|
NTT London 1 (Dagenham)
|
NTT London 1 is a data center campus on Yew Tree Avenue in Dagenham, east London. At full build NTT plans 64 MW of critical IT load across 25,600 square meters.
|
|
7.76 miles
|
Verizon London UK5
|
|
|
8.73 miles
|
Green Mountain: London East Bldg2
|
Green Mountain holds planning permission for a second London East building at 5 King George Close, Romford, with eight 2 MW data halls.
|
|
8.75 miles
|
Green Mountain: London East Bldg1
|
Green Mountain's LON1-East data centre in Romford, formerly Infinity SDC, completed a 14 MW expansion inside the existing building in September 2026.
|
|
9.38 miles
|
Ark: Meridian Park
|
|
|
10.03 miles
|
Custodian Dartford DA2
|
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
|
|
10.21 miles
|
Fujitsu: London East (SDC01)
|
Fujitsu's London East (SDC01) data center on Weston Avenue in West Thurrock, Essex, is one of the company's UK service data centers and is staffed around the clock.
|
|
10.43 miles
|
CapitaLand: Croydon Beddington Lane
|
CapitaLand: Croydon Beddington Lane is a two-storey colocation data centre on the Prologis Park industrial estate in Croydon, south London, owned by CapitaLand Ascendas REIT.
|
|
10.58 miles
|
Center AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.58 miles
|
Dare DC: Orpington, UK
|
Dare DC proposes a 50 MW data center campus on Green Belt farmland at Charmwood Farm, Charmwood Lane, near Orpington in the London Borough of Bromley. Bromley ruled in 2026 that the scheme needs an environmental impact assessment before an application is filed.
|
|
10.83 miles
|
Nscale: Loughton, Essex
|
Nscale plans an AI data centre on Langston Road, Loughton, with 50 MW of AI capacity. Microsoft withdrew as anchor tenant in October 2026 after the grid connection slipped into the 2030s.
|
|
11.26 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
11.62 miles
|
Pulsant: Croydon LN–1
|
|
|
11.68 miles
|
BE: Virtus Enfield
|
|
|
11.69 miles
|
Wavenet: Enfield
|
Wavenet Enfield is Wavenet's colocation suite in Data Hall 4 of the VIRTUS LONDON1 data centre on Crown Road, Enfield, north London.
|
|
11.70 miles
|
VIRTUS London1 Enfield
|
VIRTUS LONDON1 in Enfield, north London, was the first data centre VIRTUS opened, in March 2011. It sits on the Trade City estate off Crown Road and also houses colocation suites run by partner providers.
|
|
12.52 miles
|
iomart: DC12 North London
|
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
|
|
12.63 miles
|
Vantage: LHR12
|
LHR12 is the second data center on Vantage's London I campus in Park Royal.
|
|
12.65 miles
|
Vantage: LHR11
|
LHR11 is the first of two data centers on Vantage's London I campus in Park Royal.
|
|
12.66 miles
|
Digital Reef: East Havering Campus
|
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.
|
|
12.74 miles
|
Equinix London LD9 Powergate
|
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in January 2016.
|
|
12.75 miles
|
Metro CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.81 miles
|
Colt Powergate
|
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
|
12.83 miles
|
Pure DC: Brent Cross 1
|
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
|
|
12.89 miles
|
Pure DC: Brent Cross 2
|
Pure DC is constructing the second data center building at its Brent Cross campus in North London, with completion scheduled for Q2 2029.
|
|
12.92 miles
|
Vantage London II
|
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
|
12.99 miles
|
Options West London
|
|
|
13.00 miles
|
Kao Data: Park Royal
|
Kao Data bought the 4.7-acre former Frogmore Industrial Estate on Acton Lane, Park Royal, from ReAssure in March 2026. It plans a data center of 30 MW or more of IT, ready for service in 2029.
|
|
13.21 miles
|
Vision247: London
|
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
|
13.41 miles
|
Segro Pure Premier Park
|
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
|
13.59 miles
|
Ark: Alliance Park
|
Ark Data Centres is building a 50 MW, two-hall data centre at Alliance Park, Acton, on the former Renault Retail Group site in West London.
|
|
13.61 miles
|
Clearstone Energy: Ebbsfleet Campus
|
Clearstone Energy proposes a 300 MW AI data center campus of four buildings on about 58.5 ha off New Barn Road near Southfleet, in the Borough of Dartford, Kent. The government directed in 2026 that the project be consented as a nationally significant infrastructure project.
|
|
13.65 miles
|
Equinix London LD3
|
|
|
13.75 miles
|
Statera: Thurrock Data Centre
|
Statera Energy proposes a data center campus of about 500 MW with battery storage and a 42 ha ecology park on farmland between Dock Road and Marshfoot Road at Tilbury in Thurrock, Essex, connected through its Thurrock power and storage site.
|
|
14.55 miles
|
Global ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.84 miles
|
Redwire: London
|
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
|
|
16.12 miles
|
DARE DC: St Cleres, Stanford-le-Hope
|
DARE DC proposes a 14 MW data center on a 3.9 ha greenfield site at St Cleres on Stanford Road, Stanford-le-Hope, in Thurrock, Essex, with a UK Power Networks connection targeted for 2030.
|
|
16.37 miles
|
Digital Realty: London (Chessington) LHR13
|
Digital Realty LHR13 is a purpose-fitted colocation data centre at Fountain Court in Chessington, south-west London, with five data halls inside the M25.
|
|
16.60 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.33 miles
|
CyrusOne: Southall LON7
|
CyrusOne has secured planning permission from Ealing Council to transform the historic former "Honey Monster Factory" site in Southall, West London, into a state-of-the-art data center campus.
|
|
17.36 miles
|
Equinix: Hertfordshire Campus (DC01UK)
|
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
|
17.42 miles
|
Equinix: Hertfordshire Expansion
|
|
|
17.48 miles
|
Kao Data: Northolt
|
Kao Data's KLON-05 colocation data center in Northolt, West London, bought from Barclays in 2022 and leased back to the bank as anchor tenant.
|
|
17.50 miles
|
Intercity: Elstree
|
Intercity Technology's Elstree hosting centre is at Regent House, Allum Gate, Borehamwood, inherited from Imerja.
|
|
18.42 miles
|
Colt: London 4
|
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
|
18.46 miles
|
Colt: London 7
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
18.46 miles
|
Colt: London 8
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
18.47 miles
|
Colt: London 5
|
This facility is a part of Colt's London Hayes Campus in West London.
|
|
18.50 miles
|
Colt: London 6
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
18.60 miles
|
nLighten: London STN1
|
nLighten's London STN1 is an edge data centre on Geddings Road, Hoddesdon, acquired from EXA Infrastructure in 2024, with 2,100 square metres and 3.6 MW of end-state capacity.
|
|
18.61 miles
|
Stellanor: Hounslow
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
18.78 miles
|
Redhill DC3
|
Redhill DC3 is Building 3 of Galaxy Data Centers' Redhill campus in Foxboro Business Park, Surrey. Digital Realty ran it as LGW10 until it sold the campus in 2024.
|
|
18.79 miles
|
LexisNexis Redhill UK
|
|
|
18.79 miles
|
GTR: Southall 1
|
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
|
|
18.82 miles
|
Redhill DC2
|
The site was previously operated by Digital Realty as LGW11. In 2024, Digital Realty sold its Redhill campus for £64 million ($80m).
|
|
18.82 miles
|
GTR: Southall 2
|
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
|
|
18.83 miles
|
Redhill DC1
|
Redhill DC1 is Building 1 of Galaxy Data Centers' Redhill campus in Foxboro Business Park, Surrey. Digital Realty owned it as LGW12 until the 2024 sale of the campus.
|
|
18.84 miles
|
GTR: Southall 3
|
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
|
|
18.84 miles
|
VIRTUS Hayes London2
|
VIRTUS LONDON2 is a colocation data centre on Western International Park off Hayes Road in Hayes, west London. Opened in 2014, it was the first London data centre to use fresh-air evaporative cooling.
|
|
18.85 miles
|
GTR: Southall 4
|
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
|
|
18.99 miles
|
Ark: Union Park UP4
|
Union Park UP4 is a planned 28 MW data centre building on Ark Data Centres' Union Park campus in Hayes, West London.
|
|
19.01 miles
|
Core CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.02 miles
|
Ark: Union Park UP2
|
Union Park UP2 is the second data centre building on Ark Data Centres' Union Park campus in Hayes, West London, now under construction.
|
|
19.05 miles
|
Brixton Heathrow Estate DC
|
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
|
|
19.07 miles
|
Ark: Union Park UP3
|
Union Park UP3 is the third data centre building on Ark Data Centres' Union Park campus in Hayes, West London, now under construction.
|
|
19.09 miles
|
Metro RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.09 miles
|
Ark: Union Park
|
Union Park UP1 is the first data centre building on Ark Data Centres' Union Park campus in Hayes, West London, in service since 2023.
|
|
19.21 miles
|
Verizon London UK4
|
|
|
19.26 miles
|
Edge HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.57 miles
|
ServerChoice: Harlow
|
|
|
19.58 miles
|
Kao Data: KLON-01
|
KLON-01 is the first of Kao Data's buildings on its Harlow campus: a three-storey, OCP Ready colocation facility with four technology suites, indirect evaporative cooling and HVO-fuelled backup generators.
|
|
19.59 miles
|
Kyndryl: Harlow
|
|
|
19.64 miles
|
Kao Data: KLON-04
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.65 miles
|
Kao Data: KLON-02
|
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.70 miles
|
ChunkyChips: Essex DC1
|
|
|
19.71 miles
|
Kao Data: KLON-03
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.72 miles
|
Nebius: Harlow
|
Nebius leases 22 MW of IT capacity at Kao Data's Harlow campus under a 10-year deal signed in June 2026, spanning KLON-02 and the liquid-cooled KLON-03.
|
|
19.74 miles
|
Kao Data: KLON-08
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.78 miles
|
Kao Data: KLON-07
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
19.88 miles
|
Ark: Elstree Expansion
|
Ark Data Centres plans three further data centre buildings at its Elstree campus in Hertsmere, part of a four-building, 168 MW scheme.
|
|
19.89 miles
|
Rackspace: LON8
|
|
|
19.91 miles
|
Ark: Elstree Campus
|
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
|