QuickHostUK: High Wycombe

Latest Podcast 10 Chapel Rd
Operational
Fully operational facility
Operated by:

QuickHostUK: High Wycombe

Short Code: QHUK DC1
Year Built: 2013
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK). The facility is strategically positioned in the South East of England with direct, low-latency fiber links (approximately 6ms) to major London interconnectivity hubs, including Telehouse North and Equinix Slough (LD7). It features an N+1 power and cooling configuration, including dual A+B power feeds and cold-aisle containment, supported by a 100% uptime SLA. Physically, the site is secured within a gated compound with 24/7 CCTV and keycard access, and it holds both ISO 27001 (Information Security) and ISO 9001 (Quality Management) certifications.

Map and Nearby Locations

10 Chapel Rd
QuickHostUK Sites
Nearby Facilities

QuickHostUK: High Wycombe Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QuickHostUK: High Wycombe

Distance Site About
3.07 miles CapitaLand: Cressex Business Park
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
3.08 miles DRT London (Cresses Business Park)
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
4.03 miles Wycombe Air Park
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
5.02 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
5.12 miles SDC: M40 Campus
The SDC M40 Campus is a planned £2 billion hyperscale data center development in Buckinghamshire, UK, backed by a partnership between US-based SDC Capital Partners and environmental utilities giant Veolia.
6.18 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
6.20 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
6.23 miles Equinix LD7
6.29 miles Equinix LD6
6.29 miles Equinix LD12
6.29 miles Equinix LD14
6.30 miles Equinix LD11x
6.34 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
6.40 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
6.55 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
6.64 miles CyrusOne London I
CyrusOne London I (LON1) is the former Zenium London One at 12 Liverpool Road on the Slough Trading Estate: one two-storey building with about 4,300 sq m of technical space. CyrusOne acquired it with Zenium in 2018.
6.67 miles Equinix LD10
6.70 miles Equinix LD13x
6.71 miles China Mobile Slough
6.72 miles VIRTUS: London 4
LONDON4 is the former Infinity SDC Slough data centre on Liverpool Road, which VIRTUS bought in 2015. It anchors the VIRTUS Slough campus and hosts the Jisc Shared Data Centre.
6.75 miles VIRTUS: London 3
LONDON3 is a SEGRO-built extension next to VIRTUS's LONDON4 on Liverpool Road, Slough, linked directly to it. VIRTUS signed a 20-year lease in 2017 and completed the fit-out in December 2018.
6.79 miles VIRTUS: London 19
VIRTUS Data Centres plans to add a new high-density, carrier-neutral facility at the Slough Trading Estate. SEGRO will develop the powered-shell building, while VIRTUS will complete the specialist data-centre fit-out and operate the facility.
6.81 miles VIRTUS: London 10
6.81 miles VIRTUS: London 12
LONDON12 is VIRTUS's newest operating building on its Slough campus, at 485 Berkshire Avenue on the Slough Trading Estate. Fit-out finished in early 2026.
6.82 miles VIRTUS: London 11
6.82 miles Lumen Slough
6.84 miles Iron Mountain: LON-2
LON-2 is a 269,000 square foot data center at 110 Buckingham Avenue in the Slough Trading Estate.
6.85 miles Logicalis Slough
6.88 miles Iron Mountain: LON-3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
6.89 miles GoDaddy Slough (HEG)
6.90 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
6.96 miles CyrusOne LON5
6.97 miles Pulsant: Maidenhead SE-2
7.00 miles VIRTUS: London 9
7.03 miles GTR: Slough 1
Building 1 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The western block, and the first one GTR fitted out.
7.08 miles GTR: Slough 2
Building 2 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The middle block.
7.13 miles Digital Realty: LHR27
LHR27 is building B of Digital Realty's Slough campus at 631 Ajax Avenue, Slough Trading Estate, 15 minutes from London Heathrow.
7.13 miles Segro: 210 Bath Road
Planned data center by Segro at 210 Bath Road, Slough, on the site of the former UCB and Black & Decker offices. Outline planning permission granted in 2024; detailed design to follow.
7.13 miles GTR: Slough 3
Building 3 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The eastern block.
7.16 miles Digital Realty: LHR26
LHR26 is building A of Digital Realty's Slough campus at 630 Ajax Avenue, Slough Trading Estate. Digital Realty acquired the former Cyxtera LHR1 site in 2024.
7.17 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
7.23 miles Segro: 200 Bath Road
Planned three-storey powered-shell data center by Segro at 200 Bath Road, Slough, on the site of the former Unatrac, Ipsen and BlackBerry offices. Full planning permission granted in 2024.
7.25 miles NTT Slough 2
7.25 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
7.39 miles Virtus: London 18
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
7.41 miles Virtus: London 17
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
7.45 miles Virtus: London 15
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
7.48 miles Virtus: London 16
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
8.41 miles Yondr: Slough 1
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
8.42 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
8.43 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
8.46 miles Yondr: Slough 3
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
8.77 miles Pinewood South: Buckinghamshire Campus
The Pinewood South Data Centre is a planned £1 billion ($1.3bn) hyperscale-ready campus located on a 19.5-hectare site directly south of Pinewood Studios in Iver Heath, Buckinghamshire.
8.87 miles Echelon LCY20
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
8.98 miles CyrusOne: LON6 Bldg1
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
9.03 miles CyrusOne: LON6 Bldg2
This facility will be part of CyrusOne's LON6 Campus in London.
9.10 miles CyrusOne: LON6 Bldg3
This facility will be part of CyrusOne's LON6 Campus in London.
9.16 miles CyrusOne: LON6 Bldg4
This facility will be part of CyrusOne's LON6 Campus in London.
9.21 miles CyrusOne: LON6 Bldg5
This facility will be part of CyrusOne's LON6 Campus in London.
9.27 miles CyrusOne: LON6 Bldg6
This facility will be part of CyrusOne's LON6 Campus in London.
9.82 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.92 miles Mulberry: Denham, Uxbridge
Developer Mulberry Commercial Developments II is planning to build a hyperscale data center on a greenbelt site near the village of Denham in Buckinghamshire, UK.
10.29 miles Sequence: Iver, Buckinghamshire
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
10.49 miles Thorney: Iver DC-F
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
10.53 miles West London Tech Bldg1
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
10.53 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
10.54 miles West London Tech Bldg2
This facility is part of Greystoke's West London Tech Park.
10.57 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
10.62 miles Thorney: Iver DC-C
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
10.65 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.68 miles Thorney: Iver DC-B
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
10.72 miles Segro: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
10.73 miles Thorney Lane LLP: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
10.76 miles Thorney: Iver DC-A
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
11.02 miles CorScale: Court Lane 2
This is the second building at CorScale's Court Lane Campus in Iver, Buckinghamshire.
11.05 miles CorScale: Court Lane 1
In December 2024, Corscale Data Centers secured planning approval for its first UK project, the Corscale Court Lane Data Center in Iver, Buckinghamshire.
11.88 miles Link Park Heathrow Data Center
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
11.98 miles Tritax: Manor Farm (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
12.06 miles Tritax: Manor Farm (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
12.63 miles Lunar 5
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
12.65 miles CapitaLand: Chess Building
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
12.69 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
12.72 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
12.81 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
12.83 miles VIRTUS: London 5
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
12.89 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
12.99 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
13.00 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
13.08 miles Level3 Bracknell
13.18 miles Metro StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.33 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
13.37 miles VIRTUS: London 14
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
13.42 miles Thames Valley Park DC
A data center has been proposed to redevelop office space previously used by Microsoft at Thames Valley Park in Reading, UK.
13.51 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
13.63 miles DRT London (West Drayton)
13.96 miles Pulsant: Reading SE-4
14.06 miles Rackspace: LON8
14.54 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.56 miles Marvel: Hayes
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
14.82 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
15.01 miles Colt: London 8
This planned facility is part of Colt's London Hayes Campus in West London.
15.01 miles GTR: Southall 2
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
15.01 miles GTR: Southall 1
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
15.02 miles GTR: Southall 4
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
15.02 miles GTR: Southall 3
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
15.03 miles Colt: London 6
This planned facility is part of Colt's London Hayes Campus in West London.
15.04 miles Colt: London 7
This planned facility is part of Colt's London Hayes Campus in West London.
15.09 miles Colt: London 5
This facility is a part of Colt's London Hayes Campus in West London.
15.10 miles Abbots Langley Data Centre
15.14 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
15.17 miles VIRTUS Hayes London2
15.43 miles ServerFarm London
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
15.45 miles DataBank: London Heathrow
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
15.52 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
15.53 miles Barclays Data Centre
15.86 miles Brixton Heathrow Estate DC
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
16.01 miles Hyperscale Data CenterInterested in this information?Contact us
16.08 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
16.11 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.12 miles Ark: Longcross 1
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
16.19 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
16.19 miles Ark: Elstree Campus
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
16.22 miles Ark: Elstree Expansion
16.24 miles CyrusOne: Southall LON7
CyrusOne has secured planning permission from Ealing Council to transform the historic former "Honey Monster Factory" site in Southall, West London, into a state-of-the-art data center campus.
16.25 miles NTT Hempstead 2
16.26 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
16.27 miles NTT Hempstead 3
16.28 miles SouthInterested in this information?Contact us
16.33 miles Verizon London UK4
16.39 miles NTT Hempstead 1
16.41 miles Stellanor: Hounslow
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
16.42 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
16.53 miles Pulsant: Reading SE-3
16.54 miles Amito Reading
16.68 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
18.39 miles Redwire: London
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
18.64 miles Gravity Edge: London LDN2
Gravity Edge LDN2 is a 2 MW HPC pod block on the LDN1 campus at Stanhope Road, Camberley, with a roadmap to 5 MW.
18.64 miles Gravity Edge: London LDN1
Gravity Edge LDN1 is a 145,585 sq ft, 5.4-acre freehold data center campus in Yorktown Business Park, Camberley, west of London, with 36 MVA of secured SSEN grid supply, 8 MW operating and a brownfield expansion to 22 MW underway.
18.97 miles Intercity: Elstree
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
19.44 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
19.58 miles Equinix London LD3
19.58 miles Segro Pure Premier Park
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
19.92 miles Stellanor: Woking TC3
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
19.92 miles NaviSite Woking
19.93 miles Digital Realty Woking
19.93 miles CyrusOne London Woking
19.99 miles Kao Data: Royal Park
Kao Data acquired a 4.7-acre brownfield site in Park Royal for a new data center expected to enter service in 2029.
20.00 miles Options West London

Operating Company

Operated by:

QuickHostUK is a UK registered, privately owned company that has been providing hosting solutions since 2011.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Mayor of London Commits to Joint Effort on Data Center Growth Challenges
London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A re...

Mayor of London Commits to Joint Effort on Data Center Growth Challenges

June 17, 2026 London

London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A report commissioned by the Greater London Authority and prepared by Buro Happold found that while...

Read more
Read Viasat launches new headquarters in London
Viasat launches new headquarters in London

Viasat launches new headquarters in London

April 15, 2024 London

Satellite firm Viasat last week officially launched its new office, at 50 Finsbury Square in London, as the combined offices of both Viasat and Inmarsat, the rival vendor it acquired last year. The new 121,000 square feet site includes new satellite, network, and cyber operations centers for the...

Read more
Read Oriole Networks raises £10 million in seed funding
Oriole Networks raises £10 million in seed funding

Oriole Networks raises £10 million in seed funding

March 29, 2024 London

University College London (UCL) spinout Oriole Networks has raised £10 million ($12.6m) in a seed funding round co-led by UCL Technology Fund, Clean Growth Fund, XTX Ventures, and Dorilton Ventures, with support from Innovate UK Investor Partnership. “As the demand for compute continues to...

Read more
Read Segro to develop new data centers after £900 million share issue
Segro to develop new data centers after £900 million share issue

Segro to develop new data centers after £900 million share issue

February 29, 2024 London

Property investor Segro has raised £900 million ($1.1 billion) in a share issue and intends to use this funds to develop its portfolio across the UK and Europe. The London-listed business had initially been hoping to raise £800 million ($1.01bn), but on Tuesday evening its directors said strong...

Read more
Read Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners
Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners

Swiss Life Asset Managers acquires major stake in Telecom Infrastructure Partners

January 10, 2024 London

Investment firm Swiss Life Asset Managers this week entered an agreement with London-based InfraBridge, an infrastructure investment management division of DigitalBridge Group, to acquire a co-controlling equity stake in Telecom Infrastructure Partners (TIP). Gianfranco Saladino, head of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?