░░░ Contact Us to subscribe to our data service MW Total Power
Show SqMDistance | Site | About |
---|---|---|
0.64 miles | AIMES DC3 Mastmaker Road | |
0.68 miles | GTT London Citi |
|
0.82 miles | DRT London (Bonnington House) |
|
0.88 miles | Digital Docklands: Cloud House | |
0.92 miles | Echelon LCY10 | |
0.93 miles | Cyxtera London LO3 & LO4 |
|
0.93 miles | Keppel GV7 London |
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
0.95 miles | Equinix London LD8 Harbour Exchange (Docklands) |
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
0.95 miles | City Reach London Docklands |
|
0.99 miles | Digital Meridian Gate (215 Marsh) |
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
1.05 miles | Digital Sovereign House (227 Marsh Wall) |
|
1.06 miles | Colt London I | |
1.29 miles | Level3 London (E India Dock) | |
1.33 miles | Telehouse South | |
1.39 miles | GTT London GS2 |
|
1.39 miles | Global Switch London Docklands Campus |
|
1.43 miles | Telehouse London Docklands (North, East, West) |
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
1.44 miles | Verizon London THW | |
1.57 miles | Level3 London (120 Leman) | |
1.64 miles | Netwise London Central | |
1.78 miles | Level3 London (Braham) | |
2.01 miles | Interxion London 2 | |
2.03 miles | Internap London | |
2.04 miles | Interxion LON1 LON3 |
|
2.39 miles | Colt House London | |
2.46 miles | Telehouse London Metro |
|
2.47 miles | Redcentric London |
|
2.53 miles | iomart DC2 London |
|
2.60 miles | Epsilon London Telephone House | |
2.66 miles | 1 Olivers Yard - Digital Realty |
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
3.00 miles | Infinity SDC HereEast |
|
3.08 miles | Level3 London (10 Fleet) | |
3.17 miles | Volta EC1 |
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
3.47 miles | Level3 London (Goswell) |
|
3.69 miles | aptum London | |
4.57 miles | Netwise London East (NLE) | |
4.77 miles | Verizon London UK5 | |
4.87 miles | Zenium London One |
|
6.38 miles | Visa United Kingdom | |
7.98 miles | Ark: Meridian Park | |
8.63 miles | OVH London LON-1 |
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
9.45 miles | DRT London (Croydon) | |
9.45 miles | NTT London 1 (Dagenham) |
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
9.57 miles | LDeX London LDeX1 | |
9.77 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
9.78 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
9.79 miles | Vantage London I Campus |
|
9.93 miles | Vantage London II |
|
9.98 miles | Options West London | |
10.26 miles | VIRTUS London1 Enfield |
|
10.34 miles | Infinity Romford North and South |
|
10.42 miles | Equinix London LD3 | |
10.44 miles | Coreix Enfield | |
11.04 miles | Pulsant South London | |
11.88 miles | Redwire | |
13.05 miles | Custodian Dartford DA2 | |
14.46 miles | Barclays Data Centre | |
14.47 miles | DRT London (Chessington) |
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
15.84 miles | Redcentric Hounslow | |
15.94 miles | VIRTUS Hayes London2 |
|
16.14 miles | Ark: Union Park |
|
16.39 miles | Verizon London UK4 | |
17.76 miles | CyrusOne London II (Stockley Park) |
The London II datacenter was originally built by Infinity SDC.
|
17.86 miles | CyrusOne: London II | |
18.12 miles | VIRTUS Stockley Park Campus |
LONDON6 was opened
|
18.42 miles | DRT London (West Drayton) |
|
18.51 miles | LexisNexis Redhill UK |
|
18.52 miles | ServerFarm London |
3,000 m² of data hall expansion space available within 6 – 9 months
Concurrently maintainable standards
|
18.53 miles | Digital Redhill (Foxboro Park) |
1 Foxboro Park, Redhill is fully leased
2 Foxboro Park, Redhill is fully leased |
19.46 miles | DRT London (Chess Building) | |
19.64 miles | Kao London One Campus |
|
Coreix Limited is a London based managed hosting, colocation and network services provider .