0.03 miles
|
GoDaddy Slough (HEG)
|
|
|
0.04 miles
|
Logicalis Slough
|
|
|
0.05 miles
|
Iron Mountain: LON-2
|
LON-2 is a 269,000 square foot data center at 110 Buckingham Avenue in the Slough Trading Estate.
|
|
0.05 miles
|
Rackspace London Slough (LON3)
|
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
|
0.08 miles
|
VIRTUS: London 10
|
LONDON10 is a VIRTUS data centre on Buckingham Avenue on the Slough Trading Estate, part of VIRTUS's Slough campus. It opened in 2020.
|
|
0.10 miles
|
VIRTUS: London 12
|
LONDON12 is VIRTUS's newest operating building on its Slough campus, at 485 Berkshire Avenue on the Slough Trading Estate. Fit-out finished in early 2026.
|
|
0.11 miles
|
VIRTUS: London 9
|
LONDON9 is a VIRTUS data centre on Malton Avenue on the Slough Trading Estate, part of VIRTUS's Slough campus. It entered service in late 2020.
|
|
0.13 miles
|
VIRTUS: London 3
|
LONDON3 is a SEGRO-built extension next to VIRTUS's LONDON4 on Liverpool Road, Slough, linked directly to it. VIRTUS signed a 20-year lease in 2017 and completed the fit-out in December 2018.
|
|
0.15 miles
|
VIRTUS: London 19
|
VIRTUS Data Centres plans to add a new high-density, carrier-neutral facility at the Slough Trading Estate. SEGRO will develop the powered-shell building, while VIRTUS will complete the specialist data-centre fit-out and operate the facility.
|
|
0.17 miles
|
GTR: Slough 1
|
Building 1 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The western block, and the first one GTR fitted out.
|
|
0.17 miles
|
VIRTUS: London 4
|
LONDON4 is the former Infinity SDC Slough data centre on Liverpool Road, which VIRTUS bought in 2015. It anchors the VIRTUS Slough campus and hosts the Jisc Shared Data Centre.
|
|
0.18 miles
|
Equinix LD10
|
|
|
0.19 miles
|
Equinix LD13x
|
|
|
0.20 miles
|
GTR: Slough 2
|
Building 2 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The middle block.
|
|
0.21 miles
|
Lumen Slough
|
|
|
0.24 miles
|
CyrusOne London I
|
CyrusOne London I (LON1) is the former Zenium London One at 12 Liverpool Road on the Slough Trading Estate: one two-storey building with about 4,300 sq m of technical space. CyrusOne acquired it with Zenium in 2018.
|
|
0.25 miles
|
GTR: Slough 3
|
Building 3 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The eastern block.
|
|
0.26 miles
|
Digital Realty: LHR27
|
LHR27 is building B of Digital Realty's Slough campus at 631 Ajax Avenue, Slough Trading Estate, 15 minutes from London Heathrow.
|
|
0.27 miles
|
VIRTUS: London 11
|
LONDON11 is a VIRTUS data centre on Ipswich Road on the Slough Trading Estate, part of VIRTUS's Slough campus. Skanska completed it in 2023 and VIRTUS launched it in 2024.
|
|
0.29 miles
|
Digital Realty: LHR26
|
LHR26 is building A of Digital Realty's Slough campus at 630 Ajax Avenue, Slough Trading Estate. Digital Realty acquired the former Cyxtera LHR1 site in 2024.
|
|
0.29 miles
|
NTT Slough 3
|
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
|
0.32 miles
|
Segro: 210 Bath Road
|
Planned data center by Segro at 210 Bath Road, Slough, on the site of the former UCB and Black & Decker offices. Outline planning permission granted in 2024; detailed design to follow.
|
|
0.36 miles
|
China Mobile Slough
|
|
|
0.36 miles
|
NTT Slough 2
|
|
|
0.37 miles
|
Kao Data Slough
|
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
|
0.38 miles
|
Segro: 200 Bath Road
|
Planned three-storey powered-shell data center by Segro at 200 Bath Road, Slough, on the site of the former Unatrac, Ipsen and BlackBerry offices. Full planning permission granted in 2024.
|
|
0.39 miles
|
CyrusOne LON5
|
|
|
0.40 miles
|
Equinix LD5
|
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
|
0.48 miles
|
CyrusOne London III
|
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
|
0.63 miles
|
Equinix LD14
|
|
|
0.69 miles
|
Equinix LD6
|
|
|
0.69 miles
|
Equinix LD4
|
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
|
0.73 miles
|
Iron Mountain London LON-1
|
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
|
0.76 miles
|
Equinix LD7
|
|
|
0.77 miles
|
Equinix LD11x
|
|
|
0.82 miles
|
Virgin Media O2 Slough
|
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
|
1.80 miles
|
Equinix: Wexham Road
|
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
|
1.83 miles
|
Yondr: Slough 1
|
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
|
1.86 miles
|
Yondr: Slough 2
|
This facility is part of Yondr's London Slough Campus.
|
|
1.93 miles
|
Yondr: Slough 3
|
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
|
|
3.44 miles
|
Central RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.02 miles
|
Pulsant: Maidenhead SE-2
|
|
|
4.20 miles
|
Pinewood South: Buckinghamshire Campus
|
The Pinewood South Data Centre is a planned £1 billion ($1.3bn) hyperscale-ready campus located on a 19.5-hectare site directly south of Pinewood Studios in Iver Heath, Buckinghamshire.
|
|
4.44 miles
|
Thorney: Iver DC-F
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
4.46 miles
|
Thorney: Iver DC-E
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
4.47 miles
|
Thorney: Iver DC-D
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
4.55 miles
|
iomart DC5 Maidenhead
|
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
|
4.63 miles
|
Thorney: Iver DC-C
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
4.66 miles
|
Thorney: Iver DC-B
|
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
4.66 miles
|
Segro: Iver Campus
|
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
|
4.68 miles
|
Thorney Lane LLP: Iver Campus
|
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
|
4.76 miles
|
CyrusOne: LON6 Bldg1
|
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
|
4.76 miles
|
Core StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.79 miles
|
CyrusOne: LON6 Bldg2
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
4.80 miles
|
SDC: M40 Campus
|
The SDC M40 Campus is a planned £2 billion hyperscale data center development in Buckinghamshire, UK, backed by a partnership between US-based SDC Capital Partners and environmental utilities giant Veolia.
|
|
4.83 miles
|
CyrusOne: LON6 Bldg3
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
4.86 miles
|
CyrusOne: LON6 Bldg4
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
4.88 miles
|
CyrusOne: LON6 Bldg5
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
4.91 miles
|
CyrusOne: LON6 Bldg6
|
This facility will be part of CyrusOne's LON6 Campus in London.
|
|
5.03 miles
|
Thorney: Iver DC-A
|
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
|
5.20 miles
|
CorScale: Court Lane 2
|
This is the second building at CorScale's Court Lane Campus in Iver, Buckinghamshire.
|
|
5.24 miles
|
CorScale: Court Lane 1
|
In December 2024, Corscale Data Centers secured planning approval for its first UK project, the Corscale Court Lane Data Center in Iver, Buckinghamshire.
|
|
5.27 miles
|
Tritax: Manor Farm (Phase 2)
|
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
|
5.33 miles
|
Tritax: Manor Farm (Phase 1)
|
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
|
5.39 miles
|
Sequence: Iver, Buckinghamshire
|
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
|
5.49 miles
|
West London Tech Bldg2
|
This facility is part of Greystoke's West London Tech Park.
|
|
5.52 miles
|
West London Tech Bldg1
|
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
|
5.87 miles
|
Link Park Heathrow Data Center
|
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
|
6.31 miles
|
Mulberry: Denham, Uxbridge
|
Developer Mulberry Commercial Developments II is planning to build a hyperscale data center on a greenbelt site near the village of Denham in Buckinghamshire, UK.
|
|
6.88 miles
|
QuickHostUK: High Wycombe
|
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
|
7.06 miles
|
VIRTUS: London 8
|
LONDON8 is a VIRTUS data centre with eight data halls on the Stockley Park campus in West Drayton, west London. Its first phase entered service in March 2022.
|
|
7.07 miles
|
VIRTUS: London 7
|
LONDON7 is the largest building on VIRTUS's Stockley Park campus in West Drayton, west London. Its first phase entered service in late 2020.
|
|
7.18 miles
|
VIRTUS: London 5
|
LONDON5 is the first building VIRTUS opened on its Stockley Park campus in West Drayton, west London, near Heathrow. It went live in July 2018 alongside LONDON6.
|
|
7.19 miles
|
VIRTUS: London 6
|
LONDON6 is a VIRTUS data centre on the Stockley Park campus in West Drayton, west London. It went live with LONDON5 in July 2018.
|
|
7.38 miles
|
DRT London (West Drayton)
|
Digital Realty LHR17 is a carrier-neutral colocation data centre at Airport Gate on the Bath Road near Heathrow, formerly Equinix LD2.
|
|
7.55 miles
|
CyrusOne London II (Stockley Park)
|
The London II datacenter was originally built by Infinity SDC.
|
|
7.66 miles
|
VIRTUS: London 14
|
LONDON14 is a VIRTUS data centre in a converted warehouse on Prologis Park Heathrow in Hayes, west London, marketed as part of the Stockley Park campus. VIRTUS opened it in 2026.
|
|
8.34 miles
|
Rackspace: LON8
|
|
|
8.76 miles
|
ServerFarm London
|
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
|
8.77 miles
|
DataBank: London Heathrow
|
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
|
8.95 miles
|
Cloud CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.97 miles
|
Marvel: Hayes
|
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
|
|
9.19 miles
|
Ark: Union Park
|
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
|
9.32 miles
|
CentriLogic Berkshire
|
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
|
9.38 miles
|
GTR: Southall 4
|
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
|
|
9.39 miles
|
GTR: Southall 3
|
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
|
|
9.40 miles
|
GTR: Southall 2
|
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
|
|
9.43 miles
|
GTR: Southall 1
|
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
|
|
9.43 miles
|
VIRTUS Hayes London2
|
VIRTUS LONDON2 is a colocation data centre on Western International Park off Hayes Road in Hayes, west London. Opened in 2014, it was the first London data centre to use fresh-air evaporative cooling.
|
|
9.56 miles
|
Level3 Bracknell
|
|
|
9.68 miles
|
CapitaLand: Cressex High Wycombe
|
CapitaLand: Cressex High Wycombe is a colocation data centre on Cressex Business Park in High Wycombe, Buckinghamshire, owned by CapitaLand Ascendas REIT.
|
|
9.69 miles
|
Colt: London 6
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
9.70 miles
|
Keppel: London Bracknell
|
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
|
9.70 miles
|
Brixton Heathrow Estate DC
|
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
|
|
9.72 miles
|
Colt: London 5
|
This facility is a part of Colt's London Hayes Campus in West London.
|
|
9.72 miles
|
Ark: Longcross 2
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
|
9.72 miles
|
Vodafone: London Bracknell
|
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
|
9.72 miles
|
Colt: London 8
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
9.72 miles
|
Colt: London 7
|
This planned facility is part of Colt's London Hayes Campus in West London.
|
|
9.76 miles
|
Ark: Longcross 1
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
|
|
9.76 miles
|
Colt: London 4
|
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
|
9.98 miles
|
Wycombe Air Park Bldg6
|
This facility is planned as part of the Wycombe Air Park campus, a development proposed by Wycombe Park Ltd in collaboration with Nexus Analytics & Research.
|
|
10.00 miles
|
Verizon London UK4
|
|
|
10.01 miles
|
Wycombe Air Park Bldg5
|
This facility is planned as part of the Wycombe Air Park campus, a development proposed by Wycombe Park Ltd in collaboration with Nexus Analytics & Research.
|
|
10.02 miles
|
Wycombe Air Park Bldg4
|
This facility is planned as part of the Wycombe Air Park campus, a development proposed by Wycombe Park Ltd in collaboration with Nexus Analytics & Research.
|
|
10.04 miles
|
Wycombe Air Park Bldg3
|
This facility is planned as part of the Wycombe Air Park campus, a development proposed by Wycombe Park Ltd in collaboration with Nexus Analytics & Research.
|
|
10.05 miles
|
GlobalInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.06 miles
|
Wycombe Air Park Bldg2
|
This facility is planned as part of the Wycombe Air Park campus, a development proposed by Wycombe Park Ltd in collaboration with Nexus Analytics & Research.
|
|
10.09 miles
|
Wycombe Air Park Bldg1
|
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
|
|
10.24 miles
|
Stellanor: Hounslow
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
10.86 miles
|
CyrusOne: Southall LON7
|
CyrusOne has secured planning permission from Ealing Council to transform the historic former "Honey Monster Factory" site in Southall, West London, into a state-of-the-art data center campus.
|
|
11.15 miles
|
Kao Data: Northolt
|
Kao Data's KLON-05 colocation data center in Northolt, West London, bought from Barclays in 2022 and leased back to the bank as anchor tenant.
|
|
11.85 miles
|
Lunar 5
|
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
|
|
11.90 miles
|
CapitaLand: Chess Building
|
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
|
|
12.74 miles
|
Centersquare: Reading LHR3
|
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
|
13.35 miles
|
Redwire: London
|
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
|
|
13.40 miles
|
Stellanor: Byfleet
|
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
|
|
13.51 miles
|
Echelon LCY20
|
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
|
|
13.65 miles
|
NaviSite Woking
|
Former NaviSite suite inside Digital Realty's Woking data centre. NaviSite's UK business has since been wound up.
|
|
13.65 miles
|
Digital Realty Woking
|
Digital Realty Woking (LGW14) is a large multi-tenant data centre on Goldsworth Park Trading Estate in Woking, Surrey, where several providers run private suites.
|
|
13.66 miles
|
CyrusOne London Woking
|
Former CyrusOne suite inside Digital Realty's Woking data centre, CyrusOne's first European site from 2011. CyrusOne no longer operates in Woking.
|
|
13.66 miles
|
Stellanor: Woking TC3
|
Stellanor's Woking TC3 is a colocation suite inside Digital Realty's Woking data centre on Goldsworth Park Trading Estate, Surrey.
|
|
13.96 miles
|
Thames Valley Park DC
|
A data center has been proposed to redevelop office space previously used by Microsoft at Thames Valley Park in Reading, UK.
|
|
14.24 miles
|
Virtus: London 18
|
LONDON18 is the largest planned building on VIRTUS's Saunderton campus off Haw Lane, near High Wycombe in Buckinghamshire.
|
|
14.26 miles
|
Virtus: London 17
|
LONDON17 is a planned building on VIRTUS's Saunderton campus off Haw Lane, near High Wycombe in Buckinghamshire.
|
|
14.31 miles
|
Virtus: London 15
|
LONDON15 is the first building of VIRTUS's Saunderton campus on the former Molins factory site off Haw Lane, near High Wycombe in Buckinghamshire. VIRTUS targets service in late 2026.
|
|
14.33 miles
|
Virtus: London 16
|
LONDON16 is a planned building on VIRTUS's Saunderton campus off Haw Lane, near High Wycombe in Buckinghamshire.
|
|
14.37 miles
|
Gravity Edge: London LDN2
|
Gravity Edge LDN2 is a 2 MW HPC pod block on the LDN1 campus at Stanhope Road, Camberley, with a roadmap to 5 MW.
|
|
14.37 miles
|
Gravity Edge: London LDN1
|
Gravity Edge LDN1 is a 145,585 sq ft, 5.4-acre freehold data center campus in Yorktown Business Park, Camberley, west of London, with 36 MVA of secured SSEN grid supply, 8 MW operating and a brownfield expansion to 22 MW underway.
|
|
14.49 miles
|
Pulsant: Reading SE-4
|
|
|
14.71 miles
|
Equinix London LD3
|
|
|
14.73 miles
|
Ark: Alliance Park
|
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
|
15.02 miles
|
Vision247: London
|
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
|
15.04 miles
|
Ark: Elstree Campus
|
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
|
|
15.06 miles
|
Ark: Elstree Expansion
|
|
|
15.13 miles
|
Segro Pure Premier Park
|
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
|
15.46 miles
|
Kao Data: Royal Park
|
Kao Data acquired a 4.7-acre brownfield site in Park Royal for a new data center expected to enter service in 2029.
|
|
15.49 miles
|
Options West London
|
|
|
15.53 miles
|
Vantage London II
|
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
|
15.62 miles
|
Global CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.65 miles
|
Colt Powergate
|
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
|
15.70 miles
|
Equinix London LD9 Powergate
|
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in January 2016.
|
|
15.71 miles
|
Vantage: LHR11
|
LHR11 is the first of two data centers on Vantage's London I campus in Park Royal.
|
|
15.72 miles
|
Vantage: LHR12
|
LHR12 is the second data center on Vantage's London I campus in Park Royal.
|
|
16.05 miles
|
Abbots Langley Data Centre
|
|
|
16.47 miles
|
Asanti: Reading
|
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
|
16.67 miles
|
Stellanor: Reading
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
16.70 miles
|
Pulsant: Reading SE-3
|
|
|
16.74 miles
|
Pure DC: Brent Cross
|
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
|
|
17.06 miles
|
iomart: DC12 North London
|
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
|
|
17.28 miles
|
Intercity: Elstree
|
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
|
|
17.28 miles
|
Asanti: Farnborough
|
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
|
|
17.64 miles
|
Digital Realty: London (Chessington) LHR13
|
Digital Realty LHR13 is a purpose-fitted colocation data centre at Fountain Court in Chessington, south-west London, with five data halls inside the M25.
|
|
17.81 miles
|
Kyndryl: Farnborough
|
|
|
18.09 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
18.25 miles
|
Datum: FRN1
|
|
|
18.27 miles
|
Datum: FRN2
|
Datum's second Farnborough data centre, under construction beside FRN1 at Cody Technology Park and targeted to open in 2027.
|
|
18.29 miles
|
Ark: Cody Park
|
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
|
18.29 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.31 miles
|
NTT Hempstead4
|
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
|
|
18.32 miles
|
Point MaxInterested in this information?Contact us
|
|
|
18.40 miles
|
Northtree: Hemel Hempstead
|
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
|
|
18.45 miles
|
NTT Hempstead 3
|
|
|
18.55 miles
|
NTT Hempstead 2
|
|
|
18.58 miles
|
NTT Hempstead 1
|
|
|
18.91 miles
|
Visa United Kingdom
|
|
|
19.73 miles
|
Smallworld: Guildford
|
|