Kyndryl-operated colocation footprint (site code KGB51634) within the Kao Data Campus (Building 1), Harlow, Essex, UK. Design comparable to Uptime Tier III and OCP-ready.

Facility

  • Design level: Tier III equivalent; OCP-ready hall
  • Location: Kao Data Campus, Building 1
  • Power infrastructure: N+1 UPS topology
  • Cooling: direct fresh-air with adiabatic assist and DX backup
  • Certifications: ISO/IEC 27001
  • Connectivity: Megaport, euNetworks, Console Connect, LINX, Vorboss

Map and Nearby Locations:

Kao Data Campus
Kyndryl Sites
Nearby Facilities

Sites within 15 miles of Kyndryl: Harlow

Distance Site About
2.12 miles Kao Data: KLON-04
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
2.12 miles Kao Data: KLON-02
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
2.16 miles ServerChoice: Harlow
2.16 miles Kao Data: Harlow KLON-01
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
2.17 miles Kao Data: KLON-03
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
2.25 miles Kao Data: KLON-08
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
2.25 miles Kao Data: KLON-07
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
4.44 miles Exa: Hoddesdon
5.64 miles Hyperscale Data Center Request Dataset
Epping Forest District Council has granted planning permission for Google’s new data center campus at North Weald Airfield, moving the project forward despite local objections.
8.73 miles Hyperscale Data Center Request Dataset
As part of a £5 billion two-year commitment to the UK, Google has opened a new data centre in Waltham Cross, Hertfordshire.
9.23 miles Nscale: Loughton, Essex
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
11.31 miles VIRTUS London1 Enfield
11.32 miles Wavenet: Enfield
Wavenet’s Enfield facility is not a stand-alone data centre – it is “Data Hall 4” inside the Virtus LONDON1 campus.
11.72 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
11.72 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
11.83 miles Coreix Enfield
11.88 miles CapitaLand: Welwyn Garden City
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
12.44 miles ServerChoice: London
12.98 miles Ark: Meridian Park
14.19 miles Reef Origin: Elevate Quarter 2
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
14.27 miles Reef Origin: Elevate Quarter Campus
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
14.30 miles Computacenter: Hertfordshire
14.33 miles Green Mountain: London East
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
14.36 miles ServerChoice: Stevenage
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
14.42 miles Infinity Romford North and South
14.42 miles Green Mountain: London East Bldg 2
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
14.66 miles Nigsun: Stevenage NCS1
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
14.83 miles Equinix: Hertfordshire Campus (DC01UK)
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
14.86 miles Equinix: Hertfordshire Expansion
15.32 miles Fujitsu: London North STE04
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
17.07 miles NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
17.40 miles Infinity SDC HereEast
18.38 miles Intercity: Elstree
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
18.96 miles Netwise London East (NLE)
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
19.16 miles Kao Data: Bidder Street, Newham
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
19.20 miles Digital Reef: East Havering Campus
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
19.27 miles IP House: London
19.57 miles Verizon London THW
19.57 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
19.61 miles GTT London GS2
19.62 miles Global Switch: London East
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
19.62 miles Global Switch: London North
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
19.63 miles Lumen London 3 (E India Dock)
19.66 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
19.69 miles Colt House London
19.70 miles Lumen: Goswell Rd
19.71 miles Epsilon London Telephone House
19.72 miles Internap London
19.75 miles Stellanor: London North
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
19.76 miles Digital Realty: LON2
19.79 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
19.81 miles Stellanor: London City
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
19.82 miles Six Degrees: London (Interxion LON3)
19.84 miles Digital Realty: LON1 LON3
19.85 miles iomart DC2 London
19.87 miles Telehouse London Metro
19.88 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
19.91 miles Stratus: Belvedere
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
19.91 miles Verizon London UK5
19.94 miles ADA: LCY02
This building is the second facility in Ada Infrastructure's Docklands campus, East London.
20.00 miles ADA: LCY03
This building is the third facility in Ada Infrastructure's Docklands campus, East London.

Kyndryl: Harlow Data Center Photos (See all)

Operating Company

Operated by:

IBM Cloud history

  • June 2013 - IBM acquired SoftLayer, a public cloud platform, to serve as the foundation for its IaaS offering
  • July 2014 - IBM introduced the Bluemix Platform-as-a-Service (PaaS)
  • October 2016 - IBM rolled the SoftLayer brand under its Bluemix brand of PaaS offerings
  • October 2017 - IBM unified its entire cloud portfolio as IBM Cloud
22
Facilities
18
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?