|
2.12 miles
|
Kao Data: KLON-02
|
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.14 miles
|
Kao Data: KLON-03
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.15 miles
|
Kao Data: KLON-07
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.16 miles
|
ServerChoice: Harlow
|
|
|
2.16 miles
|
Kao Data: KLON-01
|
KLON-01 is the first of Kao Data's buildings on its Harlow campus: a three-storey, OCP Ready colocation facility with four technology suites, indirect evaporative cooling and HVO-fuelled backup generators.
|
|
2.19 miles
|
Kao Data: KLON-04
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.20 miles
|
Kao Data: KLON-08
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
4.44 miles
|
Exa: Hoddesdon
|
|
|
5.64 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.73 miles
|
Central CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.23 miles
|
Nscale: Loughton, Essex
|
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
|
11.31 miles
|
VIRTUS London1 Enfield
|
VIRTUS LONDON1 in Enfield, north London, was the first data centre VIRTUS opened, in March 2011. It sits on the Trade City estate off Crown Road and also houses colocation suites run by partner providers.
|
|
11.32 miles
|
BE: Virtus Enfield
|
|
|
11.32 miles
|
Wavenet: Enfield
|
Wavenet Enfield is Wavenet's colocation suite in Data Hall 4 of the VIRTUS LONDON1 data centre on Crown Road, Enfield, north London.
|
|
11.72 miles
|
INAP North London
|
INAP's North London data center is located within Colt's facility on Black Fan Road
|
|
11.72 miles
|
Colt London North: Welwyn Garden City
|
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
|
11.88 miles
|
CapitaLand: Welwyn Garden City
|
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
|
|
12.44 miles
|
ServerChoice: London
|
|
|
12.98 miles
|
Ark: Meridian Park
|
|
|
14.19 miles
|
Reef Origin: Elevate Quarter 2
|
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
|
|
14.27 miles
|
Reef Origin: Elevate Quarter 1
|
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
|
|
14.30 miles
|
Computacenter: Hertfordshire
|
|
|
14.33 miles
|
Green Mountain: London East Bldg1
|
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
|
14.36 miles
|
ServerChoice: Stevenage
|
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
|
|
14.42 miles
|
Green Mountain: London East Bldg2
|
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
|
14.66 miles
|
Nigsun: Stevenage NCS1
|
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
|
|
14.79 miles
|
Pure DC: Brent Cross 2
|
Pure DC is constructing the second data center building at its Brent Cross campus in North London, with completion scheduled for Q2 2029.
|
|
14.83 miles
|
Equinix: Hertfordshire Campus (DC01UK)
|
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
|
14.86 miles
|
Equinix: Hertfordshire Expansion
|
|
|
15.32 miles
|
Fujitsu: London North STE04
|
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
|
|
15.48 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
17.07 miles
|
NTT London 1 (Dagenham)
|
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
|
17.40 miles
|
Infinity SDC HereEast
|
Infinity SDC's former data center at Here East on the Queen Elizabeth Olympic Park. Infinity sold the space to the V&A in 2018, and it now forms part of V&A East.
|
|
18.38 miles
|
Intercity: Elstree
|
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
|
|
18.70 miles
|
Tritax: Blackwater BW1
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
18.76 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
18.96 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
|
19.16 miles
|
Kao Data: Bidder Street, Newham
|
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
|
|
19.20 miles
|
Digital Reef: East Havering Campus
|
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
|
|
19.27 miles
|
IP House: London
|
|
|
19.57 miles
|
Verizon London THW
|
|
|
19.57 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
|
19.61 miles
|
GTT London GS2
|
|
|
19.62 miles
|
Global Switch: London East
|
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
|
19.62 miles
|
Global Switch: London North
|
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
|
19.63 miles
|
Lumen London 3 (E India Dock)
|
|
|
19.66 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
|
19.69 miles
|
Colt House London
|
|
|
19.70 miles
|
Lumen: Goswell Rd
|
|
|
19.71 miles
|
Epsilon London Telephone House
|
|
|
19.73 miles
|
Truman Estates: Truman Brewery DC, London
|
A new data center approved by the UK government as part of the wider Truman Brewery redevelopment on Brick Lane, London, replacing a derelict cold store behind the main brewery complex. The scheme was approved centrally in July 2026 after Tower Hamlets Council failed to determine the applications.
|
|
19.75 miles
|
Stellanor: London North
|
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
|
19.76 miles
|
Digital Realty: LON2
|
Digital Realty LON2 is a colocation data centre in Block C at 11 Hanbury Street, Shoreditch, built by Interxion in 2012 on the Truman Brewery estate.
|
|
19.79 miles
|
1 Olivers Yard - Digital Realty
|
Oliver's Yard (LHR18) is a Digital Realty colocation data centre on City Road in London's Shoreditch tech district, formerly a Globix and Telecity site.
|
|
19.81 miles
|
Digital Realty: LON3
|
Digital Realty LON3 is a colocation data centre in Block D at 11 Hanbury Street, Shoreditch, opened by Interxion in 2019 across the road from LON1.
|
|
19.81 miles
|
Stellanor: London City
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
19.82 miles
|
Six Degrees: London (Interxion LON3)
|
|
|
19.83 miles
|
Internap London
|
Former INAP (Internap) colocation suite inside the Digital Realty LON1 data centre at 11 Hanbury Street, Shoreditch. HorizonIQ, INAP's successor, no longer operates there.
|
|
19.84 miles
|
Digital Realty: LON1
|
Digital Realty LON1 is a carrier-neutral colocation data centre in Block B at 11 Hanbury Street, Shoreditch, the original Interxion London site on the Truman Brewery estate.
|
|
19.85 miles
|
iomart DC2 London
|
|
|
19.87 miles
|
Telehouse London Metro
|
|
|
19.88 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
|
19.91 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
|
|
19.91 miles
|
Verizon London UK5
|
|
|
19.95 miles
|
ADA: LCY12
|
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
|
|
19.99 miles
|
ADA: LCY13
|
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
|