2.12 miles
|
Kao Data: KLON-02
|
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.14 miles
|
Kao Data: KLON-03
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.15 miles
|
Kao Data: KLON-07
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.16 miles
|
ServerChoice: Harlow
|
|
|
2.16 miles
|
Kao Data: KLON-01
|
KLON-01 is the first of Kao Data's buildings on its Harlow campus: a three-storey, OCP Ready colocation facility with four technology suites, indirect evaporative cooling and HVO-fuelled backup generators.
|
|
2.19 miles
|
Kao Data: KLON-04
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
2.20 miles
|
Kao Data: KLON-08
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
4.44 miles
|
Exa: Hoddesdon
|
|
|
5.64 miles
|
HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.73 miles
|
Edge TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.23 miles
|
Nscale: Loughton, Essex
|
Nscale, a prominent UK AI company, will invest $2.5 billion over the next three years to bolster the UK's data center infrastructure.
|
|
11.31 miles
|
VIRTUS London1 Enfield
|
|
|
11.32 miles
|
Wavenet: Enfield
|
Wavenet’s Enfield facility is not a stand-alone data centre – it is “Data Hall 4” inside the Virtus LONDON1 campus.
|
|
11.72 miles
|
Colt London North: Welwyn Garden City
|
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
|
11.72 miles
|
INAP North London
|
INAP's North London data center is located within Colt's facility on Black Fan Road
|
|
11.83 miles
|
Coreix Enfield
|
|
|
11.88 miles
|
CapitaLand: Welwyn Garden City
|
In July 2024, CapitaLand secured planning permission for a £87 million data centre redevelopment.
|
|
12.44 miles
|
ServerChoice: London
|
|
|
12.98 miles
|
Ark: Meridian Park
|
|
|
14.19 miles
|
Reef Origin: Elevate Quarter 2
|
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
|
|
14.27 miles
|
Reef Origin: Elevate Quarter 1
|
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
|
|
14.30 miles
|
Computacenter: Hertfordshire
|
|
|
14.33 miles
|
Green Mountain: London East Bldg1
|
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
|
14.36 miles
|
ServerChoice: Stevenage
|
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
|
|
14.42 miles
|
Infinity Romford North and South
|
|
|
14.42 miles
|
Green Mountain: London East Bldg2
|
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
|
14.66 miles
|
Nigsun: Stevenage NCS1
|
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
|
|
14.79 miles
|
Pure DC: Brent Cross 2
|
Pure DC is constructing the second data center building at its Brent Cross campus in North London, with completion scheduled for Q2 2029.
|
|
14.83 miles
|
Equinix: Hertfordshire Campus (DC01UK)
|
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
|
14.86 miles
|
Equinix: Hertfordshire Expansion
|
|
|
15.32 miles
|
Fujitsu: London North STE04
|
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
|
|
15.48 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
17.07 miles
|
NTT London 1 (Dagenham)
|
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
|
17.40 miles
|
Infinity SDC HereEast
|
|
|
18.38 miles
|
Intercity: Elstree
|
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
|
|
18.70 miles
|
Tritax: Blackwater BW1
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
18.76 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
18.96 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
|
19.16 miles
|
Kao Data: Bidder Street, Newham
|
The Bidder Street Data Center has received planning approval from local councilors in the Newham area of East London. The facility is expected to begin operations by 2027.
|
|
19.20 miles
|
Digital Reef: East Havering Campus
|
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
|
|
19.27 miles
|
IP House: London
|
|
|
19.57 miles
|
Verizon London THW
|
|
|
19.57 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
|
19.61 miles
|
GTT London GS2
|
|
|
19.62 miles
|
Global Switch: London East
|
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
|
19.62 miles
|
Global Switch: London North
|
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
|
19.63 miles
|
Lumen London 3 (E India Dock)
|
|
|
19.66 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
|
19.69 miles
|
Colt House London
|
|
|
19.70 miles
|
Lumen: Goswell Rd
|
|
|
19.71 miles
|
Epsilon London Telephone House
|
|
|
19.72 miles
|
Internap London
|
|
|
19.73 miles
|
Truman Estates: Truman Brewery DC, London
|
A new data center approved by the UK government as part of the wider Truman Brewery redevelopment on Brick Lane, London, replacing a derelict cold store behind the main brewery complex. The scheme was approved centrally in July 2026 after Tower Hamlets Council failed to determine the applications.
|
|
19.75 miles
|
Stellanor: London North
|
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
|
19.76 miles
|
Digital Realty: LON2
|
|
|
19.79 miles
|
1 Olivers Yard - Digital Realty
|
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
|
19.81 miles
|
Stellanor: London City
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
19.82 miles
|
Six Degrees: London (Interxion LON3)
|
|
|
19.84 miles
|
Digital Realty: LON1 LON3
|
|
|
19.85 miles
|
iomart DC2 London
|
|
|
19.87 miles
|
Telehouse London Metro
|
|
|
19.88 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
|
19.91 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
|
|
19.91 miles
|
Verizon London UK5
|
|
|
19.95 miles
|
ADA: LCY12
|
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
|
|
19.99 miles
|
ADA: LCY13
|
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
|