|
0.01 miles
|
Kao Data: KLON-03
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
0.07 miles
|
Kao Data: KLON-08
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
0.08 miles
|
Kao Data: KLON-07
|
This facility will be part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
0.08 miles
|
Kao Data: KLON-04
|
This facility will be a part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
0.09 miles
|
Kao Data: KLON-02
|
This facility is part of KAO Data's Harlow Campus, located in the London-Stansted-Cambridge technology corridor.
|
|
0.14 miles
|
Kyndryl: Harlow
|
|
|
0.14 miles
|
Kao Data: KLON-01
|
KLON-01 is the first of Kao Data's buildings on its Harlow campus: a three-storey, OCP Ready colocation facility with four technology suites, indirect evaporative cooling and HVO-fuelled backup generators.
|
|
0.15 miles
|
ServerChoice: Harlow
|
|
|
3.76 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.78 miles
|
nLighten: London STN1
|
nLighten's London STN1 is an edge data centre on Geddings Road, Hoddesdon, acquired from EXA Infrastructure in 2024, with 2,100 square metres and 3.6 MW of end-state capacity.
|
|
8.89 miles
|
Nscale: Loughton, Essex
|
Nscale plans an AI data centre on Langston Road, Loughton, with 50 MW of AI capacity. Microsoft withdrew as anchor tenant in October 2026 after the grid connection slipped into the 2030s.
|
|
9.26 miles
|
Hub ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.44 miles
|
VIRTUS London1 Enfield
|
VIRTUS LONDON1 in Enfield, north London, was the first data centre VIRTUS opened, in March 2011. It sits on the Trade City estate off Crown Road and also houses colocation suites run by partner providers.
|
|
11.44 miles
|
BE: Virtus Enfield
|
|
|
11.45 miles
|
Wavenet: Enfield
|
Wavenet Enfield is Wavenet's colocation suite in Data Hall 4 of the VIRTUS LONDON1 data centre on Crown Road, Enfield, north London.
|
|
12.79 miles
|
Ark: Meridian Park
|
|
|
12.80 miles
|
Green Mountain: London East Bldg1
|
Green Mountain's LON1-East data centre in Romford, formerly Infinity SDC, completed a 14 MW expansion inside the existing building in September 2026.
|
|
12.88 miles
|
Green Mountain: London East Bldg2
|
Green Mountain holds planning permission for a second London East building at 5 King George Close, Romford, with eight 2 MW data halls.
|
|
13.59 miles
|
Colt London North: Welwyn Garden City
|
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
|
13.59 miles
|
INAP North London
|
INAP's North London data center is located within Colt's facility on Black Fan Road
|
|
13.64 miles
|
Clearstone Energy: East London Campus
|
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.
|
|
13.79 miles
|
CapitaLand: Welwyn Garden City
|
CapitaLand Ascendas REIT has planning permission to replace the former HSBC Hertfordshire data centre in Welwyn Garden City with a new data centre of up to 28,830 square metres, and is seeking a tenant before it builds.
|
|
14.29 miles
|
ServerChoice: SC-2 Welwyn Garden City
|
ServerChoice's SC-2 is a colocation suite at BioPark on Broadwater Road, Welwyn Garden City, open since 2012.
|
|
15.56 miles
|
NTT London 1 (Dagenham)
|
NTT London 1 is a data center campus on Yew Tree Avenue in Dagenham, east London. At full build NTT plans 64 MW of critical IT load across 25,600 square meters.
|
|
15.92 miles
|
Equinix: Hertfordshire Campus (DC01UK)
|
Equinix has purchased the DC01UK data center campus in Hertfordshire, UK, a site now referred to as the Hertfordshire Campus.
|
|
15.96 miles
|
Equinix: Hertfordshire Expansion
|
|
|
16.12 miles
|
Computacenter: Hertfordshire
|
|
|
16.31 miles
|
Reef Origin: Elevate Quarter 2
|
This facility is part of Reef Origin's Elevate Quarter Campus in Stevenage, UK.
|
|
16.40 miles
|
Reef Origin: Elevate Quarter 1
|
The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.
|
|
16.49 miles
|
ServerChoice: Stevenage
|
Opened in 2008 to great acclaim, Stevenage Data Centre was ServerChoice’s first facility and has been operating continuously with 100% uptime.
|
|
16.77 miles
|
Infinity SDC HereEast
|
Infinity SDC planned a large data center inside Here East, the former Olympic broadcast centre on the Queen Elizabeth Olympic Park. Infinity sold the space to the V&A in 2018 before the data center was completed, and it now forms part of V&A East.
|
|
16.79 miles
|
Nigsun: Stevenage NCS1
|
The Nigsun Datacentre NCS1 is a Tier 3-standard, carrier-neutral facility located in the A1 corridor of Stevenage, designed to host mission-critical IT infrastructure for cloud providers and enterprises.
|
|
16.87 miles
|
Tritax: Blackwater BW1
|
Tritax Big Box is planning to develop a new hyperscale data center campus in Essex, located approximately 35 miles northeast of London.
|
|
16.94 miles
|
Tritax: Blackwater BW2
|
This facility is part of Tritax's Blackwater project in Chelmsford, UK.
|
|
17.28 miles
|
Digital Reef: East Havering Campus
|
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.
|
|
17.46 miles
|
Fujitsu: London North STE04
|
Located in Stevenage, the Fujitsu London North (STE04) facility is a landmark high-resiliency data center that serves as a core hub for Fujitsu’s UK digital infrastructure.
|
|
18.21 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
|
18.39 miles
|
L&G: Bidder Street, Newham
|
A consented hyperscale data center site on a former scrap yard in Bidder Street, Canning Town. Legal & General and Goldacre Ventures developed it with sineQN; Newham approved 80 MW of IT in December 2024, and the site was sold to an unnamed buyer in October 2026.
|
|
18.50 miles
|
IP House: London
|
|
|
18.50 miles
|
Stratus: Belvedere
|
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
|
|
18.77 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
|
18.83 miles
|
Verizon London THW
|
|
|
18.84 miles
|
Telehouse West Two
|
Telehouse West Two is a nine-storey data centre under construction on Telehouse's Docklands campus in East London, built for high-density AI and colocation workloads.
|
|
18.86 miles
|
EXA: London GS2
|
|
|
18.86 miles
|
Global Switch: London East
|
Global Switch London East was the largest purpose-built data center in Europe, offering 450,000 sq ft of net technical space across 11 floors (700,000 sq ft gross).
|
|
18.88 miles
|
Global Switch: London North
|
Global Switch London North is a retrofit of the former Financial Times printing works. It first opened as a data center in late 1999, at the height of the "dot-com" boom.
|
|
18.89 miles
|
Colt: London East India Dock
|
|
|
18.91 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
|
18.96 miles
|
Telehouse: Inventory Estate
|
|
|
18.97 miles
|
Carrier-Neutral (Telco-Owned) Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.10 miles
|
ADA: LCY12
|
LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.
|
|
19.12 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
|
19.13 miles
|
ADA: LCY13
|
LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.
|
|
19.16 miles
|
ADA: LCY11
|
LCY11 is the first of three buildings on Ada Infrastructure's Docklands campus in West Silvertown: a seven-storey, 64,203 m2 data center facing the Thames, with ten data halls on floors 2 to 6. McLaren Construction broke ground in February 2026.
|
|
19.30 miles
|
Truman Estates: Truman Brewery DC, London
|
A new data center approved by the UK government as part of the wider Truman Brewery redevelopment on Brick Lane, London, replacing a derelict cold store behind the main brewery complex. The scheme was approved centrally in July 2026 after Tower Hamlets Council failed to determine the applications.
|
|
19.31 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
19.33 miles
|
ChunkyChips: Essex DC1
|
|
|
19.33 miles
|
Digital Realty: LON2
|
Digital Realty LON2 is a colocation data centre in Block C at 11 Hanbury Street, Shoreditch, built by Interxion in 2012 on the Truman Brewery estate.
|
|
19.34 miles
|
Epsilon London Telephone House
|
|
|
19.36 miles
|
Intercity: Elstree
|
Intercity Technology's Elstree hosting centre is at Regent House, Allum Gate, Borehamwood, inherited from Imerja.
|
|
19.38 miles
|
Digital Realty: LON3
|
Digital Realty LON3 is a colocation data centre in Block D at 11 Hanbury Street, Shoreditch, opened by Interxion in 2019 across the road from LON1.
|
|
19.39 miles
|
Six Degrees: London (Interxion LON3)
|
|
|
19.40 miles
|
Internap London
|
Former INAP (Internap) colocation suite inside the Digital Realty LON1 data centre at 11 Hanbury Street, Shoreditch. HorizonIQ, INAP's successor, no longer operates there.
|
|
19.41 miles
|
Digital Realty: LON1
|
Digital Realty LON1 is a carrier-neutral colocation data centre in Block B at 11 Hanbury Street, Shoreditch, the original Interxion London site on the Truman Brewery estate.
|
|
19.43 miles
|
1 Olivers Yard - Digital Realty
|
Oliver's Yard (LHR18) is a Digital Realty colocation data centre on City Road in London's Shoreditch tech district, formerly a Globix and Telecity site.
|
|
19.43 miles
|
Stellanor: London North Goswell Road
|
The Stellanor London North data center is one of the most historically significant and well-connected digital hubs in London.
|
|
19.43 miles
|
Stellanor: London City
|
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
|
19.47 miles
|
iomart DC2 London
|
iomart's Central London data center occupies City House at 16-22 Epworth Street in Shoreditch, close to the City. It offers about 1,517 m2 of space for iomart's managed hosting, cloud and colocation customers.
|
|
19.49 miles
|
Telehouse London Metro
|
Telehouse Metro was a small colocation data center at 65 Clifton Street in Shoreditch, just north of Liverpool Street, that Telehouse opened in 1997 to serve customers in the City. Telehouse closed Metro by the end of 2020 and now serves London from its Docklands campus.
|
|
19.51 miles
|
nLighten: London Citi
|
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
|
19.63 miles
|
Six Degrees: Anchorage Point
|
The data center was originally established by BIS Ltd (which Six Degrees acquired in 2013) and underwent a significant refurbishment to Tier 3 standards.
|
|
19.65 miles
|
Digital Meridian Gate (215 Marsh)
|
Former Digital Realty LHR21 data centre at 215 Marsh Wall in London Docklands, also known as Meridian Gate, Memaco House and Pennine House. Digital Realty closed the facility around 2022 to 2023.
|
|
19.70 miles
|
Digital Sovereign House (227 Marsh Wall)
|
Sovereign House (LHR20) is a Digital Realty carrier-neutral colocation data centre at 227 Marsh Wall in London Docklands, one of the area's most connected interconnection sites.
|
|
19.71 miles
|
Equinix: London LD1
|
|
|
19.74 miles
|
Coreix Docklands
|
|
|
19.77 miles
|
Verne: London DC01
|
The site originally opened in 2013 as Volta Data Centres (specifically Volta GSS) and was rebranded to Verne Global in 2022 following its acquisition by Digital 9 Infrastructure.
|
|
19.77 miles
|
Volta: LON1
|
Volta's LON1 is a carrier-neutral colocation data center over seven storeys at 36-43 Great Sutton Street in Clerkenwell, central London, built to a Tier III design.
|
|
19.78 miles
|
Verizon London UK5
|
|
|
19.78 miles
|
Stellanor: London East
|
Stellanor London East at 6 Braham Street opened in 1999 as a Level 3 data center and passed to Stellanor in September 2025.
|
|
19.80 miles
|
Arelion: London HEX/A
|
|
|
19.81 miles
|
European Liquidity Center (EULC)
|
ICE Data Services’ state-of-the-art Tier 4 data center in Basildon, Essex, serves as a premier hub for colocation and supporting services.
|
|
19.84 miles
|
Cogent: London LON13
|
|
|
19.85 miles
|
Wavenet: Harbour Exchange
|
|
|
19.86 miles
|
Equinix London LD8 Harbour Exchange (Docklands)
|
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
|
19.86 miles
|
LeaseWeb: London LON-12
|
Leaseweb's LON-12 data center is a Tier III facility strategically located in the heart of London’s Docklands, offering approximately 3,700 m² (nearly 40,000 sq ft) of secure technical space.
|
|
19.86 miles
|
Templus: London LON01
|
Templus London LON01 is a colocation data center in Princes Court on Wapping Lane, east of the City of London. Colt ran it as London City before AtlasEdge bought it in 2021, and Templus took it over with eight other AtlasEdge sites in 2026.
|
|
20.00 miles
|
DRT London (Bonnington House)
|
Bonnington House, now Cloud House West, is a Digital Realty colocation data centre at 47 Millharbour in London Docklands, sold together with Cloud House as LHR19.
|