Ibercom Madrid

Latest Podcast
Calle de María Tubau
Operational
Fully operational facility
Operated by: Ibercom

Ibercom Madrid

Map and Nearby Locations:

Calle de María Tubau
Ibercom Sites
Nearby Facilities

Sites within 15 miles of Ibercom Madrid

Distance Site About
1.49 miles Prime: Madrid
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
1.52 miles Equinix MD3x
1.57 miles Equinix MD5
1.60 miles Equinix MD6
1.63 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
1.85 miles nLighten Madrid-Lezama
1.91 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
1.94 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
1.95 miles AtlasEdge: Madrid MAD001
2.00 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
2.06 miles Equinix Madrid MD2
2.07 miles Equinix Madrid MD1
3.35 miles Espanix Datacenter
3.35 miles Produban Mesena 80
3.98 miles Hyperscale Data Center Request Dataset
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
3.99 miles Cogent Madrid
4.77 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
5.65 miles Digital Realty: MAD4
5.67 miles Hispaweb Miguel Yuste
5.81 miles Grupo Aire OASIX: Madrid
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
5.81 miles Digital Realty: MAD2
5.82 miles Digital Realty: MAD1
5.96 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
6.09 miles Digital Realty: MAD3
6.54 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
6.88 miles Equinix MD4x
6.89 miles Global Switch Madrid
6.92 miles Carrier-Neutral Data Center Request Dataset
Global Switch acquired land next to its current Madrid data centre to build a new 24,000 square metre facility.
6.98 miles BBVA CPD Tres Cantos
7.17 miles IPCore Madrid
7.31 miles Quetta: Tres Cantos
8.51 miles Hyperscale Data Center Request Dataset
8.96 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
9.80 miles inAsset NixMad
9.95 miles Avaio: Madrid Scorpio
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
9.95 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
10.24 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
11.36 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.38 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.41 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.44 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
11.44 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
14.05 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
14.05 miles Hyperscale Data Center Request Dataset
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
14.05 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
14.73 miles Templus: Alcala, Madrid
14.84 miles Hyperscale Data Center Request Dataset
The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.
16.57 miles Form8tion: Madrid One
17.45 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
17.47 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
17.47 miles Hyperscale Data Center Request Dataset
17.58 miles Adam MAD Alcala
18.70 miles Iridium: Carretera Nacional
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
18.88 miles Hyperscale Data Center Request Dataset
18.95 miles Pure DC: Madrid
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.

Ibercom Madrid Data Center Photos (See all)

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by: Ibercom

Ibercom, also known as Másmovil IBERCOM, SA, is an independent telecom operator.

2
Facilities
1
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?