AWS Behind Plans for $750M Data Center in Clinton, Mississippi
March 06, 2026
Amazon AWS
| Distance | Site | About |
|---|---|---|
| 0.08 miles | Hyperscale Data Center Request Dataset | |
| 0.11 miles | Hyperscale Data Center Request Dataset | |
| 0.20 miles | Hyperscale Data Center Request Dataset |
|
| 0.21 miles | TA Realty: Leesburg |
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
| 0.21 miles | Hyperscale Data Center Request Dataset | |
| 0.30 miles | Hyperscale Data Center Request Dataset | |
| 0.42 miles | JK Land: Greenlin Park |
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
| 0.55 miles | JK Land: Greenlin Expansion | |
| 0.60 miles | Luck Stone: Ashburn Expansion | |
| 0.71 miles | Luck Stone: Ashburn |
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
| 0.78 miles | JK Land: Cross Mill Center |
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
| 0.79 miles | Compass Loudoun County |
|
| 1.36 miles | Hyperscale Data Center Request Dataset |
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
| 1.40 miles | Hyperscale Data Center Request Dataset |
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
| 1.75 miles | Tuscarora Crossing Campus |
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
| 1.79 miles | Hyperscale Data Center Request Dataset |
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
| 1.79 miles | SDC Capital: Twin Creeks |
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
| 1.79 miles | Hyperscale Data Center Request Dataset |
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
| 1.80 miles | CyrusOne: Broadlands Expansion | |
| 1.84 miles | CyrusOne: Broadlands Boulevard |
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
| 2.10 miles | Stack: NVA06B |
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
| 2.26 miles | Stack: Northern Virginia, NVA06 |
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
| 2.31 miles | Belmont Innovation Campus |
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
| 2.61 miles | Vantage: VA33 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 2.66 miles | Vantage: VA32 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 2.68 miles | Springfield East: Leesburg, VA |
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
| 2.72 miles | Vantage VA3 Campus |
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
| 2.73 miles | Vantage: VA37 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 2.79 miles | JK Land: Freedom Trail Rd |
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
| 2.81 miles | Vantage: VA35 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 2.82 miles | Vantage: VA36 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 2.86 miles | Active Infra: Spring Valley Tech Park |
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
|
| 2.86 miles | Active Infra: Spring Valley Expansion | |
| 2.87 miles | Vantage: VA34 |
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
| 3.28 miles | Hyperscale Data Center Request Dataset | |
| 3.64 miles | JK Land: Ashburn |
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
| 4.18 miles | QTS Ashburn (Carpathia) |
QTS acquired this site via the Carpathia acquisition in 2015
|
| 4.18 miles | DataBank Ashburn IAD3 | |
| 4.21 miles | DataBank Ashburn IAD4 |
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
| 4.27 miles | FastServ Ashburn | |
| 4.28 miles | Databank Ashburn IAD1 |
In December 2020, Databank acquired the site from Zayo.
|
| 4.29 miles | DataCanopy: Ashburn 1 |
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
| 4.37 miles | NTT: VA8 | |
| 4.40 miles | Sabey: Intergate.Ashburn (Building B) |
|
| 4.41 miles | Hyperscale Data Center Request Dataset |
Amazon plans to build another data center in Loudoun County.
|
| 4.43 miles | Sabey Intergate.Ashburn |
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
| 4.50 miles | NTT: VA9 | |
| 4.50 miles | NTT VA4 | |
| 4.54 miles | Sabey Intergate.Ashburn (Building A) |
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
| 4.54 miles | NTT VA5 |
|
| 4.59 miles | NTT: VA6 |
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
| 4.62 miles | NTT Ashburn Campus | |
| 4.63 miles | 43790 Devin Shafron (Bldg E) | |
| 4.65 miles | Hyperscale Data Center Request Dataset | |
| 4.66 miles | 43791 Devin Shafron (Bldg D) | |
| 4.69 miles | Equinix DC13 |
|
| 4.71 miles | Deft: DRT-IAD1 | |
| 4.71 miles | 43830 Devin Shafron (Bldg F) | |
| 4.71 miles | NTT: VA7 |
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
| 4.72 miles | NTT VA3 |
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
| 4.74 miles | CloudHQ: LC5 |
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
| 4.75 miles | 43831 Devin Shafron (Bldg C) | |
| 4.77 miles | Aligned IAD02 |
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
| 4.78 miles | CloudHQ: LC11 |
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
| 4.82 miles | Aligned Ashburn |
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
| 4.84 miles | CloudHQ: LC12 |
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
| 4.85 miles | CloudHQ: LC14 |
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
| 4.85 miles | 43881 Devin Shafron (Bldg B) | |
| 4.87 miles | 43915 Devin Shafron (Bldg A) | |
| 4.88 miles | Hyperscale Data Center Request Dataset |
|
| 4.90 miles | CloudHQ: LC13 |
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
| 4.90 miles | Rackspace Ashburn IAD3 | |
| 4.90 miles | 44461 Chilum (ACC6) Digital Realty |
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
| 4.91 miles | Digital Realty Loudoun Ashburn Campus |
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
| 4.91 miles | Quantum Connect: Ashburn, VA |
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
| 4.92 miles | 21625 Gresham (ACC7) Digital Realty |
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
| 4.95 miles | 44521 Hastings (ACC5) Digital Realty |
|
| 4.96 miles | Hyperscale Data Center Request Dataset |
|
| 4.99 miles | 44470 Chillum - Digital Realty |
|
| 5.00 miles | Equinix Ashburn DC3 |
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
| 5.01 miles | Hyperscale Data Center Request Dataset |
|
| 5.01 miles | 21745 Sir Timothy (ACC9) Digital Realty |
|
| 5.03 miles | 43940 Digital Loudoun Plaza (Bldg G) | |
| 5.03 miles | 43780 Digital Loudoun Plaza (Bldg H) | |
| 5.05 miles | 44480 Hastings (ACC4) Digital Realty |
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
| 5.07 miles | Hyperscale Data Center Request Dataset | |
| 5.08 miles | NTT VA2 | |
| 5.09 miles | 44490 Chilum (ACC2): Digital Realty | |
| 5.11 miles | 21744 Sir Timothy Drive (ACC10) | |
| 5.12 miles | 44520 Hastings (ACC3) Digital Realty |
|
| 5.12 miles | 44100 Digital Loudoun Plaza (Bldg J) | |
| 5.13 miles | Equinix Ashburn DC4 | |
| 5.14 miles | 44372 Round Table: Digital Realty | |
| 5.15 miles | 44060 Digital Loudoun Plaza (Bldg K) | |
| 5.16 miles | Lumen Ashburn | |
| 5.18 miles | Cologix Ashburn ASH1 |
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
| 5.18 miles | Equinix Ashburn DC5 | |
| 5.19 miles | CloudHQ: LC10 |
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
| 5.19 miles | Hyperscale Data Center Request Dataset | |
| 5.20 miles | 44274 Round Table (Bldg L) |
|
| 5.21 miles | Hyperscale Data Center Request Dataset | |
| 5.23 miles | Cologix: ASH1-N |
This facility is part of Cologix ASH1 campus in Ashburn.
|
| 5.24 miles | Hyperscale Data Center Request Dataset |
|
| 5.25 miles | Equinix Ashburn DC1 | |
| 5.26 miles | Equinix Ashburn DC2 |
The heart of interconnection in Ashburn
|
| 5.27 miles | CloudHQ: LC4 |
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
| 5.27 miles | NTT VA1 |
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
| 5.27 miles | Equinix Ashburn Campus |
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
| 5.27 miles | DataCanopy: Ashburn 2 |
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
| 5.27 miles | CloudHQ LC2 |
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
| 5.28 miles | CloudHQ Ashburn Campus |
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
| 5.29 miles | Equinix: DC17 |
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
| 5.29 miles | Lightedge: Ashburn |
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
| 5.30 miles | Equinix: DC18 |
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
| 5.31 miles | CloudHQ: LC9 |
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
| 5.32 miles | Visa Eastern US Ashburn |
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
| 5.34 miles | Equinix Ashburn DC11 | |
| 5.34 miles | Equinix Ashburn DC6 | |
| 5.35 miles | QTS Ashburn-Shellhorn | |
| 5.36 miles | Equinix DC16 |
|
| 5.37 miles | Centersquare: Ashburn WDC1 |
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
| 5.37 miles | CloudHQ: LC1B |
|
| 5.38 miles | QTS Ashburn-Shellhorn DC2 | |
| 5.39 miles | CloudHQ: LC3 |
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
| 5.39 miles | Hyperscale Data Center Request Dataset | |
| 5.41 miles | Digital Realty: 21561 Beaumeade Cir |
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
| 5.44 miles | Cologix: Ashburn ASH2 |
Cologix has acquired 38 acres in Ashburn’s "Data Center Alley" for a new AI-ready interconnection hub.
|
| 5.45 miles | Hyperscale Data Center Request Dataset |
|
| 5.46 miles | CloudHQ: LC8 |
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
| 5.47 miles | Digital Realty: IAD-56 |
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
| 5.49 miles | Import Plz, Ashburn | |
| 5.50 miles | Hyperscale Data Center Request Dataset | |
| 5.50 miles | Equinix Ashburn DC10 |
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
| 5.51 miles | Equinix Ashburn DC12 |
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
| 5.51 miles | Equinix DC15 | |
| 5.55 miles | 44751 Round Table (Bldg P) | |
| 5.56 miles | Hyperscale Data Center Request Dataset |
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
| 5.58 miles | PowerHouse ABX1 |
|
| 5.58 miles | Cyrusone: Beaumeade Circle |
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
| 5.59 miles | Hyperscale Data Center Request Dataset |
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
| 5.60 miles | Equinix: DC22 |
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
| 5.62 miles | Hyperscale Data Center Request Dataset | |
| 5.65 miles | Equinix DC21 | |
| 5.66 miles | 44351 Import Plz | |
| 5.66 miles | Hyperscale Data Center Request Dataset | |
| 5.69 miles | Washington Commanders: Ashburn, VA |
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
| 5.70 miles | Hyperscale Data Center Request Dataset | |
| 5.70 miles | H5 Ashburn |
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
| 5.71 miles | Hyperscale Data Center Request Dataset | |
| 5.77 miles | Stack: NVA04C |
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
| 5.82 miles | Stack: NVA04B |
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
| 5.83 miles | Hyperscale Data Center Request Dataset | |
| 5.84 miles | Hyperscale Data Center Request Dataset | |
| 5.87 miles | Stack: Northern Virginia NVA04 |
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
| 5.93 miles | Sentinel Washington Dulles Gateway |
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
| 6.05 miles | Corscale: Kincora |
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
| 6.08 miles | Dulles 28 Centre Motorplex |
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
| 6.09 miles | Digital Realty: Broderick Drive | |
| 6.10 miles | Digital Realty: IAD43 | |
| 6.15 miles | 21641 Charles View | |
| 6.18 miles | Hyperscale Data Center Request Dataset | |
| 6.21 miles | Hyperscale Data Center Request Dataset | |
| 6.21 miles | 21710 Charles View | |
| 6.21 miles | QTS: ASH2 DC2 |
DC2 is the second building of Ashburn's Lockridge ASH2 Campus.
|
| 6.22 miles | PowerHouse: Pacific Bldg C |
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
| 6.22 miles | DataCanopy: Sterling, VA |
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
| 6.23 miles | CyrusOne: NVA7 |
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
| 6.23 miles | PowerHouse: Pacific Bldg B |
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
| 6.25 miles | QTS Ashburn Lockridge |
QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
|
| 6.26 miles | Dulles 28 Technology Park |
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
| 6.26 miles | PowerHouse Pacific |
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
| 6.27 miles | CyrusOne Northern Virginia Sterling V | |
| 6.30 miles | Hyperscale Data Center Request Dataset | |
| 6.33 miles | QTS Ashburn 1 |
There is 2.66 MW of Critical Power per Data Hall
|
| 6.34 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
| 6.34 miles | Hyperscale Data Center Request Dataset |
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
| 6.39 miles | Hyperscale Data Center Request Dataset | |
| 6.41 miles | Hyperscale Data Center Request Dataset |
|
| 6.41 miles | Hyperscale Data Center Request Dataset |
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
| 6.44 miles | Paragon Park Lot 3B |
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
| 6.47 miles | STACK Northern Virginia |
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
| 6.52 miles | Stack: Loudoun County Campus |
Stack Infrastructure is further expanding in Virginia with a new 122-acre campus in Loudoun County, near Dulles Airport.
|
| 6.52 miles | Hyperscale Data Center Request Dataset |
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
| 6.53 miles | Menlo: MD-DC2 (Sterling) |
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
| 6.53 miles | Hyperscale Data Center Request Dataset | |
| 6.55 miles | Stack: Loudoun 2 |
This facility is part of Stack's Loudoun County Campus is Virginia.
|
| 6.61 miles | Vantage VA13 | |
| 6.62 miles | QTS Ashburn-Moran |
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
| 6.65 miles | Vantage VA14 | |
| 6.66 miles | EdgeCore: Ashburn AS02 |
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
| 6.66 miles | PointOne: IAD2 |
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
| 6.68 miles | Vantage VA15 |
In July 2025, Vantage completed the topping out of the fifth building at its data center campus in Ashburn, Loudoun County, Virginia.
|
| 6.70 miles | Hyperscale Data Center Request Dataset |
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
| 6.71 miles | Hyperscale Data Center Request Dataset | |
| 6.72 miles | Sentinel: Cloud Plaza, Sterling, VA |
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
| 6.73 miles | Vantage VA16 | |
| 6.73 miles | PointOne: Ashburn |
The campus will have 2 buildings
|
| 6.73 miles | Vantage VA12 | |
| 6.74 miles | JK Land: Tech Park 1 Expansion | |
| 6.75 miles | Vantage Ashburn Campus |
The first phase of the campus was completed in Q1 of 2019.
|
| 6.76 miles | Hyperscale Data Center Request Dataset | |
| 6.77 miles | Hyperscale Data Center Request Dataset | |
| 6.80 miles | Skybox Northern Virginia |
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
| 6.80 miles | Prologis: Sterling, VA |
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
| 6.82 miles | JK Land: Technology Park 1 |
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
| 6.87 miles | CyrusOne: NVA9 Bldg 1B |
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
| 6.87 miles | Hyperscale Data Center Request Dataset | |
| 6.94 miles | CyrusOne: NVA9 Bldg 2 |
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
| 6.94 miles | CyrusOne Sterling IX |
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
| 6.95 miles | Digital Realty Dulles Expansion |
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
| 6.97 miles | COPT: 45771 Maries Rd |
|
| 6.97 miles | Hyperscale Data Center Request Dataset | |
| 7.01 miles | Hyperscale Data Center Request Dataset | |
| 7.01 miles | Hyperscale Data Center Request Dataset | |
| 7.01 miles | Digital Realty: IAD44 |
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
| 7.02 miles | Prologis: Executive Drive |
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
| 7.05 miles | COPT: 45761 Maries Rd |
|
| 7.05 miles | Hyperscale Data Center Request Dataset | |
| 7.05 miles | Hyperscale Data Center Request Dataset | |
| 7.08 miles | Hyperscale Data Center Request Dataset |
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
| 7.09 miles | Hyperscale Data Center Request Dataset |
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
| 7.14 miles | Hyperscale Data Center Request Dataset | |
| 7.15 miles | Hyperscale Data Center Request Dataset | |
| 7.15 miles | Hyperscale Data Center Request Dataset |
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
| 7.17 miles | Aligned IAD03 |
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
| 7.18 miles | Hyperscale Data Center Request Dataset |
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
| 7.18 miles | Hyperscale Data Center Request Dataset | |
| 7.19 miles | Yondr Arcola, VA |
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
| 7.20 miles | Hiddenwood Assemblage Campus |
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
| 7.21 miles | Hyperscale Data Center Request Dataset |
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
| 7.22 miles | Hyperscale Data Center Request Dataset | |
| 7.22 miles | Hyperscale Data Center Request Dataset | |
| 7.22 miles | Hyperscale Data Center Request Dataset |
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
| 7.22 miles | Hyperscale Data Center Request Dataset |
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
| 7.23 miles | Vantage: VA22 |
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
| 7.23 miles | Hyperscale Data Center Request Dataset | |
| 7.24 miles | CyrusOne Northern Virginia Sterling I, II, III | |
| 7.24 miles | Centersquare: Sterling DC3 |
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
| 7.25 miles | Hyperscale Data Center Request Dataset | |
| 7.26 miles | Vantage VA2 Campus |
On 18.6 acres east of Route 28 in Sterling, Virginia, Vantage Data Centers is developing its VA2 campus.
|
| 7.26 miles | JK Land: Technology Park 2 |
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
| 7.27 miles | Yondr Arcola Bldg 2 |
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
| 7.29 miles | Digital Realty: IAD55 |
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
| 7.29 miles | Hyperscale Data Center Request Dataset | |
| 7.30 miles | Hyperscale Data Center Request Dataset |
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
| 7.31 miles | Hyperscale Data Center Request Dataset | |
| 7.32 miles | Vantage: VA23 |
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
| 7.34 miles | Hyperscale Data Center Request Dataset |
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
| 7.35 miles | EdgeCore Ashburn |
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
| 7.35 miles | Hyperscale Data Center Request Dataset |
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
| 7.36 miles | Yondr: Arcola Expansion |
Yondr is planning to expand capacity on an adjacent parcel of land.
|
| 7.36 miles | Centersquare: Dulles IAD3 |
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
| 7.36 miles | Centersquare: Sterling DC2 |
|
| 7.37 miles | 21110 Ridgetop |
The site is fully leased to triple net tenants.
|
| 7.38 miles | Hyperscale Data Center Request Dataset | |
| 7.38 miles | Prologis: Global Plaza Rd |
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
| 7.40 miles | Hyperscale Data Center Request Dataset | |
| 7.40 miles | Hyperscale Data Center Request Dataset | |
| 7.40 miles | CyrusOne Sterling VIII | |
| 7.40 miles | JK Land: Technology Park 3 |
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
| 7.40 miles | Centersquare: Sterling DC4 |
|
| 7.41 miles | Hyperscale Data Center Request Dataset |
|
| 7.48 miles | Hyperscale Data Center Request Dataset | |
| 7.49 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
| 7.52 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
| 7.60 miles | PowerHouse: Arcola Bldg B |
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
| 7.61 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
| 7.61 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
| 7.63 miles | PowerHouse Arcola |
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
| 7.64 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
| 7.72 miles | Hyperscale Data Center Request Dataset |
|
| 7.73 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
| 7.77 miles | Hyperscale Data Center Request Dataset | |
| 7.82 miles | Hyperscale Data Center Request Dataset | |
| 7.97 miles | CyrusOne Northern Virginia Sterling IV | |
| 8.04 miles | Hyperscale Data Center Request Dataset | |
| 8.05 miles | Centersquare: IAD2-B |
|
| 8.06 miles | Connect Data Centers: Sterling, VA | |
| 8.07 miles | Centersquare: IAD2-A |
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
| 8.11 miles | Hyperscale Data Center Request Dataset | |
| 8.18 miles | Hyperscale Data Center Request Dataset | |
| 8.32 miles | Dulles 2000 Campus |
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
| 8.36 miles | Peterson: Silverbrook |
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
| 8.44 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
| 8.44 miles | Hyperscale Data Center Request Dataset | |
| 8.45 miles | Hyperscale Data Center Request Dataset | |
| 8.46 miles | Hyperscale Data Center Request Dataset | |
| 8.49 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
| 8.54 miles | Hyperscale Data Center Request Dataset | |
| 8.56 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
| 9.60 miles | Hyperscale Data Center Request Dataset | |
| 9.68 miles | Hyperscale Data Center Request Dataset | |
| 9.68 miles | Hyperscale Data Center Request Dataset |
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
| 9.74 miles | Hyperscale Data Center Request Dataset | |
| 9.76 miles | Hyperscale Data Center Request Dataset | |
| 9.77 miles | Hyperscale Data Center Request Dataset | |
| 9.81 miles | Hyperscale Data Center Request Dataset | |
| 9.83 miles | Hyperscale Data Center Request Dataset | |
| 9.96 miles | Hyperscale Data Center Request Dataset | |
| 9.96 miles | Hyperscale Data Center Request Dataset | |
| 9.96 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
| 10.00 miles | Hyperscale Data Center Request Dataset | |
| 10.10 miles | Hyperscale Data Center Request Dataset | |
| 10.13 miles | Hyperscale Data Center Request Dataset | |
| 10.25 miles | Hyperscale Data Center Request Dataset | |
| 10.25 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
| 10.36 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
| 10.37 miles | Hyperscale Data Center Request Dataset |
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
| 10.48 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
| 10.62 miles | IBM Softlayer Chantilly WDC01 | |
| 10.63 miles | Aptum Herndon |
The site was originally a Peer 1 site before the Cogeco acquisition.
|
| 10.65 miles | Lumen Herndon 1 | |
| 10.66 miles | Lumen Herndon 3 | |
| 10.67 miles | Lafayette Center Drive Campus - Digital Realty |
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
| 10.84 miles | Cogent: 510 Huntmar |
Cogent exited the data center and it is currently available to lease.
|
| 10.88 miles | Menlo: MD-DC1 (Herndon) |
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
| 10.98 miles | H5: Herndon |
|
| 11.00 miles | Hyperscale Data Center Request Dataset |
|
| 11.02 miles | Lincoln Rackhouse 251 Exchange |
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
| 11.06 miles | Hyperscale Data Center Request Dataset | |
| 11.07 miles | Hyperscale Data Center Request Dataset | |
| 11.14 miles | Hyperscale Data Center Request Dataset | |
| 11.16 miles | Penzance: Chantilly Premier |
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
| 11.18 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
| 11.21 miles | Hyperscale Data Center Request Dataset |
|
| 11.36 miles | Hyperscale Data Center Request Dataset |
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
| 11.44 miles | Hyperscale Data Center Request Dataset |
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
| 11.72 miles | Hyperscale Data Center Request Dataset |
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
| 11.78 miles | CoreSite Reston VA3 |
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
| 11.79 miles | Hyperscale Data Center Request Dataset |
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
| 11.82 miles | Hyperscale Data Center Request Dataset |
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
| 11.99 miles | CoreSite VA2 |
|
| 12.01 miles | Contegix Reston |
The Contegix site is on CoreSite's Reston Campus
|
| 12.01 miles | CoreSite Reston Campus VA1 |
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
| 13.17 miles | Parkstone Tech Park | |
| 13.47 miles | Lincoln Rackhouse 1807 Michael Faraday |
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
| 13.65 miles | Evocative: Virginia, IAD1 |
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
| 13.76 miles | 1780 Business Center Drive (VA3) Digital Realty |
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
| 14.29 miles | QTS: Prince William Digital Gateway Campus |
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
| 15.57 miles | Compass: Prince William Digital Gateway Campus |
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
| 17.28 miles | Verizon: 7777 Infantry Ridge |
Former AOL data center
|
| 17.35 miles | Hyperscale Data Center Request Dataset | |
| 17.39 miles | Hyperscale Data Center Request Dataset | |
| 17.40 miles | Equinix Manassas DC14 |
|
| 17.42 miles | Hyperscale Data Center Request Dataset | |
| 17.47 miles | CorScale: Gainesville 5 |
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
| 17.47 miles | Corscale: Gainesville Crossing |
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
| 17.48 miles | Hyperscale Data Center Request Dataset | |
| 17.55 miles | CorScale: Gainesville 4 |
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
| 17.61 miles | Hyperscale Data Center Request Dataset |
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
| 17.62 miles | Hyperscale Data Center Request Dataset |
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
| 17.65 miles | CorScale: Gainesville 2 |
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
| 17.65 miles | Aligned: Manassas, VA |
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
| 17.67 miles | Hyperscale Data Center Request Dataset |
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
| 17.68 miles | John Marshall Commons Tech Park |
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
| 17.69 miles | CorScale: Gainesville 3 |
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
| 17.77 miles | NTT: VA13 |
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
| 17.82 miles | Hyperscale Data Center Request Dataset |
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
| 17.82 miles | NTT: VA12 |
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
| 17.83 miles | Hyperscale Data Center Request Dataset |
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
| 17.85 miles | NTT: VA11 |
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
| 17.87 miles | Hyperscale Data Center Request Dataset |
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
| 17.89 miles | NTT Gainesville VA Campus |
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
| 17.91 miles | Hyperscale Data Center Request Dataset |
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
| 18.00 miles | Hyperscale Data Center Request Dataset |
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
| 18.07 miles | Hyperscale Data Center Request Dataset |
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
| 18.07 miles | Hyperscale Data Center Request Dataset | |
| 18.09 miles | Hyperscale Data Center Request Dataset |
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
| 18.12 miles | Hyperscale Data Center Request Dataset |
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
| 18.14 miles | Hyperscale Data Center Request Dataset | |
| 18.14 miles | Hyperscale Data Center Request Dataset |
|
| 18.14 miles | Hyperscale Data Center Request Dataset | |
| 18.15 miles | Hyperscale Data Center Request Dataset | |
| 18.16 miles | Hyperscale Data Center Request Dataset |
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
| 18.16 miles | Gardner Property Project |
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
| 18.19 miles | Hyperscale Data Center Request Dataset | |
| 18.20 miles | Hyperscale Data Center Request Dataset | |
| 18.22 miles | Hyperscale Data Center Request Dataset |
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
| 18.23 miles | Hyperscale Data Center Request Dataset | |
| 18.27 miles | Hyperscale Data Center Request Dataset | |
| 18.35 miles | Hyperscale Data Center Request Dataset | |
| 18.38 miles | Hyperscale Data Center Request Dataset |
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
| 18.41 miles | Hyperscale Data Center Request Dataset |
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
| 18.45 miles | Equinix Vienna DC8 | |
| 18.52 miles | Hyperscale Data Center Request Dataset | |
| 18.59 miles | Iron Mountain: Manassas Point |
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
| 18.64 miles | Hyperscale Data Center Request Dataset |
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
| 18.73 miles | BlackChamber: Gainesville, VA |
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
| 18.83 miles | Rowan: Frederick 1 Campus |
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
|
| 18.84 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) is set to significantly expand its data center operations by establishing a new presence in Frederick, Maryland.
|
| 18.89 miles | Hyperscale Data Center Request Dataset | |
| 18.93 miles | Hyperscale Data Center Request Dataset |
|
| 18.95 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
| 18.95 miles | Rowan: Frederick 2D |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
| 18.96 miles | Rowan: Frederick 2C |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
| 18.96 miles | Hyperscale Data Center Request Dataset |
|
| 18.96 miles | Rowan: Frederick 1C |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
| 19.00 miles | Hyperscale Data Center Request Dataset |
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
| 19.01 miles | Hyperscale Data Center Request Dataset |
|
| 19.01 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's BWI- 150 campus in Maryland.
|
| 19.02 miles | Rowan: Frederick 1B |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
| 19.05 miles | Iron Mountain Northern Virginia (Manassas) |
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
| 19.06 miles | Hyperscale Data Center Request Dataset | |
| 19.09 miles | Rowan: Frederick 2B |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
| 19.10 miles | Hyperscale Data Center Request Dataset | |
| 19.12 miles | Iron Mountain VA-2 | |
| 19.17 miles | Rowan: Frederick 2 Campus |
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
|
| 19.18 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
| 19.20 miles | Rowan: Frederick 1D |
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
| 19.21 miles | Iron Mountain: VA-3 |
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
| 19.24 miles | Iron Mountain: VA-7 |
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
| 19.25 miles | Hyperscale Data Center Request Dataset |
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
| 19.26 miles | Hyperscale Data Center Request Dataset |
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
| 19.28 miles | Yondr Bristow Campus |
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
| 19.29 miles | Iron Mountain: VA-4 |
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
| 19.33 miles | Opus Interactive Manassas | |
| 19.39 miles | 8217 Linton Hall (VA4) Digital Realty |
|
| 19.40 miles | Iron Mountain: VA-5 |
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
| 19.41 miles | Yondr: Bristow Bldg 2 |
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
| 19.50 miles | Rowan: Frederick 3C |
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
| 19.54 miles | Iron Mountain: VA-8 |
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
| 19.56 miles | Hyperscale Data Center Request Dataset |
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
| 19.58 miles | Rowan: Frederick 3 Campus |
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
|
| 19.62 miles | Cogent Vienna | |
| 19.65 miles | Rowan: Frederick 3B |
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
| 19.65 miles | Hyperscale Data Center Request Dataset |
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
| 19.66 miles | 8100 Boone - Digital Realty |
|
| 19.74 miles | Aligned: Maryland Campus IAD04 |
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
|
| 19.75 miles | JK Land: Hunter Trust |
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
| 19.77 miles | Iron Mountain: VA-6 |
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
| 19.83 miles | Aligned: IAD04 Bldg2 |
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
| 19.89 miles | Aligned: IAD04 Bldg3 |
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
| 19.94 miles | Hyperscale Data Center Request Dataset |
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
| 19.97 miles | TPG Real Estate: Frederick Expansion | |
| 19.97 miles | TPG Real Estate: Frederick Campus |
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
|
| 19.99 miles | Hyperscale Data Center Request Dataset | |
| 20.00 miles | Aligned: IAD04 Bldg4 |
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
March 06, 2026
Amazon AWS
February 05, 2026
Amazon AWS
February 04, 2026
Amazon AWS
January 30, 2026
Amazon AWS
January 24, 2026
Amazon AWS
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas