Texas Data Center Market

Latest Podcast

The Texas data center market is located in the region of South Central US and within United States. Texas has 802 facilities.

The top providers in Texas are Crusoe (15 sites) and Hut 8 Corp with 6 facilities . The most popular facilities are Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy and CyrusOne Carrollton.

Read More

Market Facts

Texas Data Center Map

Texas Power Growth Over Time

+138% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Texas

Crusoe
Site
Power
Operational
4
526.0
Construction
11
Planned
5
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
15
View Provider
Hut 8 Corp
Site
Power
Operational
5
816.0
Construction
1
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
Google
Site
Power
Operational
4
175.0
Construction
10
Planned
8
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
3
Decommissioned
0
Totals
14
View Provider
CyrusOne
Site
Power
Operational
16
362.5
Construction
9
Planned
9
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
25
View Provider

Largest Data Centers in Texas

Location About Total SqFt Power (MW)
IREN: Childress, TX
The site is directly connected to the ERCOT electricity grid via a 345kV transmission connection ...
NN Request Dataset
RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
BitDeer: Rockdale, TX
Bitdeer operates its long-standing Rockdale data center at the former Alcoa industrial complex an...
NN Request Dataset
Serverfarm: Houston HTX1
In 2024, Serverfarm acquired two data centers in Houston, Texas. The HTX1 data center facility s...
NN Request Dataset NN Request Dataset
MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Regions in Texas

Data Center Events in Texas See all

20 events
Event Starts in Details
4 days
View 7x24 Exchange Fall 2026 Conference
Organized by:
7x24 Exchange International
Description:

7x24 Exchange Fall 2026 Conference is the mission-critical industry's semi-annual flagship event, held October 25 to 28 at the JW Marriott San Antonio Hill Country. Organized by 7x24 Exchange International, the non-profit association serving data center and mission-critical operations professionals. The 2026 fall theme is "The Intersection of AI & Traditional Data Centers," framing how existing...

5 days
View Advancing Data Center EHS Construction 2026
Organized by:
Advancing Construction
Type:
Data Center
Description:

Advancing Data Center EHS Construction is a three-day conference on environmental health and safety (EHS) in data center construction and commissioning. It is organized by the Advancing Data Centers division of Hanson Wade Group as part of its Advancing Construction conference series. The event takes place October 26 to 28, 2026, at The Statler Dallas, Curio Collection by Hilton in Dallas, Texa...

12 days
View Data Center Energy Industry Update
Organized by:
The Power Connection
Type:
Data Center Power
Description:

The Data Center Energy Industry Update is a one-day executive conference held November 2, 2026, at The Houstonian in Houston, Texas. Produced by The Power Connection in partnership with the iMasons Texas Local Chapter, the event brings together energy producers, equipment manufacturers, and infrastructure providers alongside data center developers, builders, and tenants working to deploy AI com...

48 days
View Reuters Energy LIVE 2026
Organized by:
Reuters Events
Type:
Data Center Power
Description:

Energy LIVE 2026 is Reuters Events' annual US energy leadership summit, held December 8-9, 2026 at the Marriott Marquis Houston. It brings together utilities, power producers, grid operators, oil, gas and LNG companies, nuclear developers, data center operators, and investors. Reuters Events expects 1,500+ senior attendees and 75+ exhibitors, with projects worth a combined $755 billion represen...

90 days
View Advancing Nuclear Power Construction 2027
Organized by:
Advancing Construction
Type:
Data Center Power
Description:

Advancing Nuclear Power Construction is a three-day technical and executive conference organized by Advancing Construction, a division of Hanson Wade Group. Taking place January 19–21, 2027, at the Hyatt Regency Dallas in Dallas, Texas, the summit gathers more than 60 project owners, EPC contractors, specialty trades, reactor developers, and engineering firms focused on project delivery across ...

96 days
View ERCOT Power NEXT 2027
Organized by:
Infocast
Type:
Data Center Power
Description:

ERCOT Power NEXT is a three-day executive power and energy conference organized by Infocast, taking place January 25–27, 2027, at the Hilton Austin in Austin, Texas. Expanding on Infocast's long-running ERCOT Market Summit, the event convenes more than 800 participants and over 115 speakers across 29 sessions. Attendees include wholesale power generators, electric utilities, ERCOT officials, st...

125 days
View Energy HPC & AI Conference 2027
Organized by:
Rice University Ken Kennedy Institute
Type:
Data Center Enterprise IT
Description:

The Energy HPC & AI Conference is the annual meeting hosted by the Ken Kennedy Institute at Rice University, held February 23–25, 2027 at the BioScience Research Collaborative in Houston, Texas. The 2027 edition marks the conference's 20th year. It is the energy industry's central forum for high-performance computing, computational science and engineering, machine learning, and data science, dr...

133 days
View 2027 ASHRAE Data Center and AI Integration Conference
Organized by:
ASHRAE
Type:
Data Center
Description:

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) holds its first Data Center and AI Integration Conference from March 3 to 5, 2027, at the Hilton Dallas Lincoln Centre by the Galleria in Dallas, Texas. The conference covers how to design, operate, and optimize data center facilities for AI workloads, with a focus on power density, cooling efficiency, and su...

138 days
View CERAWeek 2027
Organized by:
S&P Global
Type:
Data Center Power
Description:

CERAWeek 2027 is S&P Global's annual energy conference, chaired by S&P Global Vice Chairman Daniel Yergin. S&P Global runs it through its S&P Global Energy division, formerly S&P Global Commodity Insights. It runs March 8-12, 2027, in Houston at the Hilton Americas-Houston and the George R. Brown Convention Center. CERAWeek 2026 drew more than 2,470 companies, 2,200 C-suite leaders and 588 gove...

154 days
View RE+ Texas 2027
Organized by:
Solar Energy Industries Association
Type:
Data Center Power
Description:

RE+ Texas is an annual regional clean energy conference and exhibition organized by the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) through RE+ Events. The 2027 edition convenes March 24 to 25, 2027, at the George R. Brown Convention Center in Houston, Texas. Co-located with RE+ Microgrids, the event brings together more than 1,500 clean energy profes...

180 days
View GCPA Spring Conference 2027
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association's Spring 2027 Conference runs April 19 to 21, 2027, at Hilton Americas-Houston. The spring meeting covers ERCOT and Gulf Coast power markets. Registration opens in early 2027. No agenda, speakers, or sponsors are published yet. The 2026 spring conference expected 600+ attendees, citing 650 attendees in 2025. Programming Focus The 2026 edition covered these topic...

181 days
View Energy Storage Summit USA 2027
Organized by:
Informa
Type:
Power
Description:

Energy Storage Summit USA 2027 is the ninth annual executive conference organized by Solar Media (Informa Markets), taking place April 20–21, 2027, at the Renaissance Dallas at Plano Legacy West Hotel in the Dallas metro area. The two-day gathering convenes more than 400 senior decision-makers across the energy storage, electric utility, power generation, and digital infrastructure sectors, foc...

229 days
View Permian Power Conference 2027
Organized by:
The Power Connection
Type:
Data Center Power
Description:

The Permian Power Conference is a two-day executive gathering held June 7–8, 2027, at the Horseshoe Arena in Midland, Texas. Produced by The Power Connection, the conference connects power generators, electric utilities, and oil and gas producers with data center developers, artificial intelligence infrastructure operators, and infrastructure financiers. The forum addresses regional power infra...

314 days
View Datacloud USA x Metro Connect Fall 2027
Organized by:
Datacloud
Type:
Data Center Telecom & Networks
Description:

Datacloud USA x Metro Connect Fall is an executive digital infrastructure conference co-located with Metro Connect Fall, uniting the data center, cloud, and fiber sectors. Organized by Datacloud, the 2027 edition takes place from August 31 through September 2, 2027, at the Fairmont Austin in Austin, Texas, with pre-conference activities opening on August 30. The gathering convenes approximately...

327 days
View ACP RECHARGE: Energy Storage Conference 2027
Organized by:
American Clean Power Association
Type:
Power
Description:

ACP RECHARGE is the annual energy storage conference of the American Clean Power Association (ACP). The 2027 edition takes place September 13 to 15, 2027, at the Austin Marriott Downtown in Austin, Texas. Registration for 2027 has not opened yet. The 2026 edition, held in Aurora, Colorado, drew 600 attendees, more than 75 speakers, and 15 exhibitors. Programming Focus The 2027 program has not b...

328 days
View Gastech 2027
Organized by:
dmg events
Type:
Data Center Power
Description:

Gastech 2027 is an exhibition and conference covering natural gas, LNG, low-carbon solutions, electrification and AI for energy. The organizer is dmg events. It runs September 14-17, 2027, at the George R. Brown Convention Center in downtown Houston. The event site cites 60,000 attendees from 150 countries, 800 exhibiting companies, 800 speakers and 200 sessions across 15 programs. Gastech 2026...

348 days
View GCPA Fall Conference 2027
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association's Fall 2027 Conference runs October 4 to 6, 2027, at the AT&T Hotel & Conference Center in Austin, Texas. It is GCPA's largest yearly meeting on ERCOT and Gulf Coast power markets. Registration opens in summer 2027. No agenda, speakers, or sponsors are published yet. The 2025 fall conference drew 875 attendees, and the 2026 edition projected 850+. Programming Fo...

369 days
View Data Center World Power 2027
Organized by:
AFCOM
Type:
Data Center Power
Description:

Data Center World Power returns to the Gaylord Texan Resort & Convention Center in Grapevine, Texas, from October 25 to 27, 2027. Organised by AFCOM and Informa Connect as part of the broader Data Center World event portfolio, the three-day gathering is dedicated exclusively to the power, energy procurement, and electrical infrastructure challenges facing the data center industry. The event uni...

544 days
View GCPA Spring Conference 2028
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association has scheduled its Spring 2028 Conference for April 17 to 19, 2028, in Houston, Texas. GCPA has not announced a venue, agenda, or registration date. Its 2026 and 2027 spring conferences use Hilton Americas-Houston. The spring meeting covers ERCOT and Gulf Coast power markets. The 2025 spring conference drew 650 attendees. Who Should Attend Data center developers ...

712 days
View GCPA Fall Conference 2028
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association has scheduled its Fall 2028 Conference for October 2 to 4, 2028, in Austin, Texas. GCPA has not announced a venue, agenda, or registration date. Its 2025, 2026, and 2027 fall conferences use the AT&T Hotel & Conference Center. The fall meeting is GCPA's largest, with 875 attendees in 2025. Who Should Attend Data center developers and operators active in Texas Ut...

About This Metro

There are 4 hubs of data center activity in Texas: Dallas Fort Worth, Austin, Houston, and San Antonio. However, the Dallas metro dominates the state.

Related News See all

Read AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana
X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the...

AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana

October 20, 2026 Amazon AWS

X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the plant's output. The companies announced a joint development agreement on Oct. 19 covering...

Read more
Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project e...

Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project east of the city that could reach one gigawatt of capacity. In a joint press release, the partners...

Read more
Read Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse
Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse ...

Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse Data Centers say could support up to one gigawatt. The partners announced the approval in a Business...

Read more
Read AMD Signs Credit Support Deal for Fermi's 222 MW Project Matador
[Fermi America](https://baxtel.com/data-centers/fermi-america) on Tuesday [announced a credit support agreement](https://feeds.issuerdirect.com/news-release.html?newsid=5674092707179103&symbol=FRMI...

AMD Signs Credit Support Deal for Fermi's 222 MW Project Matador

October 14, 2026 Fermi America

Fermi America on Tuesday announced a credit support agreement with chipmaker AMD backing the first phase of its Project Matador energy and AI campus in Carson County, Texas, a 222 MW build the company described as a key milestone toward securing project financing. The deal The agreement supports...

Read more
Read Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus
The first data center building at the 2,842-acre Cedar Creek campus being developed by [Pacifico Energy](https://baxtel.com/data-centers/pacifico-energy) and [BlackChamber Group](https://baxtel.com...

Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus

October 11, 2026 Pacifico Energy

The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?