Switch: Armory Building 2

Latest Podcast 9380 S Decatur Blvd
Planned
Future facility in planning stage
Operated by:

Switch: Armory Building 2

Year Planned: 2027
Floors: 1
Lot Size: 55 acres

Building 2 is planned between the campus’s northern and southern data centers. It would use the same single-story design and internal space allocation as the other two facilities, supported by dedicated equipment yards and shared campus power infrastructure.

Map and Nearby Locations

9380 S Decatur Blvd
Switch Sites
Nearby Facilities

Switch: Armory Building 2 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Switch: Armory Building 2

Distance Site About
0.09 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
0.12 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
2.57 miles Switch Las Vegas 11
2.58 miles Switch Las Vegas 9
2.60 miles Switch Las Vegas 10
2.70 miles Switch Las Vegas 12
2.71 miles Switch Las Vegas 8
2.78 miles Switch Edge 1
2.82 miles Contegix Las Vegas
2.82 miles Switch Las Vegas 7
2.83 miles CoreWeave: US West LAS1
2.85 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
3.23 miles Switch: Las Vegas 15
4.35 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
4.59 miles ColoXchange Las Vegas
4.97 miles Fiberhub - Las Vegas
5.27 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
6.55 miles Verizon: 2240 Corporate Cir
7.70 miles Lumen: Las Vegas 3
9.94 miles ISP.Net DC2
10.49 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
10.49 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
10.85 miles ISP.Net DC1
10.90 miles Flexential Carson I & II
11.17 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
11.17 miles Switch Las Vegas 5
11.18 miles Core RidgeInterested in this information?Contact us
11.24 miles Lumen: Las Vegas 2
11.35 miles Switch Las Vegas 2
12.66 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
15.81 miles Lumen: Las Vegas (1 Aerojet)
16.86 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
16.97 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
19.47 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.

Switch: Armory Building 2 Data Center Photos See all

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

43
Facilities
9
Markets

News See all

Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada
Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada

Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada

May 21, 2026 Nevada

Fleet has begun construction on its first data center facility near Reno, Nevada. Local reports say the company broke ground this week at an event attended by Nevada Governor Joe Lombardo. The project will deliver a 230MW data center on a 256-acre site in Storey County owned by Tract.The Fleet...

Read more
Read Switch Plans New Data Center Campus Near Pittsburgh
Switch Plans New Data Center Campus Near Pittsburgh

Switch Plans New Data Center Campus Near Pittsburgh

May 01, 2026 Switch

US data center firm Switch is planning a new campus outside Pittsburgh, Pennsylvania. The company this week announced plans for a 382-acre development in Big Beaver Borough, Beaver County. The site is located around 40 miles (64km) northwest of Pittsburgh, near the Ohio state border. Full details...

Read more
Read Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

March 16, 2026 Switch

Data center operator Switch has integrated Nvidia’s Omniverse DSX Blueprint into its EVO AI Factory architecture and LDC EVO operating system. The company introduced EVO last year, describing it as a new data center design capable of supporting up to 2MW per rack.LDC EVO is Switch's answer to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?