Data Center Campus

Switch: Armory Campus

3 sites Nevada
Planned
Future facility in planning stage
Operated by:

Campus at a Glance

3 data centers on this campus
First built in 2027 with expansions through 2027
Coordinates: 36.01915, -115.20747
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Building 1 is planned near the northern side of the campus, closest to Serene Avenue. The single-story facility would contain a large data room, staging warehouse and office area, with fenced cooling and electrical equipment yards on both sides.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Switch: Armory Bldg1 Switch
Planned
— — 2027
Switch: Armory Bldg2 Switch
Planned
— — 2027
Switch: Armory Bldg3 Switch
Planned
— — 2027

Map and Nearby Locations

Switch: Armory Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?