0.17 miles
|
Serverfarm: CTX1 DC2
|
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
|
|
0.21 miles
|
Serverfarm: Houston CTX1
|
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
|
|
1.28 miles
|
ViVaVerse: Viva Center
|
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
|
8.07 miles
|
TRG Datacenters: Houston HOU1
|
|
|
8.10 miles
|
TRG Datacenters: HOU2
|
This facility is part of TRG Datacenters' Houston campus in Houston.
|
|
8.42 miles
|
Lumen: Houston 5
|
|
|
9.08 miles
|
Switch: Houston 2
|
Located in Greenspoint, Data Foundry's Houston 2 site is situated on 18 acres in North Houston. There is a large office area available for lease.
|
|
9.15 miles
|
Switch: Houston 3
|
Switch plans to build data center, in its own style, on a 10-acre adjacent land parcel in Houston.
|
|
9.62 miles
|
Lumen Houston 1
|
|
|
9.62 miles
|
Cogent: 12061 N Freeway
|
Cogent's 27,000 sqft data center in Houston offers retail colocation
|
|
9.63 miles
|
12001-12235 North Freeway - Digital Realty
|
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
|
|
9.65 miles
|
Fibertown Houston
|
Fibertown operates a data center in Houston built around 2011.
|
|
9.69 miles
|
11:11 Systems: Houston
|
|
|
10.26 miles
|
Windstream Houston
|
Previously a PAETEC data center
|
|
10.42 miles
|
DataBank Westway Park I
|
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
|
10.42 miles
|
DataBank Westway Park II
|
|
|
10.42 miles
|
Databank Westway Park III
|
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
|
|
10.44 miles
|
DataCanopy: Houston, TX
|
|
|
12.76 miles
|
Equinix Houston HO1
|
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
|
|
13.51 miles
|
Consolidated Woodlands
|
Purpose-built stand-alone data center building, hardened to withstand 185 MPH winds and uplift
Dual underground power feeds from two separate substations
|
|
13.51 miles
|
Stream Houston - Woodlands
|
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor
• Dual underground electric utility feeds power from two substations
• Potential to scale to 6.75 MW of 2N critical load
• Tier III certified by Uptime Institute
|
|
17.40 miles
|
Element Critical: Houston One Bldg-2
|
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
|
|
17.45 miles
|
Skybox Houston One
|
Skybox is built to withstand them all with a 6″ concrete roof deck able to sustain winds up to 190+ mph.
The Skybox Houston Campus is fed by a large loop-fed 300 MVA substation.
|
|
17.48 miles
|
Element Critical Houston One
|
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
|
|
17.51 miles
|
EdgeConneX Houston
|
Customer work spaces are available
Raised Floor: 30"
EdgeConnex has rights to adjacent space to accommodate expansion.
|
|
17.51 miles
|
LOGIX Primewest Pkw
|
The site was operated by Alpheus before Logix acquired it in January 2018.
|
|
17.51 miles
|
ScaleMatrix Houston
|
The Scalematrix site can expand by an additional 15,000 Square Feet
|
|
17.83 miles
|
Serverfarm: HTX2
|
The proposed 565,000 sq ft (52,490 sqm) facility will be located next to the company's existing data center.
|
|
17.89 miles
|
Serverfarm: Houston HTX1
|
In 2024, Serverfarm acquired two data centers in Houston, Texas. The HTX1 data center facility spans an area of 350,000 sq ft.
|
|
19.47 miles
|
Prescott Realty Group-5959 Corporate
|
|
|
19.55 miles
|
LOGIX 4635 Southwest Fwy
|
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
|
19.80 miles
|
DataBank Houston Galleria
|
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|