Axiom Space to launch orbital data center
December 21, 2023
Houston
Space: 27,460 Sq. Feet, 42U Cabinets, Private Cages available, Customer work area with free WiFi
Power: Multiple options, UPS, Backup Generator
Environment: HVAC, Fire Suppression & Detection
Security: 24/7/365 Manned Complex Security, IP Camera Surveillance, Access Controlled
Connectivity: Cogent & other carriers (carrier neutral)
| Distance | Site | About |
|---|---|---|
| 0.07 miles | Fibertown Houston |
Fibertown operates a data center in Houston built around 2011.
|
| 0.07 miles | Lumen Houston 1 |
|
| 0.12 miles | 11:11 Systems: Houston | |
| 0.14 miles | 12001-12235 North Freeway - Digital Realty |
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
|
| 0.48 miles | Switch: Houston 3 |
Switch plans to build data center, in its own style, on a 10-acre adjacent land parcel in Houston.
|
| 0.55 miles | Switch: Houston 2 |
Located in Greenspoint, Data Foundry's Houston 2 site is situated on 18 acres in North Houston. There is a large office area available for lease.
|
| 1.03 miles | Windstream Houston |
Previously a PAETEC data center
|
| 3.19 miles | Equinix Houston HO1 |
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
|
| 8.80 miles | TRG Datacenters: Houston HOU1 |
|
| 8.91 miles | TRG Datacenters: HOU2 |
This facility is part of TRG Datacenters' Houston campus in Houston.
|
| 9.11 miles | Lumen: Houston 5 |
|
| 9.48 miles | Serverfarm: CTX1 DC2 |
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
|
| 9.59 miles | Serverfarm: Houston CTX1 |
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
|
| 9.62 miles | Serverfarm: CTX2 |
The proposed 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data centers.
|
| 10.64 miles | ViVaVerse: Viva Center |
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
| 10.79 miles | DataBank Westway Park I |
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
| 10.87 miles | DataBank Westway Park II |
|
| 11.05 miles | Databank Westway Park III |
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
|
| 11.10 miles | DataCanopy: Houston, TX | |
| 12.57 miles | Lumen Houston 4 |
|
| 12.65 miles | Lumen Houston 3 | |
| 13.12 miles | Two Shell Plaza (777 Walker) |
|
| 13.12 miles | LOGIX Houston (777 Walker) |
The 777 Walker data center is only one city block from the Alpheus fiber network hub at 1010 Travis, and is interconnected with it on a high capacity DWDM system.
|
| 13.13 miles | Quasar Data Center Houston | |
| 13.51 miles | 1301 Fannin - Netrality Houston |
1301 Fannin Street is a 25 story 1.1 million square building which was acquired in 2015 by Netrality. 1301 Fannin is the primary telecom hotel and interconnection point in Houston. Netrality operates as a carrier-neutral facility manages the Meet Me Room
|
| 13.51 miles | Verizon: 1301 Fannin | |
| 14.58 miles | Verizon: 2401 Portsmouth |
Former XO Communications site
|
| 15.01 miles | LOGIX 4635 Southwest Fwy |
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
| 15.02 miles | DataBank Houston Galleria |
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|
| 16.68 miles | Consolidated Woodlands |
Purpose-built stand-alone data center building, hardened to withstand 185 MPH winds and uplift
Dual underground power feeds from two separate substations
|
| 16.70 miles | Stream Houston - Woodlands |
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor • Dual underground electric utility feeds power from two substations • Potential to scale to 6.75 MW of 2N critical load • Tier III certified by Uptime Institute |
| 17.84 miles | Prescott Realty Group-5959 Corporate |
Although debuting at the height of the telecom industry, Cogent soon found vast market wealth eradicated and many other ISPs thrown into a state of turmoil. In a survival of the fittest competition, Cogent became the consolidator in a consolidating market. Over three brief years, Cogent completed 13 acquisitions of other flailing providers. Whether it was an entire company or just select assets, Cogent was able to acquire valuable network assets, customers, peering relationships and building access agreements for pennies on the dollar.
Among Cogent's 13 acquisitions to date include three of the original generation Internet Service Providers who were pioneers in the late 1980s and early 1990s. These companies—PSINet (originally Performance Systems International), NetRail and Aleron (originally AGIS/Net99)—were the earliest providers of commercial Internet service.
Other strategic acquisitions include assets from: Allied Riser, OnSite Access, Fiber City, Fiber Network Solutions, Applied Theory, LambdaNet France and Spain, Carrier1, Unlimited Fiber Optics, Global Access, Aleron, NTT/Verio.
December 21, 2023
Houston
August 22, 2023
Cogent Communications
July 07, 2023
Houston
May 15, 2023
Houston
September 26, 2022
Cogent Communications
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas