- 4 MW Critical Load on Each Floor (Floors 1-5)
- 130-160 Watts per Raised Floor SF
The proposed 565,000 sq ft (52,490 sqm) facility will be located next to the company's existing data center.
Spanning 135 acres, the project, coordinated alongside Vaughn Property Group, will feature six buildings, each totaling 360,000 square feet.
The proposed 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data centers.
In 2024, Serverfarm acquired two data centers in Houston, Texas. The HTX1 data center facility spans an area of 350,000 sq ft.
In 2019, Serverfarm extended its portfolio with a strategic data center acquisition in Amsterdam.
The project involves converting an existing 498,960-square-foot warehouse/distribution facility situated on a 97-acre site at Hazelbrand Road.
IPTO of Greece and Serverfarm have entered into a Heads of Term agreement to form Gemini, a joint venture that will build and operate hyperscale-ready data centers.
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
Server Farm Atlanta at 305 Satellite Blvd was a former AMD data center originally commissioned in 2012 and designed to accommodate approximately 100,000 SF of additional data center space.
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
This former Air Force command and control facility, which is built to withstand a nuclear strike, offers 136,000 square feet of data center space with a uniquely low risk natural disaster profile and an adjacent 11 acres.
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).