TRG Datacenters: Houston HOU1

Latest Podcast 2626 Spring Cypress Rd
Operational
Fully operational facility
Operated by:

TRG Datacenters: Houston HOU1

Short Code: HOU1
Year Built: 2018
Utility Provider: CenterPoint Energy
Lot Size: 10 acres

Sites on this Campus:

░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
  • Gross Colocation Size: 155,000 square feet
  • Utility Provider: CenterPoint Energy
  • Lot Size: 10 Acres
  • Operational Status: Fully Operational
  • Services: Half Rack, Full Rack, Private Cage, Build to Suit

Map and Nearby Locations

2626 Spring Cypress Rd
TRG Datacenters Sites
Nearby Facilities

TRG Datacenters: Houston HOU1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of TRG Datacenters: Houston HOU1

Distance Site About
0.11 miles TRG Datacenters: HOU2
This facility is part of TRG Datacenters' Houston campus in Houston.
7.88 miles Serverfarm: Houston CTX1
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
7.90 miles Consolidated Woodlands
Purpose-built stand-alone data center building, hardened to withstand 185 MPH winds and uplift Dual underground power feeds from two separate substations
7.91 miles Stream Houston - Woodlands
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor
• Dual underground electric utility feeds power from two substations
• Potential to scale to 6.75 MW of 2N critical load
• Tier III certified by Uptime Institute
7.92 miles Serverfarm: CTX1 DC2
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
8.07 miles Serverfarm: CTX2
Serverfarm is constructing a $137 million data center expansion in Harris County, near Houston. The 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data center.
8.54 miles Switch: Houston 2
Located in Greenspoint, Data Foundry's Houston 2 site is situated on 18 acres in North Houston. There is a large office area available for lease.
8.60 miles Switch: Houston 3
Switch plans to build data center, in its own style, on a 10-acre adjacent land parcel in Houston.
8.80 miles Cogent: 12061 N Freeway
Cogent's 27,000 sqft data center in Houston offers retail colocation
8.85 miles Lumen Houston 1
8.87 miles Fibertown Houston
Fibertown operates a data center in Houston built around 2011.
8.92 miles 11:11 Systems: Houston
8.92 miles 12001-12235 North Freeway - Digital Realty
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
9.29 miles ViVaVerse: Viva Center
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
9.83 miles Windstream Houston
Previously a PAETEC data center
10.66 miles Equinix Houston HO1
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
14.22 miles Lumen: Houston 5
16.36 miles DataBank Westway Park I
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
16.40 miles DataBank Westway Park II
16.49 miles Databank Westway Park III
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
16.52 miles DataCanopy: Houston, TX

TRG Datacenters: Houston HOU1 Data Center Photos See all

Rendering of TRG Datacenters' HOU2 Facility in Houston
Source: TRG Datacenters
TRG HOU1 Internal 3
Source: TRG Datacenters
TRG HOU1 Internal 2
Source: TRG Datacenters
TRG Datacenters' Houston 1 site in Houston
Source: TRG Datacenters

Operating Company

Operated by:
2
Facilities
1
Markets

News See all

Read TRG Datacenters Now Acquired by Tallvine Partners
TRG Datacenters Now Acquired by Tallvine Partners

TRG Datacenters Now Acquired by Tallvine Partners

August 06, 2025 TRG Datacenters

Investment firm Tallvine Partners this week announced the acquisition of Houston-based TRG Datacenters. TRG’s first and to-date only data center launched in 2018. The site totals 150,000 sq ft (13,935 sqm). Tallvine said its investment will fund TRG’s next phase of growth, including a planned...

Read more
Read Axiom Space to launch orbital data center
Axiom Space to launch orbital data center

Axiom Space to launch orbital data center

December 21, 2023 Houston

Space infrastructure business Axiom Space has planned to develop an 'orbital data center.' The company is currently developing the world’s first commercial space station, which will initially be a part of the International Space Station, but is planned to separate and remain in orbit, once the...

Read more
Read University of Houston will establish a new energy-focused data facility
University of Houston will establish a new energy-focused data facility

University of Houston will establish a new energy-focused data facility

July 07, 2023 Houston

On Friday, July 7, UH Energy will host an educational symposium with a focus on hydrocarbon basin analysis, policy changes, and hydrocarbon opportunities in India to mark the opening of the new University of Houston (UH) - Directorate General for Hydrocarbon (DGH) Center for Hydrocarbon...

Read more
Read Netrality Data Centers to expand capacity in Houston
Netrality Data Centers to expand capacity in Houston

Netrality Data Centers to expand capacity in Houston

May 15, 2023 Houston

Netrality Data Centers has announced that it is expanding capacity at its Houston data center at 1301 Fannin Street. The company has shared that it will add two new data center halls spanning 17,000 square feet and offering over 2.5 megawatts of critical capacity.Due to come online at the end of...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?