This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas. Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
| Distance | Site | About |
|---|---|---|
| 0.16 miles | Serverfarm: Houston CTX1 |
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
|
| 0.17 miles | Serverfarm: CTX2 |
The proposed 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data centers.
|
| 1.45 miles | ViVaVerse: Viva Center |
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
| 7.92 miles | TRG Datacenters: Houston HOU1 |
|
| 7.95 miles | TRG Datacenters: HOU2 |
This facility is part of TRG Datacenters' Houston campus in Houston.
|
| 8.43 miles | Lumen: Houston 5 |
|
| 8.93 miles | Switch: Houston 2 |
Located in Greenspoint, Data Foundry's Houston 2 site is situated on 18 acres in North Houston. There is a large office area available for lease.
|
| 9.01 miles | Switch: Houston 3 |
Switch plans to build data center, in its own style, on a 10-acre adjacent land parcel in Houston.
|
| 9.48 miles | Lumen Houston 1 |
|
| 9.48 miles | Cogent: 12061 N Freeway |
Cogent's 27,000 sqft data center in Houston offers retail colocation
|
| 9.49 miles | 12001-12235 North Freeway - Digital Realty |
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
|
| 9.50 miles | Fibertown Houston |
Fibertown operates a data center in Houston built around 2011.
|
| 9.55 miles | 11:11 Systems: Houston | |
| 10.13 miles | Windstream Houston |
Previously a PAETEC data center
|
| 10.44 miles | DataBank Westway Park I |
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
| 10.45 miles | DataBank Westway Park II |
|
| 10.45 miles | Databank Westway Park III |
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
|
| 10.47 miles | DataCanopy: Houston, TX | |
| 12.62 miles | Equinix Houston HO1 |
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
|
| 13.42 miles | Consolidated Woodlands |
Purpose-built stand-alone data center building, hardened to withstand 185 MPH winds and uplift
Dual underground power feeds from two separate substations
|
| 13.46 miles | Stream Houston - Woodlands |
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor • Dual underground electric utility feeds power from two substations • Potential to scale to 6.75 MW of 2N critical load • Tier III certified by Uptime Institute |
| 17.53 miles | Element Critical: Houston One Bldg-2 |
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
|
| 17.58 miles | Skybox Houston One |
Skybox is built to withstand them all with a 6″ concrete roof deck able to sustain winds up to 190+ mph.
The Skybox Houston Campus is fed by a large loop-fed 300 MVA substation.
|
| 17.61 miles | Element Critical Houston One |
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
|
| 17.63 miles | EdgeConneX Houston |
Customer work spaces are available
Raised Floor: 30"
EdgeConnex has rights to adjacent space to accommodate expansion.
|
| 17.64 miles | LOGIX Primewest Pkw |
The site was operated by Alpheus before Logix acquired it in January 2018.
|
| 17.64 miles | ScaleMatrix Houston |
The Scalematrix site can expand by an additional 15,000 Square Feet
|
| 18.00 miles | Serverfarm: HTX2 |
The proposed 565,000 sq ft (52,490 sqm) facility will be located next to the company's existing data center.
|
| 18.05 miles | Serverfarm: Houston HTX1 |
In 2024, Serverfarm acquired two data centers in Houston, Texas. The HTX1 data center facility spans an area of 350,000 sq ft.
|
| 19.49 miles | Prescott Realty Group-5959 Corporate | |
| 19.53 miles | LOGIX 4635 Southwest Fwy |
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
| 19.78 miles | DataBank Houston Galleria |
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|
Founded in 2010 Server Farm Realty (SFR) develops, operates and leases data center space.
The company is a wholly owned subsidiary of the Red Sea Group, a global investment company that develops real estate assets around the world, including hotels, residential developments, and data centers.
December 21, 2023
Houston
September 08, 2023
ServerFarm Realty
July 07, 2023
Houston
May 22, 2023
ServerFarm Realty
May 15, 2023
Houston
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas