Consolidated Woodlands

Latest Podcast 4001 Technology Forest Blvd.
OperationalPlanned
Operational with future phases planned
Operated by:

Consolidated Woodlands

Site was first built in 2013 and has expansions through 2028
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size
  • Purpose-built stand-alone data center building, hardened to withstand 185 MPH winds and uplift
  • Dual underground power feeds from two separate substations
  • Concrete roof deck with a fully adhered Sarnafil waterproof membrane
  • Data Center Suite with 10,000 SF of raised floor, no shared infrastructure or equipment
  • Data Center Suite will deliver 1.125 KW critical load, and is pre-engineered to expand to 2,250 KW
  • 2N electrical, N+1 mechanical configuration
  • 36 inch raised floor, fully commissioned data center space
  • K4-rated, perimeter fencing, two controlled access points
  • Seven days of on-site diesel fuel storage, development site is outside the 500 year flood plain
  • Biometric scanners and card key access into all critical areas
  • 24/7 on-site security and numerous internal and external security cameras monitored on-site

Map and Nearby Locations

4001 Technology Forest Blvd.
Consolidated Communications Sites
Nearby Facilities

Consolidated Woodlands Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Consolidated Woodlands

Distance Site About
0.01 miles Stream Houston - Woodlands
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor
• Dual underground electric utility feeds power from two substations
• Potential to scale to 6.75 MW of 2N critical load
• Tier III certified by Uptime Institute
7.79 miles TRG Datacenters: HOU2
This facility is part of TRG Datacenters' Houston campus in Houston.
7.90 miles TRG Datacenters: Houston HOU1
13.30 miles Serverfarm: CTX1 Building 1
Serverfarm's original CTX1 Building 1, a 214,446 sq ft data center at 15555 Cutten Road built for HP. Serverfarm demolished it in 2025 and is building CTX2 on its footprint.
13.31 miles Serverfarm: CTX2
CTX2 is a data center under construction at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, on the footprint of the original CTX1 Building 1.
13.42 miles Serverfarm: CTX1 Building 2
CTX1 Building 2 is a 263,811 sq ft data center at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, built for HP and refit for a tenant in 2025.
14.34 miles ViVaVerse: Viva Center
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
16.50 miles Switch: Houston 3
Houston 3 is Switch's planned second data center on the vacant west 10 acres of its Greenspoint campus in North Houston. Switch announced it with the 2021 Data Foundry purchase; no building permit has been filed.
16.50 miles Switch: Houston 2
Houston 2 is a 125,000 sq ft purpose-built data center with a two-story office wing on Switch's Greenspoint campus in North Houston. Data Foundry opened it in 2015 and added a second data hall in 2020; Switch bought it in 2021 and added a UPS and generator wing on the south side.
16.68 miles Cogent: 12061 N Freeway
Cogent's 27,000 sqft data center in Houston offers retail colocation
16.74 miles Lumen Houston 1
16.75 miles Fibertown Houston
Fibertown operates a data center in Houston built around 2011.
16.80 miles 11:11 Systems: Houston
16.81 miles 12001-12235 North Freeway - Digital Realty
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
17.48 miles Comcast: Willis
Comcast is developing a data center in Willis, Montgomery County, which is located just outside of Houston.
17.53 miles The Houston Bunker
Located 45 miles north of downtown Houston in Montgomery County, Texas; the Westland Bunker Campus is a historic fortress with modern robustness and redundant connectivity.
17.57 miles Data Journey: Houston Bunker
Data Journey acquired the Montgomery facility, located on 58 acres outside Houston, in 2024.
17.72 miles Windstream Houston
Previously a PAETEC data center
18.27 miles Equinix Houston HO1
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.

Operating Company

Operated by:

Consolidated Communications provides business and broadband communications services across a 23-state service area to carrier, commercial and consumer customers. Consolidated Communications offers a wide range of communications solutions including: High-Speed Internet, Data, Digital TV, Phone, managed and cloud services and wireless backhaul.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Axiom Space to launch orbital data center
Axiom Space to launch orbital data center

Axiom Space to launch orbital data center

December 21, 2023 Houston

Space infrastructure business Axiom Space has planned to develop an 'orbital data center.' The company is currently developing the world’s first commercial space station, which will initially be a part of the International Space Station, but is planned to separate and remain in orbit, once the...

Read more
Read University of Houston will establish a new energy-focused data facility
University of Houston will establish a new energy-focused data facility

University of Houston will establish a new energy-focused data facility

July 07, 2023 Houston

On Friday, July 7, UH Energy will host an educational symposium with a focus on hydrocarbon basin analysis, policy changes, and hydrocarbon opportunities in India to mark the opening of the new University of Houston (UH) - Directorate General for Hydrocarbon (DGH) Center for Hydrocarbon...

Read more
Read Netrality Data Centers to expand capacity in Houston
Netrality Data Centers to expand capacity in Houston

Netrality Data Centers to expand capacity in Houston

May 15, 2023 Houston

Netrality Data Centers has announced that it is expanding capacity at its Houston data center at 1301 Fannin Street. The company has shared that it will add two new data center halls spanning 17,000 square feet and offering over 2.5 megawatts of critical capacity.Due to come online at the end of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?