0.01 miles
|
Stream Houston - Woodlands
|
• Building is hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor
• Dual underground electric utility feeds power from two substations
• Potential to scale to 6.75 MW of 2N critical load
• Tier III certified by Uptime Institute
|
|
7.79 miles
|
TRG Datacenters: HOU2
|
This facility is part of TRG Datacenters' Houston campus in Houston.
|
|
7.90 miles
|
TRG Datacenters: Houston HOU1
|
|
|
13.30 miles
|
Serverfarm: CTX1 Building 1
|
Serverfarm's original CTX1 Building 1, a 214,446 sq ft data center at 15555 Cutten Road built for HP. Serverfarm demolished it in 2025 and is building CTX2 on its footprint.
|
|
13.31 miles
|
Serverfarm: CTX2
|
CTX2 is a data center under construction at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, on the footprint of the original CTX1 Building 1.
|
|
13.42 miles
|
Serverfarm: CTX1 Building 2
|
CTX1 Building 2 is a 263,811 sq ft data center at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, built for HP and refit for a tenant in 2025.
|
|
14.34 miles
|
ViVaVerse: Viva Center
|
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
|
16.50 miles
|
Switch: Houston 3
|
Houston 3 is Switch's planned second data center on the vacant west 10 acres of its Greenspoint campus in North Houston. Switch announced it with the 2021 Data Foundry purchase; no building permit has been filed.
|
|
16.50 miles
|
Switch: Houston 2
|
Houston 2 is a 125,000 sq ft purpose-built data center with a two-story office wing on Switch's Greenspoint campus in North Houston. Data Foundry opened it in 2015 and added a second data hall in 2020; Switch bought it in 2021 and added a UPS and generator wing on the south side.
|
|
16.68 miles
|
Cogent: 12061 N Freeway
|
Cogent's 27,000 sqft data center in Houston offers retail colocation
|
|
16.74 miles
|
Lumen Houston 1
|
|
|
16.75 miles
|
Fibertown Houston
|
Fibertown operates a data center in Houston built around 2011.
|
|
16.80 miles
|
11:11 Systems: Houston
|
|
|
16.81 miles
|
12001-12235 North Freeway - Digital Realty
|
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
|
|
17.48 miles
|
Comcast: Willis
|
Comcast is developing a data center in Willis, Montgomery County, which is located just outside of Houston.
|
|
17.53 miles
|
The Houston Bunker
|
Located 45 miles north of downtown Houston in Montgomery County, Texas; the Westland Bunker Campus is a historic fortress with modern robustness and redundant connectivity.
|
|
17.57 miles
|
Data Journey: Houston Bunker
|
Data Journey acquired the Montgomery facility, located on 58 acres outside Houston, in 2024.
|
|
17.72 miles
|
Windstream Houston
|
Previously a PAETEC data center
|
|
18.27 miles
|
Equinix Houston HO1
|
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
|