Located within an established trading estate to the south of London, Digital Woking provides approximately 18,580m (200,000ft ) of net technical space. The facility sits on a substantial site of circa 12 acres enabling the provision of flexible plant solutions and allocated parking.

Site History

  • Sentrum acquired the Woking facility in October 2007, which was a former distribution centre.
  • The facility was commissioned in April 2009.
  • Sentrum in turn were acquired by Digital Realty Trust in 2012

Map and Nearby Locations:

21 (Unit 21)
Click Map to begin Search

Sites within 15 miles of Digital Realty Woking

Show SqM
Distance Site About
0.00 miles CyrusOne London Woking
0.09 miles Redcentric Woking TC3
0.09 miles NaviSite Woking
3.89 miles Ark: Longcross
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
3.94 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
4.87 miles 4D Surrey
Based in Byfleet, 4D's Tier-3 Surrey data centre is close to M25 and about 30 minutes to London Waterloo. It's carrier neutral and offers u-space, quarter, half and full racks with options for data halls and suites.
6.87 miles Zayo Egham
9.55 miles Datum FRN1
9.77 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
9.78 miles Ark: Cody Park
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
9.84 miles Level3 Bracknell
10.25 miles ServerFarm London
3,000 m² of data hall expansion space available within 6 – 9 months Concurrently maintainable standards
12.20 miles Verizon London UK4
12.23 miles DRT London (West Drayton)
12.84 miles Redcentric Hounslow
12.97 miles Yondr Slough
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
12.98 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
13.17 miles DRT London (Chessington)
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
13.27 miles Pulsant Maidenhead P1
13.31 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
13.38 miles Cyxtera: LHR1
13.39 miles NTT Slough 2
13.40 miles CyrusOne LON5
13.41 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
13.47 miles GTR: Slough
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
13.48 miles GTR: Slough 2
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
13.49 miles GTR: Slough 3
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
13.50 miles Cyxtera Slough LO5
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
13.55 miles VIRTUS LONDON9
13.59 miles VIRTUS London 11
13.66 miles GoDaddy Slough (HEG)
13.66 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
13.67 miles China Mobile Slough
13.68 miles Logicalis Slough
13.69 miles CyrusOne: London II
13.71 miles VIRTUS LONDON10
13.74 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
13.77 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
13.80 miles Equinix LD13x
13.81 miles Level3 Slough
13.84 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
13.84 miles QTS London
13.85 miles Iron Mountain London LON-2
13.86 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
13.87 miles Equinix LD10
13.87 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
13.94 miles VIRTUS: London 14
The data center, currently under construction, will span two floors upon completion. It will offer 8,600 square meters of white space divided among 6 data halls.
13.95 miles Equinix LD11x
13.95 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
14.01 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
14.02 miles Equinix LD6
14.06 miles VIRTUS Stockley Park Campus
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
14.07 miles Equinix LD14
14.07 miles Equinix LD12
14.07 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
14.09 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
14.11 miles Equinix LD7
14.12 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
14.17 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
14.24 miles VIRTUS Hayes London2
14.46 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
15.01 miles Cyxtera Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
15.28 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
15.37 miles iomart DC5 Maidenhead
17.70 miles Redwire
17.84 miles Pulsant Reading East 2
18.05 miles Redcentric Reading
18.06 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
18.07 miles Barclays Data Centre
18.38 miles Amito Reading
19.24 miles Digital Realty: LGW11
19.30 miles Digital Redhill (Foxboro Park)
1 Foxboro Park, Redhill is fully leased
2 Foxboro Park, Redhill is fully leased
19.31 miles LexisNexis Redhill UK
19.32 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
19.61 miles Equinix London LD3
19.81 miles DRT London (Croydon)
19.87 miles Vantage London II

Digital Realty Woking Data Center Photos


Driving directions to Digital Woking at Unit 21 of the Goldsworth Park Trading Estate
Source: DRT

Entrance to Woking facility

Operating Company

Digital Realty Trust, a real estate investment trust (REIT), engages in the ownership, acquisition, development, redevelopment, and management of of strategically located properties containing applications and operations critical to the day-to-day operations of technology industry tenants and corporate enterprise datacenter users.

212 Facilities Owned
41 Markets Served
2585.85 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
digital_woking_br_may2019 May 2019

DRT Woking Data Sheet (PDF)