Viasat launches new headquarters in London
April 15, 2024
London
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
| Distance | Site | About |
|---|---|---|
| 0.07 miles | Virtus: Saunderton Campus |
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
|
| 0.08 miles | Virtus: London 17 |
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
|
| 0.11 miles | Virtus: London 16 |
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
|
| 4.67 miles | DRT London (Cresses Business Park) |
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
|
| 4.69 miles | CapitaLand: Cressex Business Park |
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
|
| 5.06 miles | Wycombe Air Park |
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
|
| 7.39 miles | QuickHostUK: High Wycombe |
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
| 9.37 miles | Echelon LCY20 |
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
|
| 11.35 miles | iomart DC5 Maidenhead |
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
| 13.45 miles | Pulsant: Maidenhead SE-2 |
|
| 13.53 miles | Virgin Media O2 Slough |
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
| 13.53 miles | Iron Mountain London LON-1 |
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
| 13.57 miles | Equinix LD7 |
|
| 13.62 miles | Equinix LD11x | |
| 13.62 miles | Equinix LD6 | |
| 13.64 miles | Equinix LD12 | |
| 13.64 miles | Equinix LD14 | |
| 13.67 miles | Equinix LD4 |
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
| 13.76 miles | CyrusOne London III |
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
| 13.89 miles | Equinix LD5 |
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
| 14.02 miles | Equinix LD10 |
|
| 14.04 miles | CyrusOne London I |
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
| 14.04 miles | VIRTUS Slough London 3 and 4 |
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
| 14.04 miles | China Mobile Slough | |
| 14.05 miles | Equinix LD13x | |
| 14.10 miles | Equinix Slough Campus LD4, LD5, LD6, LD10 |
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
| 14.18 miles | VIRTUS London 11 | |
| 14.19 miles | VIRTUS LONDON10 | |
| 14.20 miles | Lumen Slough |
|
| 14.20 miles | Iron Mountain London LON-2 | |
| 14.21 miles | Logicalis Slough | |
| 14.25 miles | Iron Mountain: LON3 |
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
| 14.26 miles | GoDaddy Slough (HEG) | |
| 14.26 miles | Rackspace London Slough (LON3) |
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
| 14.29 miles | CyrusOne LON5 | |
| 14.36 miles | VIRTUS LONDON9 | |
| 14.37 miles | GTR: Slough 3 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 14.39 miles | GTR: Slough 2 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 14.41 miles | GTR: Slough |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 14.44 miles | Creslow Park |
Creslow Park is a data center located in a rural area of Buckinghamshire, United Kingdom.
|
| 14.48 miles | Digital Realty: LHR27 |
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
|
| 14.48 miles | Segro: Slough 2 |
This planned facility will be part of Segro's London Slough Campus.
|
| 14.52 miles | Digital Realty: LHR26 |
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
|
| 14.54 miles | NTT Slough 3 |
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
| 14.60 miles | Segro: London Slough Campus |
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
|
| 14.60 miles | Kao Data Slough |
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
| 14.61 miles | NTT Slough 2 |
|
| 15.69 miles | Gravity Edge: London LDN2 | |
| 15.80 miles | Yondr: Slough Campus |
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
| 15.81 miles | Yondr: Slough 2 |
This facility is part of Yondr's London Slough Campus.
|
| 15.81 miles | Equinix: Wexham Road |
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
| 15.85 miles | Yondr: Slough 3 |
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
|
| 15.90 miles | Pinewood: Slough Campus |
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
|
| 16.01 miles | CyrusOne: London LON6 |
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
| 16.06 miles | CyrusOne: LON6 Bldg2 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 16.06 miles | Pulsant: Reading SE-4 |
|
| 16.13 miles | CyrusOne: LON6 Bldg3 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 16.19 miles | CyrusOne: LON6 Bldg4 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 16.24 miles | CyrusOne: LON6 Bldg5 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 16.30 miles | CyrusOne: LON6 Bldg6 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 16.90 miles | Centersquare: Reading LHR3 |
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
| 17.38 miles | Sequence: Iver, Buckinghamshire |
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
| 17.51 miles | CapitaLand: Chess Building |
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
|
| 17.52 miles | Lunar 5 |
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
|
| 17.64 miles | West London Tech Park |
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
| 17.65 miles | West London Tech Bldg2 |
This facility is part of Greystoke's West London Tech Park.
|
| 17.70 miles | NTT Hempstead 2 |
|
| 17.73 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services UK Limited has filed plans to develop a new tape library data center at Plot 3, Maylands Avenue, Hemel Hempstead, Hertfordshire (HP2 4FQ), outside London. The project covers a 0.6-hectare (1.48-acre) site and involves construction of a two-story, 1,935 sqm (20,840 sq ft) facility. The application was validated in February 2026 and is currently in the planning stage.
|
| 17.76 miles | Northtree: Hemel Hempstead |
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
|
| 17.76 miles | Hyperscale Data Center Request Dataset | |
| 17.81 miles | Thorney: Iver DC-F |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 17.86 miles | NTT Hempstead 3 |
|
| 17.86 miles | Thorney: Iver DC-E |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 17.90 miles | Thorney: Iver DC-D |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 17.93 miles | Thorney: Iver DC-C |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 17.94 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
|
| 17.95 miles | NTT Hempstead 1 |
|
| 17.99 miles | Thorney: Iver DC-B |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 18.00 miles | NTT Hempstead4 |
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
|
| 18.01 miles | Thorney: Iver DC-A |
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 18.02 miles | Hyperscale Data Center Request Dataset | |
| 18.03 miles | Segro: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 18.04 miles | Thorney Lane LLP: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 18.15 miles | Abbots Langley Data Centre |
|
| 18.27 miles | Digital Reef: Didcot Tech Park |
Digital Reef (part of Reef Group) is planning a data center and technology park at Hill Farm, Didcot, Oxfordshire.
|
| 18.31 miles | CorScale: Court Lane, Iver |
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
|
| 18.32 miles | Keppel: London Bracknell |
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
| 18.33 miles | Vodafone: London Bracknell |
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
| 18.41 miles | CentriLogic Berkshire |
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
| 18.46 miles | Hyperscale Data Center Request Dataset |
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
|
| 18.49 miles | Amito Reading | |
| 18.50 miles | Pulsant: Reading SE-3 |
|
| 18.52 miles | Asanti: Reading |
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
| 18.54 miles | Level3 Bracknell | |
| 18.63 miles | Hyperscale Data Center Request Dataset | |
| 18.75 miles | RWE: Didcot |
RWE has submitted a planning application to The Vale of White Horse District Council for a new data centre campus.
|
| 18.80 miles | Stellanor: Reading |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 18.90 miles | Hyperscale Data Center Request Dataset |
The Amazon's two data center campus was built adjacent to the Didcot Power Station under the pseudonym Willow Developments LLC.
The single-story facility will span 8,692 sq m (94,000 sq ft), while the two-story one will take up 20,800 sqm (224,000 sq ft).
The company also plans to deploy 52 3-MVA diesel generators for backup power, four of which would be secondary backup generators. Two additional 1MVA generators were proposed for powering administrative sections of the sit
|
| 19.02 miles | Hyperscale Data Center Request Dataset |
This is the second data center building of Amazon's Didcot campus.
|
| 19.12 miles | CloudHQ: Didcot LHR Campus |
CloudHQ’s 37.5-acre LHR campus in Didcot, England, is one of the largest fully permitted and powered data center campuses in the London metropolitan area.
|
| 19.17 miles | Link Park Heathrow Data Center |
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
| 19.18 miles | CloudHQ: LHR 2 |
This facility will be part of CloudHQ's LHR campus in Didcot, England.
|
| 19.37 miles | Tritax: London Slough (Phase 2) |
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
| 19.44 miles | Tritax: London Slough (Phase 1) |
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
| 19.86 miles | VIRTUS: London 7 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
| 19.89 miles | VIRTUS: London 8 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
| 19.98 miles | VIRTUS: London 6 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas